Council planning record

Provision of temporary construction, demolition and excavation waste recycling facility; importation and landfilling of approximately 1.2 million cu.m of inert waste materials; and associated works including the installation of drainage infrastructure and alterations to existing vehicular accesses,

Lower Brenton Farm, Road Past Higher Brenton Farm, Kennford, EX6 7YL

Application WithdrawnReference: DCC/4268/2021Devon County Council

Last published check: 15 Sept 2026, 00:02. Check the council record for more recent changes.

Application location

Lower Brenton Farm, Road Past Higher Brenton Farm, Kennford, EX6 7YL

This record has no verified map location.

Application summary

Status
Application Withdrawn
Application type
Full Planning Consent
Received
14 Sept 2021
Validated
22 Dec 2021
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Provision of temporary construction, demolition and excavation waste recycling facility; importation and landfilling of approximately 1.2 million cu.m of inert waste materials; and associated works including the installation of drainage infrastructure and alterations to existing vehicular accesses,

Proposal details

Reference
DCC/4268/2021
Agent
Mr Philip Higginbottom

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 99 of 99

DocumentPublishedAction
Application Form_Redacted.pdfApplication Form (redacted)22 Dec 2021View
0519.LP1 rev A - Location Plan.pdfLocation Plan - 0519.LP Rev A15 Dec 2021View
0519.103 rev B - Site Plan.pdfRed Line Planning Boundary - 519.103 Rev B15 Dec 2021View
0519.104 rev B - As Existing.pdfAs Existing - 519.104 Rev B15 Dec 2021View
0519.105 rev E - Phase 1.pdfPhasing Plan (Sheet 1 of 5) Phase 1 - 519.105 Rev E15 Dec 2021View
0519.106 rev G - Phase 2.pdfPhasing Plan (Sheet 2 of 5) Phase 2 - 519.106 Rev G15 Dec 2021View
0519.107 rev G - Phase 3.pdfPhasing Plan (Sheet 3 of 5) Phase 3 - 519.107 Rev G15 Dec 2021View
0519.108 rev G - Phase 4.pdfPhasing Plan (Sheet 4 of 5) Phase 4 - 519.108 Rev G15 Dec 2021View
0519.109 rev F - Final Restoration.pdfPhasing Plan (Sheet 5 of 5) Restored - 519.109 Fev F15 Dec 2021View
0519.111 rev B - Office Recycling Area General Arrangement.pdfOffice & Recycling Area General Arrangement - 0519.111 Rev B15 Dec 2021View
0519.112 rev A - NFA Surface Water Management.pdfSurface Water Management Strategy Northern Fill Area (Phase 1 & 2) - 519.112 Rev A15 Dec 2021View
0519.113 rev A - SFA Surface Water Management.pdfSurface Water Management Strategy Southern Fill Area (Phase 3 & 4) - 519.113 Rev A15 Dec 2021View
Proposed Access General Arrangement 0519.201 Rev. C.pdfProposed Site Access General Arrangement - 0519.201 Rev C15 Dec 2021View
Phase 4 Proposed Exit General Arrangement 0519.204.pdfPhase 4 Proposed Site Exit General Arrangement - 0519.20415 Dec 2021View
Topographic Survey 1905002_01 Issue 01.pdfTopographic Survey - 1905002_01 Issue 0115 Dec 2021View
Proposed Restoration Design Contours 1905002_10 Issue 01.pdfProposed Restoration Design Contours 1905002_10 Issue 0115 Dec 2021View
Proposed Restoration Design Area 1 Sections 1905002_11.pdfProposed Restoration Design Area 1 Sections - 1905002_11 Issue 0115 Dec 2021View
Proposed Restoration Design Area 2 Sections 1905002_12.pdfProposed Restoration Design Area 2 Sections - 1905002_12 Issue 0115 Dec 2021View
Covering Letter 10.12.2021_Redacted.pdf(redacted) Covering Letter 10.12.202116 Dec 2021View
Planning Statement(1).pdfPlanning Statement December 202116 Dec 2021View
Planning Statement APPENDIX A Pre-Application Advice Request_Redacted(1).pdf(redacted) Planning Statement Appendix A - Pre Application Advice Request16 Dec 2021View
Planning Statement APPENDIX A Pre-Application Advice Request APPENDIXA Site Photos(1).pdfPlanning Statement Appendix A - Site Photos16 Dec 2021View
Planning Statement APPENDIX B Pre-Application Advice_Redacted.pdf(redacted) Planning Statement Appendix B - Pre-Application Advice16 Dec 2021View
Planning Statement APPENDIX C Lower Hare Farm(1).pdfPlanning Statement Appendix C - Lower Hare Farm Committee Report (December 2020)16 Dec 2021View
