Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Denistone and Broadway Ball Clay Quarries, Kingsteignton, Devon, TQ12 3PW
Last published check: 29 Sept 2026, 07:38. Check the council record for more recent changes.
Denistone and Broadway Ball Clay Quarries, Kingsteignton, Devon, TQ12 3PW
This record has no verified map location.
Consolidating application for the winning and working of consented mineral reserves, the realignment of the Ugbrooke Stream and associated operations at Denistone and Broadway Quarries, near Kingsteignton, Devon.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| RECOMMENDATIONS REVIEW_DCC-4078-2018.pdfEIA Decision Notice (Signed) pdf | 6 Aug 2019 | View |
| OFFICERS DELEGATED REPORT_DCC-4078-2018.pdfEIA Officer's Delegated Report pdf | 6 Aug 2019 | View |
| Reg 24 statement Denistone and Broadway.pdfEIA Regulation 24 Statement pdf | 6 Aug 2019 | View |
| REGULATION 24 PCU LETTER_DCC-4078-2018.pdfEIA Regulation 24 PCU Letter | 5 Aug 2019 | View |
| 20190808143349704.pdfEIA Regulation 24 Press Notice pdf | 8 Aug 2019 | View |
| Form M1 dated 02.08.2018_Redacted.pdfMinerals Planning Application Form M1 (redacted) | 15 Aug 2018 | View |
| Form GA1 dated 02.08.2018_Redacted.pdfGeneral Planning Application Form GA1 (redacted) | 15 Aug 2018 | View |
| Figure 1.1 Site Location.pdfFigure 1.1: Site Location Plan | 16 Aug 2018 | View |
| Figure 1.2 Consolidating Planning Application Boundary.pdfFigure 1.2: Consolidating Planning Application Boundary Plan | 16 Aug 2018 | View |
| Figure 2.1 Topographic Survey.pdfFigure 2.1: Topographic Survey | 16 Aug 2018 | View |
| Figure 2.2 Existing Denistone and Broadway ROMP Boundaries.pdfFigure 2.2: Existing Denistone & Broadway ROMP Boundaries | 16 Aug 2018 | View |
| Figure 2.3 Ugbrooke Stream Historic Alignments.pdfFigure 2.3: Ugbrooke Stream Historic Alignments | 16 Aug 2018 | View |
| Figure 2.4 Public Rights of Way.pdfFigure 2.4: Public Rights of Way | 16 Aug 2018 | View |
| Figure 3.1 Existing Situation LR.pdfFigure 3.1: Existing Situation | 16 Aug 2018 | View |
| Figure 3.2 Development Overview.pdfFigure 3.2: Development Overview | 16 Aug 2018 | View |
| Figure 3.6 Phase 4 Sequence.pdfFigure 3.6: Phase 4 Sequence | 16 Aug 2018 | View |
| Figure 3.8 Restoration.pdfFigure 3.8: Revised Restoration Masterplan | 16 Aug 2018 | View |
| Figure 3.9 Green Infrastructure Plan.pdfFigure 3.9: Green Infrastructure Plan | 16 Aug 2018 | View |
| Figure 3.11 Landscape Cross Sections.pdfFigure 3.11: Cross Sections & Sightlines | 16 Aug 2018 | View |
| Figure 3.12 Typical Section.pdfFigure 3.12: Ugbrooke Stream Re-Alignment Typical Section | 16 Aug 2018 | View |
| Figure 5.1 Location of Features Referred to in Text.pdfFigure 5.1: Location of Features Referred to in Report | 16 Aug 2018 | View |
| Figure 5.2 - Phase 1 Habitat Survey.pdfFigure 5.2: Phase 1 Habitat Survey | 16 Aug 2018 | View |
| Figure 5.3 Features of Note Identified During Surveys.pdfFigure 5.3: Features of Note Identified During Surveys | 16 Aug 2018 | View |
| Figure 5.3A Location of Features Referred to in Text.pdfFigure 5.3A: Location of Features Reffered to in Report | 16 Aug 2018 | View |
| Figure 5.3B Phase 1 Habitat Survey.pdfFigure 5.3B: Phase 1 Habitat Survey | 16 Aug 2018 | View |
| Figure 5.4 Area Affected by Application.pdfFigure 5.4: Area Affected by Application | 16 Aug 2018 | View |
