Council planning record

Creation of a new 5km stretch of shared use path (Teign Estuary Trail), from the Passage House Inn, east of Newton Abbot Racecourse, along the Teign Estuary to Teignmouth via Bishopsteignton, primarily over existing farmland. The scheme involves the creation of a minimum 3m wide pathway with sectio...

Bishopsteignton, Teignmouth, TQ14 9PS

Application ApprovedReference: DCC/4238/2021Devon County Council

Last published check: 28 Sept 2026, 16:12. Check the council record for more recent changes.

Application location

Bishopsteignton, Teignmouth, TQ14 9PS

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Full Planning Consent
Received
28 May 2021
Validated
10 Jun 2021
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Creation of a new 5km stretch of shared use path (Teign Estuary Trail), from the Passage House Inn, east of Newton Abbot Racecourse, along the Teign Estuary to Teignmouth via Bishopsteignton, primarily over existing farmland. The scheme involves the creation of a minimum 3m wide pathway with sectio...

Proposal details

Reference
DCC/4238/2021
Agent
Mrs Anjumn Kanani

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 129 of 129

DocumentPublishedAction
Teign Estuary Trail DN DCC 4238 2021 signed.pdfDecision Notice pdf3 Dec 2021View
ApplicationFormRedacted.pdfApplication Form (Redacted)28 May 2021View
B09001-P001-Location Plan.pdfLocation Plan - B09001/P001 Rev 028 May 2021View
DCC 200310.0 Teign Estuary Trail TSP sheets 1-5(1).pdfTree Survey Plan Figure 1-5 - AC2010 Rev A28 May 2021View
DCC 200310.0 Teign Estuary Trail TSP sheets 6-10.pdfTree Survey Plan Figure 6-10 - AC2010 Rev A28 May 2021View
DCC 210128.3 Teign Estuary Trail TRP.pdfTree Removal Plan Figure 1-10 - B09001-201-213 Rev A28 May 2021View
B09001-P002-Hackney Lane To Ware Barton Scheme Overview (SHEET 1-4).pdfHackney Lane to Ware Barton Scheme Overview (1 of 4)- B09001/P002 Rev 028 May 2021View
B09001-P005-Rydon Gardens to A381 Scheme Overview (SHEET 4-4).pdfRydon Gardens to A381 Scheme Overview (4 of 4)- B09001/P005 Rev 028 May 2021View
B09001-P007-A-Environmental Cross Sections.pdfEnvironmental Cross Sections - B09001/P007 Rev A11 Jun 2021View
B09001-P009-A-Structure Elevations.pdfStructure Elevations - B09001-P009 Rev A11 Jun 2021View
B09001-P010-Statutory Undertakers Plan.pdfStatutory Undertakers Plan - B09001/P01028 May 2021View
B09001-P011- Flood Risk Assement and Drainage Strategy Plan (Sheet 1-4).pdfFlood Risk Assessment and Drainage Strategy Plan (1 of 4)- B09001/P11 Rev 028 May 2021View
B09001-P012- Flood Risk Assement and Drainage Strategy Plan (Sheet 2-4).pdfFlood Risk Assessment and Drainage Strategy Plan (2 of 4) - B09001/P12 Rev 028 May 2021View
B09001-P013- Flood Risk Assement and Drainage Strategy Plan (Sheet 3-4).pdfFlood Risk Assessment and Drainage Strategy Plan (3 of 4)- B09001/P13 Rev 028 May 2021View
B09001-P014- Flood Risk Assement and Drainage Strategy Plan (Sheet 4-4).pdfFlood Risk Assessment and Drainage Strategy Plan (4 of 4)- B09001/P14 Rev 028 May 2021View
3213_L_MP_1_09-12 ENVIRONMENTAL BASELINE PLANS-Section 1.pdfEnvironmental Baseline Plan Section 1- 3213_L_MP_1_09 Rev B28 May 2021View
3213_L_MP_1_09-12 ENVIRONMENTAL BASELINE PLANS-Section 2.pdfEnvironmental Baseline Plan Section 2 - 3213_L_MP_1_10 Rev B28 May 2021View
3213_L_MP_1_09-12 ENVIRONMENTAL BASELINE PLANS-Section 3.pdfEnvironmental Baseline Plan Section 3 - 3213_L_MP_1_11 Rev B28 May 2021View
3213_L_MP_1_09-12 ENVIRONMENTAL BASELINE PLANS-Section 4.pdfEnvironmental Baseline Plan Section 4 - 3213_L_MP_1_12 Rev B28 May 2021View
3213_L_MP_1_13-16 ENVIRONMENTAL MITIGATION PLANS-Section 1.pdfMitigation Plan Section 1 - 3213_L_MP_1_13 Rev A28 May 2021View