Transport Statement 0519.TS rev A_Redacted.pdf(redacted) Transport Statement Rev A23 Dec 2021View
Flood Risk Assessment 519.FRA rev A.pdfFlood Risk Assessment Rev A16 Dec 2021View
Lighting Statement_Redacted.pdf(redacted) Lighting Statement (November 2021)23 Dec 2021View
Agricultural Land Classification ans Soil Resources.pdfAgricultural Land Classification And Soil Resources16 Dec 2021View
Arboricultural Impact Assessment_Redacted.pdf(redacted) Arboricultural Impact Assessment16 Dec 2021View
AIA Tree Survey Key.pdfAIA Tree Survey Key16 Dec 2021View
Lower Brenton Farm Tree Survey Schedule.xlsxAIA Appendix 1 - Tree Survey Schedule (Excel Document)16 Dec 2021View
AIA APPENDIX II - Tree Constraints Plan_Redacted.pdfAIA Appendix II - Tree Constraints Plan16 Dec 2021View
AIA APPENDIX III - Tree Protection Plan_Redacted.pdfAIA Appendix III - Tree Protection Plan16 Dec 2021View
Non-technical Summary_V5Reduced.pdfNon Technical Summary16 Dec 2021View
Front Cover and Table of Content.pdfEnvironmental Statement (ES) Volume 1 - Front Cover And Table Of Contents16 Dec 2021View
Chapter 1 - Introduction(1).pdf(ES) Volume 1 - Chapter 1 - Introduction16 Dec 2021View
Chapter 2 - Environmental Impact Assessment Approach(1).pdf(ES) Volume 1 - Chapter 2 - Environmental Impact Assessment Approach16 Dec 2021View
Chapter 3 - Description of Development (1).pdf(ES) Volume 1 - Chapter 3 - Description of Proposed Development16 Dec 2021View
Chapter 4 - Scheme Development and Alternatives Considered (1).pdf(ES) Volume 1 - Chapter 4 - Scheme Development and Alternatives Considered16 Dec 2021View
Chapter 5 - Air Quality(1).pdf(ES) Volume 1 - Chapter 5 - Air Quality16 Dec 2021View
Chapter 6 - Noise and Vibration(1).pdf(ES) Volume 1 - Chapter 6 - Noise and Vibration16 Dec 2021View
Chapter 7 - Ecology(1).pdf(ES) Volume 1 - Chapter 7 - Ecology16 Dec 2021View
Chapter 8 - Landscape and Visual Impact(1).pdf(ES) Volume 1 - Chapter 8 - Landscape and Visual Impact16 Dec 2021View
Chapter 9 - Cultural Heritage and Archaeology(1).pdf(ES) Volume 1 - Chapter 9 - Cultural Heritage and Archaeology16 Dec 2021View
Chapter 10 - Cumulative and Interactive Effects(1).pdf(ES) Volume 1 - Chapter 10 - Cumulative and Interactive Effects16 Dec 2021View
Chapter 11 - Conclusion(1).pdf(ES) Volume 1 - Chapter 11 - Conclusion16 Dec 2021View
Appendix 1.1 - DCC Screening Opinion(1).pdf(ES) Volume 2 - Appendix 1.1 - DCC Screening Opinion16 Dec 2021View
Appendix 5.1 - Air Quality Report(1).pdf(ES) Volume 2 - Appendix 5.1 - Air Quality Report16 Dec 2021View
Appendix 6.1 - Noise Report(1).pdf(ES) Volume 2 - Appendix 6.1 - Noise Assessment16 Dec 2021View
Appendix 7.1 - LBF Wildlife Checklist(1).pdf(ES) Volume 2 - Appendix 7.1 - Devon Wildlife Checklist16 Dec 2021View
Appendix 7.2 - PEA(1).pdf(ES) Volume 2 - Appendix 7.2 - Preliminary Ecological Appraisal16 Dec 2021View
Appendix 7.3 - Fauna surveys(1)_Redacted.pdf(redacted) (ES) Volume 2 - Appendix 7.3 - Results of Fauna Surveys23 Dec 2021View
Appendix 7.4 - Biodiversity Metric 3.0 (2).pdf(ES) Volume 2 - Appendix 7.4 - Biodiversity Metric15 Sept 2021View
Appendix 8.1 - Methodology(1).pdf(ES) Volume 2 - Appendix 8.1 - Methodology16 Dec 2021View
Figure 8.1 SPP06-A Mitigation Plan(1).pdf(ES) Volume 2 - Figure 8.1 - Landscape Mitigation Plan16 Dec 2021View
Appendix 8.2 - Figures and Plans(1).pdf(ES) Volume 2 - Appendix 8.2 - Figures and Plans16 Dec 2021View
Appendix 8.3 - Viewpoint Photographs(1).pdf(ES) Volume 2 - Appendix 8.3 - Viewpoint Photographs16 Dec 2021View
Appendix 9.1 - Geophysical Survey(1)_Redacted.pdf(redacted) (ES) Volume 2 - Appendix 9.1 Geophysical Survey23 Dec 2021View
Appendix 9.2 - Archaeological Evaluation Trenching_Redacted.pdf(redacted) (ES) Volume 2 - Appendix 9.2 - Archaeological Evaluation Trenching23 Dec 2021View
Councillor Connett_Redacted.pdfResponse from Councillor Connett 05/01/20226 Jan 2022View
Comments (9)(4).pdfDCC Historic Environment Service Response 17/01/202218 Jan 2022View
DCC42682021_HERef_P01451709_L400363_redacted.pdfHistoric England Response 17/01/202218 Jan 2022View
