Variation of Conditions 2 and 8 Part (0) of planning permission reference DCC/4177/2020 for the proposed widening (7.5km) of the carriageway between Portmore Roundabout (Barnstaple) and Filleigh Cutting (Nr. South Molton), including junction improvements at Landkey and West Buckland; provision of a ...

A361 North Devon Link Road between Portmore Roundabout (Barnstaple) and Filleigh Cutting (Nr. South Molton)

Application ApprovedReference: DCC/4304/2022Devon County Council

Last published check: 14 Sept 2026, 23:42. Check the council record for more recent changes.

Application location

A361 North Devon Link Road between Portmore Roundabout (Barnstaple) and Filleigh Cutting (Nr. South Molton)

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Variation of Condition
Received
13 May 2022
Validated
13 Jun 2022
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Variation of Conditions 2 and 8 Part (0) of planning permission reference DCC/4177/2020 for the proposed widening (7.5km) of the carriageway between Portmore Roundabout (Barnstaple) and Filleigh Cutting (Nr. South Molton), including junction improvements at Landkey and West Buckland; provision of a ...

Proposal details

Reference
DCC/4304/2022
Agent
Mr William Morgan

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 199 of 199

DocumentPublishedAction
RECOMMENDATIONS REVIEW_DCC-4304-2022.pdfDecision Notice pdf15 Sept 2022View
ARTICLE 27 LETTER (DETERMINATION OF CONDITIONS & LETTER)_DCC-4304-2022(1).pdfArticle 27 (Decision & Letter) - condition 8 & 13 pdf14 Dec 2023View
NON-MATERIAL AMENDMENT LETTER (APPROVED)_DCC-4304-2022.pdfNMA Grant Covering Letter (pdf)24 Jul 2024View
OFFICERS DELEGATED REPORT_DCC-4304-2022.pdfOfficers Delegated Report pdf15 Sept 2022View
OFFICER'S DELEGATED REPORT DISCHARGE OF CONDITIONS_DCC-4304-2022.pdfArticle 27 (Officers Report) - condition 8 & 13 pdf14 Dec 2023View
OFFICERS DELEGATED REPORT NON MATERIAL AMENDMENT_DCC-4304-2022(1).pdfNMA Officers Delegated Report (pdf)24 Jul 2024View
20220516143128458.pdfApplication Form (redacted)16 May 2022View
NDLR-AGC-SBR-05309-DR-CB-1701_P01.pdfGeneral Arrangement - NDLR-AGC-SBR-05309-DR-CB-1701 Rev P0116 May 2022View
NDLR-AGC-SBR-05309-SK-CB-1700_P02.pdfProposed and Illustrative Elevation Comparison - NDLR-AGC-SBR-05309-SK-CB-1700 Rev P0216 May 2022View
NDLR-AGC-SBR-05309-TN-WM-0001 Portmore Footbridge Supporting Statement.pdfSupporting Statement.pdf16 May 2022View
Comments.pdfDCC Highways Response 22/06/202222 Jun 2022View
397684 DCC43042022 NE Response.pdfNatural England Response 23/06/202223 Jun 2022View
Comments(1).pdfDCC Road Safety Response 28/06/202228 Jun 2022View
National Highways Response_redacted.pdfNational Highways Response 01/07/20224 Jul 2022View
Decision Notice_75486.pdfNorth Devon District Council Reponse 07/07/20227 Jul 2022View
Public Health Feedback 4304-2022 A361 portman bridge .pdfDCC Public Health Response 12/07/202213 Jul 2022View
Covering Letter_redacted.pdfCondition 8 - Covering Letter (Redacted)12 Apr 2023View
60952-SCH-Planting schedules-Plant quantities-P1-S3.pdfCondition 8(b) - Landscape Proposals Plant Quantity Schedules12 Apr 2023View
MCHW series_3000.pdfCondition 8(b) - Landscape and Ecology12 Apr 2023View
NDLR-TAC-ELS-ZZ-SP-LE-3000_C01.pdfCondition 8(b, i) - Landscape and Ecology Appendices12 Apr 2023View
NDLR-STN-HFE-LJR-DR-CH-0300_C01.pdfCondition 8(g) - (Section 1B) Landkey Junction Roundabout Fencing Layout12 Apr 2023View
NDLR-STN-HFE-HSJ-DR-CH-0301_C01.pdfCondition 8(g) - (Section 2) Harford to Swimbridge Proposed Fencing Layout (sheet 1 of 4)12 Apr 2023View
NDLR-STN-HFE-HSJ-DR-CH-0302_C01.pdfCondition 8(g) - (Section 2) Harford to Swimbridge Proposed Fencing Layout (sheet 2 of 4)12 Apr 2023View
NDLR-STN-HFE-HSJ-DR-CH-0303_C01.pdfCondition 8(g) - (Section 2) Harford to Swimbridge Proposed Fencing Layout (sheet 3 of 4)12 Apr 2023View
NDLR-STN-HFE-HSJ-DR-CH-0304_C01.pdfCondition 8(g) - (Section 2) Harford to Swimbridge Proposed Fencing Layout (Sheet 4 of 4)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0301_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 1 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0302_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 2 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0303_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 3 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0304_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 4 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0305_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 5 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0306_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 6 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0307_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 7 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0308_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 8 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0309_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 9 of 10)12 Apr 2023View
