Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land adjacent to the layby on the east bound carriageway of the A379 east of Chudleigh Road, EX2 9SQ
Last published check: 21 Sept 2026, 01:12. Check the council record for more recent changes.
Land adjacent to the layby on the east bound carriageway of the A379 east of Chudleigh Road, EX2 9SQ
This record has no verified map location.
Construction of a footbridge/ cyclebridge over the A379
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| RECOMMENDATIONS REVIEW_DCC-4208-2020(1).pdf(SIGNED) Decision Notice pdf | 19 Mar 2021 | View |
| ARTICLE 27 LETTER (DETERMINATION OF CONDITIONS & LETTER)_DCC-4208-2020.pdfArticle 27 (Decision & Letter) - Condition 6 (PDF) | 12 Jul 2021 | View |
| ARTICLE 27 LETTER (DETERMINATION OF CONDITIONS & LETTER)_DCC-4208-2020(1).pdfArticle 27 (Decision & Letter) - Condition 7 (PDF) | 15 Jul 2022 | View |
| ARTICLE 27 LETTER (DETERMINATION OF CONDITIONS & LETTER)_DCC-4208-2020(1)(1).pdfArticle 27 (Decision & Letter) Conditions 3, 4 & 5 (pdf) | 19 Dec 2022 | View |
| OFFICERS DELEGATED REPORT_DCC-4208-2020(1).pdf(SIGNED) Officers Delegated Report pdf | 19 Mar 2021 | View |
| OFFICERS DELEGATED REPORT DISCHARGE OF CONDITIONS_DCC-4208-2020.pdfArticle 27 (Officer's Report) (PDF) | 12 Jul 2021 | View |
| OFFICERS DELEGATED REPORT NON MATERIAL AMENDMENT_DCC-4208-2020.pdfNMA Officers Delegated Report pdf | 5 Oct 2021 | View |
| OFFICER'S DELEGATED REPORT DISCHARGE OF CONDITIONS_DCC-4208-2020.pdfArticle 27 (Officers Report) pdf | 15 Jul 2022 | View |
| OFFICER'S DELEGATED REPORT DISCHARGE OF CONDITIONS_DCC-4208-2020(1).pdfArticle 27 (Officer's Report) (pdf) | 19 Dec 2022 | View |
| ApplicationFormRedacted.pdfApplication Form - Without Personal Data | 27 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-002-P0 - Scheme and Development plan and access points.pdfScheme and Development Pland and Access Points - DCCP15579-EDG-SBR-05296-DR-C-002 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-003-P0 - North Ramp Sections.pdfParabolic Tied Arch North Ramp Sections - DCCP15579-EDG-SBR-05296-DR-C-003 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-004-P0 - South Ramp Sections.pdfParabolic Tied Arch South Ramp Sections - DCCP15579-EDG-SBR-05296-DR-C-004 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-005-P0 - Bridge Drainage Plan.pdfNorthside Drainage Plan - DCCP15579-EDG-SBR-05296-DR-C-005 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-006-P0 - Drainage Catchment Plan(1).pdfDrainage Catchment Plan - DCCP15579-EDG-SBR-05296-DR-C-006 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-009-P0 - Location Plan(1).pdfLocation Plan - DCCP15579-EDG-SBR-05296-DR-C-009 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-010-P0 - Services Plan.pdfServices Plan - DCCP15579-EDG-SBR-05296-DR-C-010 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-011-P2 - Red line boundary Plan.pdfRed Line Boundary Plan - DCCP15579-EDG-SBR-05296-DR-C-011 Rev P2 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-012-P0 - Licence and compound area plan.pdfLicence Area Plan and Proposed Compound Locations - DCCP15579-EDG-SBR-05296-DR-C-012 Rev P0 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-013-P0 - Public Rights of Way Plan.pdfPublic Rights Of Way Plan - DCCP15579-EDG-SBR-05296-DR-C-013 Rev P0 | 26 Nov 2020 | View |
| Figure_1_Site_Location_Plan.pdfFigure 1: Site Location - 7007287_XX_XX_LVA_LA_0001 | 26 Nov 2020 | View |
| Figure_2_Landscape_Character.pdfFigure 2: Landscape Character - 7007287_XX_XX_LVA_LA_0002 | 26 Nov 2020 | View |
| Figure_3_Planning_Designations.pdfFigure 3: Designations - 7007287_XX_XX_LVA_LA_0003 | 26 Nov 2020 | View |