3213_L_MP_1_13-16 ENVIRONMENTAL MITIGATION PLANS-Section 3.pdfMitigation Plan Section 3 - 3213_L_MP_1_15 Rev A28 May 2021View
Section 4.pdfMitigation Plan Section 4 - 3213_L_MP_1_16 Rev A28 May 2021View
B09001-P015- Proposed View Points.pdfProposed View Points - B09001/P01529 Jun 2021View
3213_Teign Estuary_LVIA_Appendix E Viewpoints photographs and visual assessment table.pdf(Revised) LVIA Appendix E: Viewpoint Photographs and Visual Assessment Tables12 Nov 2021View
3213_Teign Estuary_LVIA_FV3_compressed.pdf(Revised) Landscape and Visual Impact Assessment12 Nov 2021View
B09001-P004-Rev A-Wear Pond to Rydon Gardens Scheme Overview (SHEET 3-4).pdfWear Pond to Rydon Gardens & Path to A381 Bishopsteignton Scheme Overview (3 of 4)- B09001/P004 Rev A23 Sept 2021View
B09001-P006-C-Trail Cross Sections.pdfTrail Cross Sections - B09001/P006 Rev C11 Nov 2021View
3213_L_MP_1_13-16 ENVIRONMENTAL MITIGATION PLANS-Section 2 Rev B.pdfMitigation Plan Section 2 - 3212_L_MP_1_1412 Nov 2021View
B09001-P003-Rev A-Ware Barton to Wear Pond Scheme Overview (SHEET 2-4).pdfWare Barton to Wear Pond Scheme Overview (Sheet 2 of 4) - B09001-P00312 Nov 2021View
B09001-P008-C-Structure Cross Sections.pdfStructure Cross Sections - B09001/P00812 Nov 2021View
Planning Statement.pdfPlanning Statement28 May 2021View
Design and Access Statement.pdfDesign and Access Statement28 May 2021View
Open space and Public Rights of Way Statement.pdfOpen Space and Public Rights of Way Statement28 May 2021View
Contaminated Land Assessment.pdfContaminated Land Assessment28 May 2021View
EX0117 Teign Estuary Trail DBA (Final) smaller size_redacted.pdfHeritage Assessment (redacted)1 Jun 2021View
TET FRA and Drainage Strategy.pdfFlood Risk Assessment28 May 2021View
DCC-200316.0 - Arboricultural Report for Teign Estuary Trail_redacted.pdf(Redacted) Arboricultural Report1 Jun 2021View
DCC-210210.0 Teign Estuary Trail AIA_redacted.pdf(Redacted) Arboricultural Impact Assessment1 Jun 2021View
3213_Teign Estuary_LVIA_Appendices A - C.pdfLVIA Appendix A- Methodology28 May 2021View
3213_Teign Estuary_LVIA_Appendix E Landscape assessment table.pdfLVIA Appendix D- Landscape Assessment Tables28 May 2021View
Sustainable Design Statement.pdfSustainable Design Statement28 May 2021View
CR0711 Teign Estury Trail Programme of Arch Works WSI_redacted.pdf(Redacted) Written Scheme of Investigation for a Programme of Archaeological Works1 Jun 2021View
CA_CR0711_Survey_master_WSI_showing_service.pdfArchaeological Mitigation Works Passage Inn to Bishopsteignton28 May 2021View
3213_Teign Estuary_Interpretation_Strategy_FV2.pdfIntepretation and Street Furniture Strategy28 May 2021View
3213_Teign Estuary_Visualisations.pdfVisualisations28 May 2021View
CYU-DCC-XX-XX-DA-EN-0001-S3-P01-Wildlife_geology_trigger_list.pdfWildlife and Geology Trigger Table1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0002-S3-P03-EcIA_redacted.pdf(Redacted) Ecological Impact Assessment1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0003-S3-P01-EcIA_Appendix_1.pdfEcological Impact Assessment Appendix 1 - Legislation, Planning Policy and Biodiversity Policy1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0004-S3-P01-EcIA_Appendix_2.pdfEcological Impact Assessment Appendix 2 - Site Photos1 Jun 2021View
CYU-JBAU-XX-XX-TN-EN-0002-S3-P01-NVC_survey_report (Appendix 3).pdfEcological Impact Assessment Appendix 3 - National Vegetation Classification Survey1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0005-S3-P01-EcIA_Appendix_4.pdfEcological Impact Assessment Appendix 4 - Bat Transect Survey Weather Data1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0006-S3-P01-EcIA_Appendix_5.pdfEcological Impact Assessment Appendix 5 - Bat Static Detector Data Summary1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0007-S3-P01-EcIA_Appendix_6.pdfEcological Impact Assessment Appendix 6 - Cirl Bunting Survey Results1 Jun 2021View