NDLR-TG-HFE-SJF-DR-CH-0310_C01.pdfCondition 8(g) - (Section 3) Swimbridge Cutting to Filleigh Cutting Proposed Fencing (Sheet 10 of 10)12 Apr 2023View
C_00_AP_03 - Proposed Pheasant Fencing - Rev 1.pdfCondition 8(g) - Proposed Pheasant Fencing12 Apr 2023View
C_00_AP_05 5 BAR.pdfCondition 8(g) - Advanced Planting Timber Post and 5 Rail Fence With Netting12 Apr 2023View
fn_4 bar_Nov2020.pdfCondition 8(g) - Standard Details - Timber Post and 4 Rail Fence12 Apr 2023View
SHW H series Standard Drawings.pdfCondition 8(g) - Temporary Fences Types 1 & 212 Apr 2023View
NDLR-TG-HFE-ZZ-SP-CH-0300_C01.pdfCondition 8(g,h) - Specification Appendices Fencing12 Apr 2023View
Devon Hedge Bank TUE80783a-C-SD-45 A.pdfCondition 8(h) - Standard Detail - Devon Hedge Bank12 Apr 2023View
NDLR-TG-HKF-ZZ-DE-CH-1120_C01 (1).pdfCondition 8(m) - Kerbs, Footways and Paved Areas Typical Details (Sheet 1 of 1)12 Apr 2023View
NDLR-AGC-GEN-ZZ-TN-WM-0002 C8(o) Note.pdfCondition 8(o)- Summary of Information12 Apr 2023View
NDLR-AGC-SBR-05311-DR-CB-1702(2).pdfCondition 8(o)- West Buckland Bridge Panel Joint Arrangement12 Apr 2023View
NDLR-AGC-SBR-05311-PH-CB-1701(1).pdfCondition 8(o)- West Buckland Trial Panel Photo12 Apr 2023View
NDLR-AGC-SBR-05311-PH-CB-1702.pdfCondition 8(o)- West Buckland Panel Render12 Apr 2023View
NDLR-TAC-ELS-SJF-DR-LE-3007_P01.pdfCondition 8(o)- (Section 3) Swimbridge to Filleigh - Landscape Proposals12 Apr 2023View
NDLR-TG-SBR-05311-DR-CB-1701-P02.pdfCondition 8(o)- West Buckland Existing GA12 Apr 2023View
NDLR-TG-SBR-05311-DR-CB-1702-P03.pdfCondition 8(o)- West Buckland Proposed GA12 Apr 2023View
NDLR-TG-SBR-05311-DR-CB-1703-P03.pdfCondition 8(o) - West Buckland Proposed Elevations12 Apr 2023View
NDLR-AGC-SBR-05311-DR-CB-1702-P01.pdfCondition 8(o) - West Buckland Bridge Appearance Details - Abutment Elevation14 Sept 2023View
NDLR-STN-HDG-LJR-DR-CD-0502_C01_Ver4 (1) Landkey Junction Roundabout Drainage Attenuation Basin 1 Section.pdfCondition 8 (K, N) - (Section 1B) Landkey Junction Roundabout Drainage Attenuation Basin 1 Section15 Sept 2023View
NDLR-STN-HDG-LJR-DR-CD-0503_C02_Ver5 Landkey Junction Roundabout Drainage Attenuation Basin 2 Section.pdfCondition 8 (K, N) - (Section 1B) Landkey Junction Roundabout Drainage Attenuation Basin 2 Section15 Sept 2023View
NDLR-STN-HDG-HSJ-DE-CD-0509_Ver2 (1).pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Proposed Basin 01 and 02 Construction Details15 Sept 2023View
NDLR-STN-HDG-HSJ-DE-CD-0551_Ver3 Hardofrd to Swimbridge Drainage Standard Details.pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Drainage Standard Details15 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0501_Ver6 Harford to Swimbridge Proposed drainage Layout.pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Proposed Drainage Layout (1 of 4)15 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0502_C02_Ver7 (1).pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Proposed Drainage Layout (2 of 4)15 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0503_Ver5 Harford To Swimbridge Proposed Drainage Layout.pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Proposed Drainage Layout (3 of 4)15 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0507_Ver3 Harford to Swimbridge Proposed Pond 1 & 2 Cross Sections and Long Section.pdfCondition 8 (K, N) - (Section 2) Harford to Swimbridge Proposed Pond 1 & 2 Cross Sections And Long Section15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0512-P03_Ver6 Swimbridge to Filleigh Proposed drainage Layout.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (2 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0513-P03_Ver6 Swimbridge to Filleigh Proposed Drainage Layout.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (3 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0514.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (4 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0515.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (5 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0516-P04_Ver6 Swimbridge to Filleigh Proposed Drainage Layout.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (6 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0517-P04_Ver6 Swimbridge to Filleigh Proposed Drainage Layout.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (7 of 10)15 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0518-P04_Ver6 (1) Swimbridge to Filleigh Proposed Drainage Layout.pdfCondition 8 (K, N) - (Section 3) Swimbridge to Filleigh Proposed Drainage Layout (8 of 10)15 Sept 2023View