379609 Natural England Response Letter REF AHXDCC4268.2021 Lower Brenton Farm Road Past Higher Brenton Farm Kennford EX6 7YL.pdfNatural England Response 19/01/202224 Feb 2022View
PlanningProposal.pdfEnvironment Agency Response 19/01/202220 Jan 2022View
Response_AHX-DCC-4268-2021.pdfDCC Highways Response 24/01/202225 Jan 2022View
DCC 4268 2021 Lower Brenton Farm Quarry (002)_Redacted.pdfDCC Flood Risk Response 25/01/202227 Jan 2022View
20220104_MOD_Response_redacted.pdfMinistry of Defence Response 28/01/202228 Jan 2022View
20220204 NHPR Conditions DCC-4268-2021_Redacted.pdfNational Highways Response 04/02/20227 Feb 2022View
Landscape consultation response_Lower Brenton Farm_14_02_22.pdfDCC Landscape Response 14/02/202214 Feb 2022View
Environmental Health Response.pdfTDC Environmental Health Officer Response 15/02/202216 Feb 2022View
Lower Brenton Farm DCC Ecology Detailed Comments Table February 2021.pdfDCC Ecology Response 16/02/202216 Feb 2022View
Kenn Parish Council Submission.pdfKenn Parish Council Response (1 of 3) 18/02/202218 Feb 2022View
Technical note highways Brenton farm.pdfKenn Parish Council Response (2 of 3) 18/02/2022 (Highways Technical Note)18 Feb 2022View
Lower Brenton farm Ecology report.pdfKenn Parish Council Response (3 of 3) 18/02/2022 (Ecology Report)18 Feb 2022View
Planning Consulation Response Feb 22_redacted.pdfDCC Public Rights of Way Response 18/02/202218 Feb 2022View
Landfill Site Response (2).pdfShillingford St.George Parish Council Response 21/02/202222 Feb 2022View
2. Cycleway Brenton Road to A379 junction Chudleigh Road.pdfShillingford St.George Parish Council Response (Photographs) 23/02/202223 Feb 2022View
dcc42682021_redacted.pdfDCC Public Health Response 22/02/202222 Feb 2022View
DCAF Lower Brenton Farm DCC42682021 response 24.02.22_redacted.pdfDevon Countryside Access Forum Response 24/02/202225 Feb 2022View
Lower Brenton_ (003).pdfDCC Road Safety Response 21/02/202225 Feb 2022View
Kenn Parish Council amended Submission.pdf(Amended) Kenn Parish Council Response 25/02/202228 Feb 2022View
DCC42682021 EPC Final response_redacted.pdfExminster Parish Council Response 28/02/20221 Mar 2022View
5393174_Recommendation to DCC.pdfTeignbridge District Council Response 01/03/20222 Mar 2022View
EA Response.pdfEnvironment Agency Response 01/03/20228 Mar 2022View
Microsoft Outlook - CPRE_Redacted.pdfRepresentation - Devon CPRE 13/01/2022 (redacted)18 Jan 2022View
DWT Comments 12.1.22 DCC-4268-2021 Lower Brenton Farm.pdfRepresentation - Devon Wildlife Trust 19/01/202219 Jan 2022View
Comments (26)(4).pdfRepresentation - Ide Parish Council 28/01/202228 Jan 2022View
Objection Letter Landfill.pdfRepresentation - Exeter & District Ramblers 29/01/20222 Feb 2022View
Lower Brenton Landfill Objection_2.pdfRepresentation - The Exeter Growers Co-Operative 04/02/20224 Feb 2022View
ACT's response to DCC-4268-2021.pdfRepresentation - Action on Climate in Teignbridge 05/02/20225 Feb 2022View
pdf Objections of FOSW to Lower Brenton Farm Landfill DCC 4268.pdfRepresentation - Friends of Shillingford Wood 05/02/20225 Feb 2022View
DCC-4268-2021 landfill Lower Brenton Farm Kennford_Redacted(1).pdfRepresentation - RSPB 07/02/202211 Feb 2022View
Woodland Trust_Redacted.pdfRepresentation - Woodland Trust 02/02/202210 Feb 2022View
DCC_4268_2021 Orange Elephant Dump_redacted.pdfRepresentation - Exeter Cycling Campaign 11/02/202211 Feb 2022View
Comments (127)(3).pdfRepresentation - Joe Baxter (Kenn Primary School) 16/03/202217 Mar 2022View
Stringer Lawrence - Brenton Farm (1).pdfRepresentation - The Stringer Lawrence Memorial Trust 17/03/202217 Mar 2022View
Cycling UK DCC-4268-2021 waste facility Exminster.pdfRepresentation - Cycling UK 17/03/202217 Mar 2022View
British Horse Society_Redacted.pdfRepresentation - British Horse Society 22/03/202223 Mar 2022View
LBF Withdrawal_Redacted.pdfConfirmation of Application Withdrawn 23/03/202223 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Issue Date

    Published milestoneCouncil source

Decision & conditions

Withdrawn After Validation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.