| Figure 5.4A Invertebrate Recording Compartments.pdfFigure 5.4A: Invertebrate Recording Compartments | 16 Aug 2018 | View |
| Figure 5.5 Restoration.pdfFigure 5.5: Restoration | 16 Aug 2018 | View |
| Figure 5.6A Locations of Ponds Assessed for Evidence of GCN.pdfFigure 5.6A: Location of Ponds Assessed for Evidence of GCN | 16 Aug 2018 | View |
| Figure 5.7A Location of Reptile Transect Surveys.pdfFigure 5.7A: Location of Reptile Transect Surveys | 16 Aug 2018 | View |
| Figure 5.8A Survey Area Common Bird Census Transect (2).pdfFigure 5.8A: Plan of Survey Area and Common Bird Census (CBC) Transect | 16 Aug 2018 | View |
| Figure 5.9A Otter Survey Results.pdfFigure 5.9A: Otter Survey Results | 16 Aug 2018 | View |
| Figure 5.10A Dormouse Survey LR.pdfFigure 5.10A: Dormouse Survey | 16 Aug 2018 | View |
| Figure 5.11A Bat Survey 2012.pdfFigure 5.11A: Bat Survey 2012 - Remote Detector Locations and Transect Routes | 16 Aug 2018 | View |
| Figure 5.11B Bat Survey 2015.pdfFigure 5.11B: Bat Survey 2015 - Remote Detector Locations and Transect Route | 16 Aug 2018 | View |
| Figure 5.11C Great Horseshoe Bat 2012 _ 2015.pdfFigure 5.11C: Location of Greater Horseshoe Bat Records from 2012 and 2015 Transect | 16 Aug 2018 | View |
| Figure 5.11D Trees Assessed for Bat Roost Potential.pdfFigure 5.11D: Location of Trees Assessed for Bat Roost Potential | 16 Aug 2018 | View |
| Figure 5.11E ID of Location of Trees T10 Group.pdfFigure 5.11E: Identification of Location Trees within the T10 Group | 16 Aug 2018 | View |
| Figure 5.13A Bat Survey 2017-18.pdfFigure 5.13A: Bat Survey 2017/18 - Remote Detector Locations and Transect Route | 16 Aug 2018 | View |
| Figure 5.13B Great Horseshoe Bat Records from 17-18.pdfFigure 5.13B: Location of Greater Horseshoe Bat Records from 2017/2018 | 16 Aug 2018 | View |
| Figure 5.15A Restoration Plan.pdfFigure 5.15A: Revised Restoration Masterplan | 16 Aug 2018 | View |
| Figure 6.1 Landscape Context.pdfFigure 6.1: Landscape Context | 16 Aug 2018 | View |
| Figure 6.2 Proposed Viewpoints.pdfFigure 6.2: Proposed Viewpoints | 16 Aug 2018 | View |
| Figure 6.3 Viewpoint 1.pdfFigure 6.3: Viewpoint 1 - Kingsteignton Footpath 3 | 16 Aug 2018 | View |
| Figure 6.4 Viewpoint 2.pdfFigure 6.4: Viewpoint 2 - Lower Preston Kingsteignton Footpath 7 | 16 Aug 2018 | View |
| Figure 6.5 Viewpoint 3.pdfFigure 6.5: Viewpoint 3 - Kingsteignton Footpath 3 | 16 Aug 2018 | View |
| Figure 6.6 Viewpoint 4.pdfFigure 6.6: Viewpoint 4 - Kingsteignton Footpath 3 | 16 Aug 2018 | View |
| Figure 6.7 Viewpoint 5.pdfFigure 6.7: Viewpoint 5 - B3193 (nr junction) | 16 Aug 2018 | View |
| Figure 6.8 Viewpoint 6.pdfFigure 6.8: Viewpoint 6 - Kingsteignton Footpath 3 | 16 Aug 2018 | View |
| Figure 6.9 Viewpoint 7.pdfFigure 6.9: Viewpoint 7 - Tempier Way | 16 Aug 2018 | View |
| Figure 6.10 Viewpoint 8.pdfFigure 6.10: Viewpoint 8 - Tempier Way Teigngrace | 16 Aug 2018 | View |
| Figure 6.11 Viewpoint 9.pdfFigure 6.11: Viewpoint 9 - Hestow Road Kingsteignton | 16 Aug 2018 | View |
| Figure 6.12 Viewpoint 10.pdfFigure 6.12: Viewpoint 10 - Churchyard - All Saints Parish Church | 16 Aug 2018 | View |
| Figure 7.1 0170.601 Section Line Location Plan.pdfFigure 7.1: Ugbrooke Steam Re-Alignment Cross Section Location Plan | 16 Aug 2018 | View |