NDLR-STN-HGT-LJR-DR-CE-0600.pdfCondition 8 (j) - (Section 1B) Landkey Junction Roundabout Earthworks Plan21 Sept 2023View
NDLR-STN-HGT-HSJ-DR-CE-0601.pdfCondition 8 (j) - (Section 2) Harford to Swimbridge Proposed Earthworks Plan (1 of 4)21 Sept 2023View
NDLR-STN-HGT-HSJ-DR-CE-0602.pdfCondition 8 (j) - (Section 2) Harford to Swimbridge Proposed Earthworks Plan (2 of 4)21 Sept 2023View
NDLR-STN-HGT-HSJ-DR-CE-0603.pdfCondition 8 (j) - (Section 2) Harford to Swimbridge Proposed Earthworks Plan (3 of 4)21 Sept 2023View
NDLR-STN-HGT-HSJ-DR-CE-0604.pdfCondition 8 (j) - (Section 2) Harford to Swimbridge Proposed Earthworks Plan (4 of 4)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0601.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (1 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0602.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (2 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0603.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (3 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0604.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (4 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0605.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (5 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0606.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (6 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0607.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (7 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0608.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (8 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0609.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (9 of 10)21 Sept 2023View
NDLR-TG-HGT-SJF-DR-CE-0610.pdfCondition 8 (j) - (Section 3) Swimbridge to Filleigh Proposed Earthworks (10 of 10)21 Sept 2023View
NDLR-STN-HLG-ZZ-SP-EO-1300_P01_Ver2.pdfCondition 8 (l) - Specification Appendices - Road Lighting Columns and Brackets21 Sept 2023View
NDLR-TACP-EBD-LJR-DR-LE-3001-CO2-S3.pdfCondition 8 (c) - (Section 1B) Landkey Junction Roundabout - Special Ecological Measures21 Sept 2023View
NDLR-TACP-EBD-HSJ-DR-LE-3001-C02-S3.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Special Ecological Measures (1 of 5)21 Sept 2023View
NDLR-TACP-EBD-HSJ-DR-LE-3002-C02-S3.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Special Ecological Measures (2 of 5)21 Sept 2023View
NDLR-TACP-EBD-HSJ-DR-LE-3003-C02-S3.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Special Ecological Measures (3 of 5)21 Sept 2023View
NDLR-TACP-EBD-HSJ-DR-LE-3004-C02-S3.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Special Ecological Measures (4 of 5)21 Sept 2023View
NDLR-TACP-EBD-HSJ-DR-LE-3005-C02-S3.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Special Ecological Measures (5 of 5)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3001-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Landscape Proposals (1 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3002-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Landscape Proposals (2 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3003-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (3 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3004-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (4 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3005-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (5 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3006-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Landscape Proposals (6 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3007-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (7 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3008-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (8 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3009-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (9 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3010-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Landscape Proposals (10 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3011-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Landscape Proposals (Bat box locations) (11 of 12)21 Sept 2023View
NDLR-TACP-EBD-SJF-DR-LE-3012-C02-S3.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Special Ecological Measures (12 of 12)21 Sept 2023View
NDLR-TAC-EBD-LJH-DR-LE-3001.pdfCondition 8 (c) - (Section 1C) Landkey Junction Roundabout to Harford - Dormouse Box Locations (5 of 24)22 Sept 2023View