CYU-JBAU-XX-XX-AS-EN-0002-S3-P01-HRA (Appendix 7)(1).pdfEcological Impact Assessment Appendix 7 - Habitats Regulations Assessment Screening1 Jun 2021View
CYU-JBAU-XX-XX-RP-EN-0001-S0-P10-Interim_ecology_report (Appendix 8).pdfEcological Impact Assessment Appendix 8 - Interim Ecology Report1 Jun 2021View
CYU-JBAU-XX-XX-DA-EN-0002-S3-P01-Defra_biodiversity_metric (Appendix 9).xlsxEcological Impact Assessment Appendix 9 - Defra Biodiversity Metric 2.01 Jun 2021View
2021 05 24 Teign Estuary Trail Off-road RSA 1 FINAL v1 EDG response_redacted.pdf(Redacted) Stage 1 Road Safety Audit1 Jun 2021View
TET- Off Site Compensation - Letter of Intent- May 2021_redacted.pdf(Redacted) Off Site Compensation - Letter of Intent1 Jun 2021View
Community Consultation Statement.pdfCommunity Consultation Statement1 Jun 2021View
Appendix 1 - Summary of Community Support.pdfCommunity Consultation Statement Appendix 1 - Summary of Community Involvement and Support1 Jun 2021View
Appendix 2 - Public Consultation Report.pdfCommunity Consultation Statement Appendix 2 - Public Consultation Report1 Jun 2021View
Geo-technical Data (Land Stability Report).pdfGeotechnical Data/ Land Stability Report1 Jun 2021View
Utilities Check and Site Survey.pdfUtility Check and Site Survey1 Jun 2021View
Waste Audit Statement(1).pdfWaste Audit Statement1 Jun 2021View
Construction Traffic Statement final.pdfConstruction Traffic Statement29 Jun 2021View
2021 08 04 Response to EA.pdfResponse to Environment Agency Objection relating to Flood Risk13 Sept 2021View
Habitats created section 4.jpgHabitats Created Section 417 Sept 2021View
Habitats created section 5.jpgHabitats Created Section 517 Sept 2021View
Teign Estuary Trail ECiA Final Report 030921_redacted.pdfEcological Impact Assessment (Redacted)17 Sept 2021View
3213_Teign Estuary_Visualisations 210928 (compressed).pdfAdditional Visualisations30 Sept 2021View
211026 TET Planning -Drainage attenuation.pdfPreliminary Attenuation Volumes for Hackney Lane and Flow Lane28 Oct 2021View
211021 FSR Flow Lane 2ls.pdfSurface Water Storage Requirements - FSR Flow Lane 2ls28 Oct 2021View
211025 FEH Flow Lane with LTS 2ls.pdfSurface Water Storage Requirements - FEH Flow Lane with LTS 2ls28 Oct 2021View
211025 FSR Hackney Lane 2ls.pdfSurface Water Storage Requirements - FSR Hackney Lane 2ls28 Oct 2021View
211025 FEH Hackney Lane with LTS 2ls.pdfSurface Water Storage Requirements - FEH Hackney Lane with LTS 2ls28 Oct 2021View
Teign Estuary Trail Draft Letter of Intent 15 11 2021 db signed_Redacted.pdfLetter of Intent dated 21 November 2021 (Redacted)22 Nov 2021View
Habitats created section 1_v2.pdfHabitats Created Section 1 V22 Nov 2021View
Habitats created section 2_v2.pdfHabitats Created Section 2 V22 Nov 2021View
Habitats created section 3_v2.pdfHabitats Created Section 3 V22 Nov 2021View
Habitats lost section 1_v2.pdfHabitats Lost Section 1 V22 Nov 2021View
Habitats lost section 2_v2.pdfHabitats Lost Section 2 V22 Nov 2021View
Habitats lost section 3_v2.pdfHabitats Lost Section 3 V22 Nov 2021View
Habitats lost section 4_v2.pdfHabitats Lost Section 4 V22 Nov 2021View
Habitats lost section 5_v2.pdfHabitats Lost Section 5 V22 Nov 2021View
Habitats lost section 6_v2.pdfHabitats Lost Section 6 V22 Nov 2021View
Discrepancy note.pdfBiodiversity Net Gain Discrepancy Note2 Nov 2021View
3213_Teign Estuary_LVIA_FV2 - Part 1.pdf(Superseded) Landscape and Visual Impact Assessment Part 128 May 2021View
3213_Teign Estuary_LVIA_FV2 - Part 2.pdf(Superseded) Landscape and Visual Impact Assessment Part 228 May 2021View
3213_Teign Estuary_LVIA_FV2 - Part 3.pdf(Superseded) Landscape and Visual Impact Assessment Part 328 May 2021View