| Figure_4_Topography.pdfFigure 4: Topography - 7007287_XX_XX_LVA_LA_0004 | 26 Nov 2020 | View |
| Figure_6_Neighbouring_Consented_Development.pdfFigure 6: Neighbouring Consented Development - 7007287_XX_XX_LVA_LA_0006 | 26 Nov 2020 | View |
| Figure_5_Viewpoint Location and ZTV.pdfFigure 5: Viewpoint Locations and Zone of Theoretical Visibility - 7007287_XX_XX_LVA_LA_0005 | 26 Nov 2020 | View |
| OP000159966-LD14460_01B - HANDRAIL LAYOUT.pdfHandrail Layout Lighting Calculations - OP000159966-LD14460_01B | 26 Nov 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Layout.pdfExeter Cycle Bridge Layout and Lighting Scheme - OP159966LD14753 | 26 Nov 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-015 Bridge and Chudleigh Road Diversion Plan.pdfPedestrian Bridge and Chudleigh Road Diversion Plan - DCCP15579-EDG-SBR-05296-DR-C-015 Rev P0 | 8 Dec 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-001_P2 Bridge GA-Indicative GA.pdfParabolic Tied Arch General Arrangement - DCCP15579-EDG-SBR-05296-DR-C-001 Rev P2 | 11 Mar 2021 | View |
| 70072873_WSP_XX_XX_DR_LA_0002 - SOFT LANDSCAPE AND ECOLOGY P08.pdfLandscape General Arrangement Soft Landscape and Ecology - 70072873_WSP_XX_XX_DR_LA_0002 Rev P08 | 9 Jul 2021 | View |
| 70072873_WSP_XX_XX_DR_LA_0001 P06.pdfLandscape General Arrangement Hard Landscape - 70072873_WSP_XX_XX_DR_LA_0001 Rev P06 | 12 Jul 2021 | View |
| Planning Statement(1).pdfPlanning Statement | 27 Nov 2020 | View |
| Ecology Report_Redacted.pdf(Redacted) Ecological Impact Assessment | 7 Dec 2020 | View |
| Arboricultural Report_Redacted.pdf(Redacted) Arboricultural Impact Assessment and Tree Protection Statement | 7 Dec 2020 | View |
| Design and Access Statement.pdfDesign and Access Statement | 27 Nov 2020 | View |
| Sustainable Design Statement.pdfSustainable Design Statement | 27 Nov 2020 | View |
| Geotechnical Statement.pdfGeotechnical Statement | 27 Nov 2020 | View |
| Drainage Strategy and Flood Risk Statement.pdfDrainage Strategy and Flood Risk Statement | 27 Nov 2020 | View |
| Open Space and Public Rights of Way Statement.pdfOpen Space and Public Rights of Way Statement | 27 Nov 2020 | View |
| Construction Management Scheme.pdfConstruction Management Scheme | 27 Nov 2020 | View |
| Waste Audit Statement.pdfWaste Audit Statement | 27 Nov 2020 | View |
| 70072873-WSP-LA-RO1 - LVA_redacted(1).pdf(Redacted) Landscape and Visual Appraisal | 1 Dec 2020 | View |
| 70072873-WSP-SPEC - OUTLINE SPECIFICATION_redacted.pdf(Redacted) Specification for Landscape Works | 1 Dec 2020 | View |
| Lighting Statement.pdfLighting Statement | 27 Nov 2020 | View |
| Contaminated Land Assessment Findings_Redacted.pdf(Redacted) Land Contamination Assessment Findings | 3 Dec 2020 | View |
| Technical Note_Redacted.pdf(Redacted) Land Contamination Assessment Technical Note | 3 Dec 2020 | View |
| Schreder SCULPdot - Product Sheet.pdfSchreder SCULPdot Product Specification Sheet | 27 Nov 2020 | View |
| Outdoor Lighting Louvred Option_Redacted.pdf(Redacted) Outdoor Lighting Report - Lighting Calculation Louvred Option | 7 Dec 2020 | View |
| Lantern Layout Louvred Option_Redacted.pdf(Redacted) Outdoor Lighting Report - Lantern Layout Louvred Option | 7 Dec 2020 | View |
| Schreder Axia 3 - Product Sheet.pdfSchreder Axia 3 Product Specification Sheet | 27 Nov 2020 | View |
| Schreder Alinea Handrail - Product Sheet.pdfSchreder Alinea Handrail Product Specification Sheet | 27 Nov 2020 | View |
| TensarTech_TW3_March_2012_Redacted.pdf(Redacted) Earth Retaining System for Walls by Tensar Tech | 7 Dec 2020 | View |