NDLR-TAC-EBD-HSJ-DR-LE-3001.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Dormouse Box Locations (6 of 24)22 Sept 2023View
NDLR-TAC-EBD-HSJ-DR-LE-3002.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Dormouse Box Locations (7 of 24)22 Sept 2023View
NDLR-TAC-EBD-HSJ-DR-LE-3003.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Dormouse Box Locations (8 of 24)22 Sept 2023View
NDLR-TAC-EBD-HSJ-DR-LE-3004.pdfCondition 8 (c) - (Section 2) Harford to Swimbridge - Dormouse Box Locations (9 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3001.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (10 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3002.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (11 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3003.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (12 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3004.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (13 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3005.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (14 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3006.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (15 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3007.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (16 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3008.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (17 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3009.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (18 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3010.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (19 of 24)22 Sept 2023View
NDLR-TAC-EBD-SJF-DR-LE-3011.pdfCondition 8 (c) - (Section 3) Swimbridge to Filleigh - Dormouse Box Locations (20 of 24)22 Sept 2023View
NDLR -TACP-EGN-LJH-SU-LE-0001_Ver1 Sect 1C Arb Plan Locations and Protection.pdfCondition 8 (c) - (Section 1C) Landkey Junction to Harford - Arboricultural Plan Locations and Protection22 Sept 2023View
NDLR-STN-HML-LJH-SK-CH-0123_P05_Ver1 Average Speed Camera.pdfCondition 8 (m) - (Section 1C) Landkey Junction to Harford - Average Speed Camera Preferred Option22 Sept 2023View
NDLR-STN-HPV-LJH-DR-CH-0701_P02_Ver2 Pavement Construction.pdfCondition 8 (m) - (Section 1C) Landkey Junction to Harford - Pavement Construction 1 of 222 Sept 2023View
NDLR-STN-HPV-LJH-DR-CH-0702_P02_Ver2 Pavement Construction.pdfCondition 8 (m) - (Section 1C) Landkey Junction to Harford - Pavement Construction 2 of 222 Sept 2023View
NDLR-STN-HRR-LJH-DR-CH-0401_P02_Ver2 Road Restraint System.pdfCondition 8 (m) - (Section 1C) Landkey Junction to Harford - Road Restraint System22 Sept 2023View
NDLR-STN-HDG-LJH-DR-CD-0501_P01 1C Drainage Layout.pdfCondition 8 (K & N) - (Section 1C) Landkey Junction to Harford - Drainage Layout22 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0521-P01 Surface Water Channel and Pipe Bedding Details.pdfCondition 8 (K & N) & 13 - (Section 1C) Landkey Junction to Harford - Surface Water Channel and Pipe Bedding Details22 Sept 2023View
NDLR-STN-HDG-HSJ-DE-CD-0509_Ver2 (1)(1).pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Basin 1 & 2 - Construction Details27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0506_Ver3.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Basin 3 - Plan, Cross Section and Long Section27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0507_Ver3 (1).pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Pond 1 & 2 - Cross Sections and Long Section27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0508_Ver3.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Catchment 2 - Proposed Below Ground Attenuation27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0521_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Existing Drainage Network and Catchments (Sheet 1 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0522_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Existing Drainage Network and Catchments (Sheet 2 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0523_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Existing Drainage Network and Catchments (Sheet 3 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0524_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Existing Drainage Network and Catchments (Sheet 4 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0541_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Drainage Catchments (sheet 1 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0542_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Drainage Catchments (sheet 2 