3213_Teign Estuary_LVIA_Appendix D Viewpoints photographs and visual assessment table.pdfLVIA Appendix E- Viewpoint Photographs and Visual Assessment Table28 May 2021View
Habitats created section 1.jpgHabitats Created Section 117 Sept 2021View
Habitats created section 2.jpgHabitats Created Section 217 Sept 2021View
Habitats created section 3.jpgHabitats Created Section 317 Sept 2021View
Habitats lost section 1.jpgHabitats Lost Section 117 Sept 2021View
Habitats lost section 2.jpgHabitats Lost Section 217 Sept 2021View
Habitats lost section 3.jpgHabitats Lost Section 317 Sept 2021View
Habitats lost section 4.jpgHabitats Lost Section 417 Sept 2021View
Habitats lost section 5.jpgHabitats Lost Section 517 Sept 2021View
B09001-P003-Ware Barton to Wear Pond Scheme Overview (SHEET 2-4).pdfWare Barton to Wear Pond Scheme Overview (2 of 4) - B09001/P003 Rev 028 May 2021View
B09001-P004-Wear Pond to Rydon Gardens Scheme Overview (SHEET 3-4).pdfWear Pond to Rydon Gardens & Path to A381 Bishopsteignton Scheme Overview (3 of 4)- B09001/P004 Rev 028 May 2021View
B09001-P006-A-Trail Cross Sections.pdfTrail Cross Sections - B09001/P006 Rev A11 Jun 2021View
B09001-P008-A-Structure Cross Sections.pdfStructure Cross Sections - B09001-P008 Rev A11 Jun 2021View
3213_L_MP_1_13-16 ENVIRONMENTAL MITIGATION PLANS-Section 2.pdfMitigation Plan Section 2- 3213_L_MP_1_14 Rev A28 May 2021View
B09001-P006-B-Trail Cross Sections.pdfTrail Cross Sections - B09001/P006 Rev B28 Oct 2021View
B09001-P008-B-Structure Cross Sections.pdfStructure Cross Sections - B09001/P008 Rev B28 Oct 2021View
Comments (1)(2).pdfDCC Road Safety Response 16/06/202116 Jun 2021View
Highways England_Redacted.pdfHighways England Response 16/06/2116 Jun 2021View
Comments (1)(6).pdfPublic Health Response 18/06/202118 Jun 2021View
Comments(6).pdfKingsteignton Town Council Response 22/06/202122 Jun 2021View
HSL-210624152902-467-FinalOutcome(1).pdfHealth & Safety Executive Response 24/06/202125 Jun 2021View
Response.pdfNatural England Response 25/06/202125 Jun 2021View
Comments(10).pdfDCC Highways Response 30/06/202130 Jun 2021View
Microsoft Outlook - Memo Style_redacted.pdfNetwork Rail Response 01/07/20211 Jul 2021View
36649a.pdfDCC Historic Environment Response 02/07/20212 Jul 2021View
Comments(12).pdfBishopsteignton Parish Council Response 02/07/20212 Jul 2021View
Remote Desktop Redirected Printer Doc_redacted.pdfDevon Countryside Access Forum 07/07/20217 Jul 2021View
PlanningProposal.pdfEnvironment Agency Response 07/07/20218 Jul 2021View
Network Rail_Redacted.pdfNetwork Rail Response 14/07/202115 Jul 2021View
Comments(18).pdfThe Devon Stone Federation Response 17/07/202119 Jul 2021View
Comments(20).pdfTeignmouth Town Council 20/07/202120 Jul 2021View
NATIONAL_GRID_XX_GW3C_3NWP_029844_1_9136 (003)_Redacted.pdfNational Grid Response 15/06/202128 Jul 2021View
DCC_4238_2021 DCC Ecology Detailed Comments Table July 2021.pdfDCC Ecology Response 02/08/20213 Aug 2021View
PlanningProposal(1).pdfEnvironment Agency Response 27/08/202127 Aug 2021View
National Grid_Redacted.pdfNational Grid Response 18/10/202125 Oct 2021View
Network Rail_Redacted(1).pdfNetwork Rail Response 25/10/202125 Oct 2021View
DCC_4238_2021 DCC Ecology Detailed Comments Table October 2021.pdfDCC Ecology Response 21/10/202128 Oct 2021View
FRM.DCC.4238.2021 Response.pdfDCC Flood Risk Response 29/10/20212 Nov 2021View
Teign Estuary Trail Economy response.pdfDCC Economy Response 29/10/20213 Nov 2021View
Microsoft Outlook - Memo Style_redacted(2).pdfTeignbridge District Council Response 01/12/20213 Dec 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Issue Date

    Published milestoneCouncil source

Decision & conditions

Conditional Approval
Teign Estuary Trail DN DCC 4238 2021 signed.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.