| 2020-07-15 - Designing out Crime Police Officer_Redacted(1).pdf(Redacted) Designing Out Crime Officer Consultation Correspondence | 5 Dec 2020 | View |
| 2020-08-05 - Historic Environment_Redacted(1).pdf(Redacted) Historic Environment Consultation Correspondence | 5 Dec 2020 | View |
| 2020-09-11 - Devon County Council Planning Officer_Redacted(1).pdf(Redacted) DCC Planning Officer Consultation Correspondence | 5 Dec 2020 | View |
| 2020-09-14 - Airport Safeguarding consultation 1 of 2_Redacted(1).pdf(Redacted) Exeter Airport Safeguarding Consultation Correspondence 1 of 2 | 5 Dec 2020 | View |
| 2020-09-14 - Airport Safeguarding consultation 2 of 2_Redacted(1).pdf(Redacted) Exeter Airport Safeguarding Consultation Corresondence 2 of 2 | 5 Dec 2020 | View |
| 2020-09-21 - Councillor Atkinson_Redacted(1).pdf(Redacted) Councillor Atkinson Consultation Correspondence | 5 Dec 2020 | View |
| 2020-09-23 - Councillor Connett_Redacted(1).pdf(Redacted) Councillor Connett Consultation Correspondence | 5 Dec 2020 | View |
| 2020-10-06 - Alphington Village Forum_Redacted(1).pdf(Redacted) Alphington Village Forum Consultation Correspondence | 5 Dec 2020 | View |
| 2020-10-06 - Exminster Parish Council_Redacted(1).pdf(Redacted) Exminster Parish Council Consultation Correspondence | 5 Dec 2020 | View |
| 2020-11-17 - Column Cycleway lighting design_Redacted(1).pdf(Redacted) EAD Ecology Consultation Correspondence | 5 Dec 2020 | View |
| 2020-11-17 - Neighbourhood Highway Officer - Drainage to Chudleigh Road_Redacted(1).pdf(Redacted) Neighbourhood Highway Officer Consultation Correspondence | 5 Dec 2020 | View |
| 2020-11-17 - Vistry PROW diversion_Redacted(1).pdf(Redacted) PROW Consultation Correspondence | 5 Dec 2020 | View |
| A379 SW Exeter - Revised Parapet statement.pdfParapet Re-design Statement | 11 Mar 2021 | View |
| P1105_Exter_Cycle_Bridge_ Biodiversity Metric 2.0 Calculation Tool_Final_210316.xlsmBiodiversity Metric 2.0 Calculator | 18 Mar 2021 | View |
| A379 SW Exeter HIF Footbridge_PSSR-GIR_Rev0.01 FINAL_unsigned_Redacted.pdf(Redacted) Ground Investigation Report | 8 Jan 2021 | View |
| PE201660 A379 SW Exeter HIF Footbridge Factual Report DRAFT-redacted (1).pdf(Redacted) Ground Investigation Report | 8 Dec 2020 | View |
| DCCP15579-EDG-SBR-05296-DR-C-001-P1 - General Arrangement.pdfParabolic Tied Arch General Arrangement - DCCP15579-EDG-SBR-05296-DR-C-001 Rev P1 | 26 Nov 2020 | View |
| 70072873_WSP_XX_XX_DR_LA_0001 - HARD LANDSCAPE.pdfLandscape General Arrangement Hard Landscape - 70072873_WSP_XX_XX_DR_LA_0001 Rev P04 | 26 Nov 2020 | View |
| 70072873_WSP_XX_XX_DR_LA_0002 - SOFT LANDSCAPE AND ECOLOGY.pdfLandscape General Arrangement Soft Landscape and Ecology - 70072873_WSP_XX_XX_DR_LA_0002 Rev P04 | 26 Nov 2020 | View |
| 70072873_WSP_XX_XX_DR_LA_0002 - SOFT LANDSCAPE AND ECOLOGY.pdfLandscape General Arrangement Soft Landscape and Ecology- 70072873_WSP_XX_XX_DR_LA_00022 | 16 Mar 2021 | View |
| 70072873_WSP_XX_XX_DR_LA_0001 - HARD LANDSCAPE.pdfLandscape General Arrangement Hard Landscape - 70072873_WSP_XX_XX_DR_LA_0001 Rev P05 | 16 Mar 2021 | View |
| NON-MATERIAL AMENDMENT LETTER (SPLIT DECISION)_DCC-4208-2020.pdfNMA Split Covering Letter pdf | 5 Oct 2021 | View |
| Comments.pdfDCC Road Safety Response 08/12/2020 | 9 Dec 2020 | View |
| Environmental Health_Redacted.pdfTDC Environmental Health Response 08/12/2020 | 9 Dec 2020 | View |
| 20201211 HEPR No Objections DCC-4208-2020_redacted.pdfHighways England Response 11/12/2020 | 11 Dec 2020 | View |
| Response foot cycle bridge A379 DCC 4208 2020.pdfDCC Public Health Response 14/12/2020 | 15 Dec 2020 | View |
| 5137747_Recommendation to Consultee_Redacted.pdfTeignbridge District Council Response 15/12/2020 | 16 Dec 2020 | View |