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0543_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Drainage Catchments (sheet 3 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SK-CD-0544_P01.pdfCondition 13 - (Section 2) Harford Underbridge to Swimbridge Cutting - Proposed Drainage Catchments (sheet 4 of 4)27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1712.pdfCondition 13 - (Section 2) Coombe Stream Culvert Additional Details27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1700.pdfCondition 13 - (Section 2) Coombe Stream Culvert Construction Sequence27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1701.pdfCondition 13 - (Section 2) Coombe Stream Culvert Existing Plan27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1703.pdfCondition 13 - (Section 2) Coombe Stream Culvert Proposed GA Sections27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1602.pdfCondition 13 - (Section 2) Harford to Swimbridge Junction Coombe Stream Culvert General Arrangement (sheet 1 of 2)27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1720.pdfCondition 13 - (Section 2) Coombe Stream Culvert Proposed Concrete L-Unit Reinforcement27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1702.pdfCondition 13 - (Section 2) Coombe Stream Culvert Proposed Plan27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1704.pdfCondition 13 - (Section 2) Coombe Stream Culvert Precast Concrete Slab Cover General Arrangement27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1707.pdfCondition 13 - (Section 2) Coombe Stream Culvert Proposed GA Section27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1705.pdfCondition 13 - (Section 2) Coombe Stream Culvert Proposed Section Details27 Sept 2023View
NDLR-TG-SMN-04835-DR-CB-1710.pdfCondition 13 - (Section 2) Coombe Stream Culvert Setting Out27 Sept 2023View
NDLR-TG-SMN-CL4-DR-CB-0501-C01_Ver3.pdfCondition 13 - (Section 2) Hurles Culvert No.4 Existing General Arrangement CH 4292.0027 Sept 2023View
NDLR-TG-SMN-CL4-DR-CB-0502-C01_Ver3.pdfCondition 13 - (Section 2) Hurles Culvert No.4 Proposed General Arrangement CH 4292.0027 Sept 2023View
NDLR-TG-SMN-CL4-DR-CB-0503-C01_Ver3.pdfCondition 13 - (Section 2) Hurles Culvert No.4 Proposed Details27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0521_Ver4.pdfCondition 13 - (Section 2) Harford to Swimbridge - Cut Off Ditch 1 Plan and Long Section (sheet 1 of 5)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0522_Ver4 (1).pdfCondition 13 - (Section 2) Harford to Swimbridge - Cut Off Ditch 2 Plan and Long Section (sheet 2 of 5)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0523_Ver4.pdfCondition 13 - (Section 2) Harford to Swimbridge - Cut Off Ditch 3 Plan and Long Section (sheet 3 of 5)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0524_Ver5.pdfCondition 13 - (Section 2) Harford to Swimbridge - Cut Off Ditch 4 (Combined Filter/Carrier Drain) Plan and Long Section (sheet 4 of 5)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0525_Ver6.pdfCondition 13 - (Section 2) Harford to Swimbridge - Cut Off Ditch 5 Plan and Long Section (sheet 5 of 5)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0501_Ver6 (1).pdfCondition 13 - (Section 2) Harford to Swimbridge - Proposed Drainage Layout (Sheet 1 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0502_C02_Ver7 (1)(1).pdfCondition 13 - (Section 2) Harford to Swimbridge - Proposed Drainage Layout (Sheet 2 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0503_Ver5 (1).pdfCondition 13 - (Section 2) Harford to Swimbridge - Proposed Drainage Layout (Sheet 3 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-DR-CD-0504_Ver6.pdfCondition 13 - (Section 2) Harford to Swimbridge - Proposed Drainage Layout (Sheet 4 of 4)27 Sept 2023View
NDLR-STN-HDG-HSJ-SH-CD-0501-C02_Ver6.pdfCondition 13 - (Section 2) Drainage Schedule for Harford to Swimbridge27 Sept 2023View
NDLR-STN-HSC-HSJ-DR-CH-0211_C01.pdfCondition 13 - (Section 2) Harford to Swimbridge - Site Clearance (Sheet 1 of 4)27 Sept 2023View
NDLR-STN-HSC-HSJ-DR-CH-0212_C01.pdfCondition 13 - (Section 2) Harford to Swimbridge - Site Clearance (Sheet 2 of 4)27 Sept 2023View
NDLR-STN-HSC-HSJ-DR-CH-0213_C01.pdfCondition 13 - (Section 2) Harford to Swimbridge - Site Clearance (Sheet 3 of 4)27 Sept 2023View
NDLR-STN-HSC-HSJ-DR-CH-0214_C01.pdfCondition 13 - (Section 2) Harford to Swimbridge - Site Clearance (Sheet 4 of 4)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0501.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Catchment Plan (Sheet 1 of 5)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0502.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Catchment Plan (Sheet 2 of 5)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0503.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Catchment Plan (Sheet 3 of 5)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0504.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Catchment Plan (Sheet 4 of 5)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0505.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Catchment Plan (Sheet 5 of 5)27 Sept 2023View