| Comments(1).pdfExeter and Devon Airport Ltd Response 16/12/2020 | 17 Dec 2020 | View |
| CAP1096 Crane user guidance Edition 2.pdfExeter and Devon Airport Ltd Response - Crane Guidance (Attachment 1 of 2) 16/12/2020 | 16 Dec 2020 | View |
| Advice-Note-4-Cranes-2016.pdfExeter and Devon Aitport Ltd Resposne - Cranes and Other Construction Issues (Attachment 2 of 2) 16/12/2020 | 16 Dec 2020 | View |
| BGXDCC42082020_HERef_P01328350_L377119_Redacted.pdfHistoric England Response 18/12/2020 | 22 Dec 2020 | View |
| DCC_4208_2020 Designing out Crime Response.pdfDevon and Cornwall Police Response 22/12/2020 | 22 Dec 2020 | View |
| Comments (1).pdfDCC Historic Environment Service Response 05/01/2021 | 6 Jan 2021 | View |
| 05 Jan 21 DCC Detailed Comments Table DCC_4208_2020.pdfDCC Ecology Response 05/01/2021 | 6 Jan 2021 | View |
| 13 Jan 21 DCC Detailed Comments Table DCC_4208_2020 (003).pdfUpdated DCC Ecology Response 13/01/2021 | 14 Jan 2021 | View |
| Comments (1)(1).pdfExminster Parish Council Response 06/01/2021 | 6 Jan 2021 | View |
| Comments (1)(2).pdfDCC Highways Response 28/01/2021 | 1 Feb 2021 | View |
| EA_Response_Redacted.pdfEnvironment Agency Response 01/02/2021 | 2 Mar 2021 | View |
| DCAF response A379 bridge_Redacted.pdfDevon Countryside Access Forum Response 30/08/2022 | 30 Aug 2022 | View |
| Cycle route A379 Peamore to Matford Letter_1.pdfApplicant's Response (18/12/2020) to Keith Lewis, Exeter Civic Society Comments of 10/12/2020 | 21 Jan 2021 | View |
| Cycle route A379 Peamore to Matford Letter_2.pdfApplicant's Response (18/12/2020) to Keith Lewis, Exeter Civic Society Comments of 10/12/2020 | 21 Jan 2021 | View |
| Cycle route A379 Peamore to Matford Letter_3.pdfApplicant's Response (08/01/2021) to Keith Lewis, Exeter Civic Society Comments of 18/12/2020 | 21 Jan 2021 | View |
| 2021-01-21 - Response to Exeter Cycling Campaign.pdfApplicant's Response to Edward Donohue, Exeter Cycling Campaign Dated 14/12/2020 | 22 Jan 2021 | View |
| 2021-01-21 - Response to Designing Out Crime Officer concerns.pdfApplicant's Response to Devon and Cornwall Police Comments of 22/12/2020 | 21 Jan 2021 | View |
| P1105_Exeter_Cyclebridge_DCC_Responce_210119.pdfApplicant's Response to DCC Ecology Comments of 05/01/2021 | 19 Jan 2021 | View |
| 2021-01-27 - Response to Exminster Parish Council.pdfApplicant's Response (27/01/2021) to Exminster Parish Council's Comments Dated 06/01/2021 | 28 Jan 2021 | View |
| 70072873-WSP-LA-R02_Redacted.pdfCondition 6 - Landscape and Ecological Management Plan | 24 May 2021 | View |
| Badger_Survey_Results.pdfCondition 7 - September 2021 - Badger Survey Results | 1 Oct 2021 | View |
| 220630_P1105_C6_A379_Exeter_Cycle_Bridge_EAD Ecology(1).pdfCondition 7 - June 2022 Badger Survey Update | 1 Jul 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0005.pdfCondition Discharge 3 - Location Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0006.pdfCondition Discharge 3 - Landscape Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0010.pdfCondition Discharge 3 - General Arrangement Sheet 1 Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0011.pdfCondition Discharge 3 - General Arrangement Sheet 2 Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0040.pdfCondition Discharge 3 - Abutment Details Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0045.pdfCondition Discharge 3 - Approach Platforms & Sculptures Plans & Drawings Plans | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-T-0050_Temporary Tree Protection_S4 (Issued for stage approval)_P01.pdfCondition Discharge 3 - Temporary Tree Protection Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-RP-Y-5000_Lighting Report for Planning Condition Discharge_S4 (Issued for stage approval)_P02_redacted.pdfCondition Discharge 3 - Lightning Report (Redacted) | 25 Nov 2022 | View |