NDLR-TG-SMN-CL1-DR-CB-0501_C01.pdfCondition 13 - (Section 3) Leary Moors Culvert No.1 Existing General Arrangement CH.9900.0027 Sept 2023View
NDLR-TG-SMN-CL1-DR-CB-0502_C01.pdfCondition 13 - (Section 3) Leary Moors Culvert No.1 Proposed General Arrangement CH.9900.0027 Sept 2023View
NDLR-TG-SMN-CL1-DR-CB-0503_C01.pdfCondition 13 - (Section 3) Leary Moors Culvert No.1 Proposed Details CH.9900.0027 Sept 2023View
NDLR-TG-SMN-CL2-DR-CB-0501.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Culvert No.2 Extension Existing General Arrangement27 Sept 2023View
NDLR-TG-SMN-CL2-DR-CB-0502.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Culvert No.2 Extension Proposed General Arrangement (Sheet 1 of 2)27 Sept 2023View
NDLR-TG-SMN-CL2-DR-CB-0503.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Culvert No.2 Extension Proposed General Arrangement (Sheet 2 of 2)27 Sept 2023View
NDLR-TG-SMN-CL3-DR-CB-0501.pdfCondition 13 - (Section 3) Swimbridge to Filleigh Culvert No.3 Extension Existing General Arrangement27 Sept 2023View
NDLR-TG-SMN-CL3-DR-CB-0502.pdfCondition 13 - (Section 3) Swimbridge to Filleigh Culvert No.3 Extension Proposed General Arrangement (Sheet 1 of 2)27 Sept 2023View
NDLR-TG-SMN-CL3-DR-CB-0503.pdfCondition 13 - (Section 3) Swimbridge to Filleigh Culvert No.3 Extension Proposed General Arrangement (Sheet 2 of 2)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0552.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 2 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0553.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 3 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0554.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 4 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0555.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 5 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0556.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 6 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0557.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 7 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0558.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 8 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0559.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Cut-Off Ditch Diversions (Sheet 9 of 9)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0511.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 1 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0512.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 2 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0513.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 3 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0514(1).pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 4 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0515(1).pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 5 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0516.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 6 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0517.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 7 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0518.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 8 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0519.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 9 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-DR-CD-0520.pdfCondition 13 - (Section 3) Swimbridge to Filleigh - Proposed Drainage Layout (Sheet 10 of 10)27 Sept 2023View
NDLR-TG-HDG-SJF-SH-CD-0501_P04_Ver4.pdfCondition 13 - (Section 3) Drainage Schedule for Swimbridge Cutting to Filleigh Cutting27 Sept 2023View
NDLR-TACP-EBD-LJR-DR-LE-3001_Ver2.pdfCondition 8 (c) - (Section 1C) Landkey Junction Roundabout to Harford - Dormouse Box Locations (4 of 24)13 Dec 2023View
ApplicationFormRedacted.pdfApplication Form (redacted)27 Jun 2024View
NDLR-TACP-ELS-HSJ-DR-LE-3001A-C01.pdfBiodiversity Net Gain (BNG) Ditch Landscape Proposals Plan27 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Issue Date

    Published milestoneCouncil source

Decision & conditions

Conditional Approval
RECOMMENDATIONS REVIEW_DCC-4304-2022.pdf ARTICLE 27 LETTER (DETERMINATION OF CONDITIONS & LETTER)_DCC-4304-2022(1).pdf Decision Notice_75486.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.