| Dimming Schedule IH21-BHE-ZZ-XX-SP-Y-8000_Lighting Controls Performance Specification_S4 (Issued for stage approval)_P02 (1).pdfCondition Discharge 3 - Dimming Schedule/ Lighting Controls Performance Specification S4 | 13 Dec 2022 | View |
| 221102 Drainage calculation output.pdfCondition Discharge 4 - Drainage Calculation Output | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-2100_RAMP SOUTHWEST APPROACH - GENERAL ARRANGEMENT_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Ramp Southwest Approach General Arrangement | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-2101_RAMP NORTHWEST APPROACH - GENERAL ARRANGEMENT_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Ramp Northwest Approach General Arrangement | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3100_RAMP SOUTHWEST APPROACH - STORMWATER DRAINAGE GENERAL ARRANGEMENT_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Ramp Southwest Approach Stormwater Drainage General Arrangement | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3101_RAMP NORTHWEST APPROACH - STORMWATER DRAINAGE GENERAL ARRANGEMENT_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Ramp Southwest Approach Stormwater Drainage General Arrangement | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3401_DRAINAGE - DETAILS SHEET 1_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Drainage Details Sheet 1 | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3402_DRAINAGE - DETAILS SHEET 2_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Drainage Details Sheet 2 | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3403_DRAINAGE - DETAILS SHEET 3_S4 (Issued for stage approval)_P01.pdfCondition Discharge 4 - Drainage Details Sheet 3 | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3500_DRAINAGE - SWALE PLAN_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Drainage Swale Plan | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-DR-C-3501_DRAINAGE - SWALE CROSS SECTIONS_A (Fit for Construction)_C01.pdfCondition Discharge 4 - Drainage Swale Cross Sections | 25 Nov 2022 | View |
| IH21-BHE-ZZ-XX-SK-D-0001.pdfCondition Discharge 4 - Swale Long Section | 25 Nov 2022 | View |
| IH21-GCL-EN-XX-PL-W-0001_ Rev C05 rev update_redacted(1).pdfCondition Discharge 5 - CEMP (Redacted) | 15 Dec 2022 | View |
| IH21-GCL-HS-XX-MS-W-0002 Rev C.01 General Earthworks, TM & Access Haul Roads.pdfCondition Discharge 5 - Earthworks, TM & Access Haul Roads | 25 Nov 2022 | View |
| Figure_7.1-7.5_Photo Sheets and Photomontage.pdfFigure 7.1-7.5 Photograph Sheets | 27 Nov 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Render 1 (1).pdfExeter Cycle Bridge Render 1 | 27 Nov 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Render 2 (1).pdfExeter Cycle Bridge Render 2 | 1 Dec 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Render 3 (1).pdfExeter Cycle Bridge Render 3 | 1 Dec 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Render 4 (1).pdfExeter Cycle Bridge Render 4 | 1 Dec 2020 | View |
| OP159966LD14753 Exeter Cycle Bridge Render 5 (1).pdfExeter Cycle Bridge Render 5 | 1 Dec 2020 | View |
| ApplicationFormRedacted(1).pdfNon-Material Amendment Application Form (redacted) | 2 Sept 2021 | View |
| DCCP15579-EDG-SBR-05296-DR-C-100 Location and Site Plan.pdfNon-Material Amendment Location and Site Plan - DCCP15579-EDG-SBR-05296-DR-C-100 | 2 Sept 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.