| Figure 7.2 0170.602 LongSection.pdfFigure 7.2: Ugbrooke Stream Re-Alignment Longsection | 16 Aug 2018 | View |
| Figure 7.3 0170.603 Cross Sections 1 to 4.pdfFigure 7.3: Ugbrooke Stream Re-Alignment Cross Section 1 to 4 | 16 Aug 2018 | View |
| Figure 7.4 0170.604 Cross Sections 5 to 8.pdfFigure 7.4: Ugbrooke Stream Re-Alignment Cross Section 5 to 8 | 16 Aug 2018 | View |
| Figure 7.5 0170.605 Cross Sections 9 to 12.pdfFigure 7.5: Ugbrooke Stream Re-Alignment Cross Section 9 to 12 | 16 Aug 2018 | View |
| Figure 7.6 0170.606 Cross Sections 13 to 16.pdfFigure 7.6: Ugbrooke Stream Re-Alignment Cross Section 13 to 16 | 16 Aug 2018 | View |
| Figure 8.1 Nearest Sensitive Receptor Locations.pdfFigure 8.1: Nearest Sensitive Receptor Location | 16 Aug 2018 | View |
| Figure 8.2 Noise Phase 1 Earthwork Operations.pdfFigure 8.2: Noise Data Analysis - Phase 1 Earthwork Operations | 16 Aug 2018 | View |
| Figure 8.3 Noise Data Analysis - Phase 2.pdfFigure 8.3: Noise Data Analysis - Phase 2 Mineral Extraction Operations | 16 Aug 2018 | View |
| Figure 8.4 Noise Data Analysis - Phase 3.pdfFigure 8.4: Noise Data Analysis - Phase 3 Mineral Extraction Operations | 16 Aug 2018 | View |
| Figure 8.5 Noise Data Analysis - Phase 4.pdfFigure 8.5: Noise Data Analysis - Phase 4 Mineral Extraction Operations | 16 Aug 2018 | View |
| Figure 8.6 Noise Data Analysis - Phase 5.pdfFigure 8.6: Noise Data Analysis - Phase 5 Mineral Extraction Operations | 16 Aug 2018 | View |
| Figure 9.1 Air Quality Nearest Sensitive Receptor Locations.pdfFigure 9.1: Air Quality Nearest Sensitive Receptor Locations | 16 Aug 2018 | View |
| G5653.084B Planning Statement Figure 7 Phase 2 LR.PDFPlanning Statement Figure 7: Phase 2 - G5653.084B | 10 Dec 2018 | View |
| G5653.085B Planning Statement Figure 8 Phase 3 LR.PDFPlanning Statement Figure 8: Phase 3 - G5653.085B | 10 Dec 2018 | View |
| G5653.087B Planning Statement Figure 10 Phase 5 LR.PDFPlanning Statement Figure 10: Phase 5 - G5653.087B | 10 Dec 2018 | View |
| Figure 3.3 Phase 2.pdfFigure 3.3: Phase 2 | 16 Aug 2018 | View |
| Figure 3.4 Phase 2 LR.pdfFigure 3.4: Phase 2 | 16 Aug 2018 | View |
| Figure 3.5 Phase 3.pdfFigure 3.5: Phase 3 | 16 Aug 2018 | View |
| Figure 3.7 Phase 5.pdfFigure 3.7: Phase 5 | 16 Aug 2018 | View |
| Denistone Broadway Transport Statement Final.pdfTransport Statement | 15 Aug 2018 | View |
| Non-technical Summary 2018 FINAL.pdfNon-Technical Summary | 15 Aug 2018 | View |
| 5653.02.001 - Arboricultural Impact Assessment.pdfArboricultural Impact Assessment | 15 Aug 2018 | View |
| 5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Contents.pdfPlanning Statement | 17 Sept 2018 | View |
| 5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Appendices A.pdfPlanning Statement - Appendix A | 17 Sept 2018 | View |
| 5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Appendices B onwards.pdfPlanning Statement - Appendices B-F | 17 Sept 2018 | View |
| 5653.029 Response to Consultation Queries.pdfResponse to Consultation Questions - 5653.029 | 10 Dec 2018 | View |
| BV_Dust Management Plan FINAL_Redacted.pdfDust Management Plan December 2018 | 13 Dec 2018 | View |
| PHE Response_v2.0_Redacted.pdfAir Quality Response 10th December 2018 | 13 Dec 2018 | View |
| Denistone Broadway ES - Chapter 1 Introduction.pdf(ES) Chapter 1: Introduction | 20 Aug 2018 | View |
| Denistone Broadway ES -Chapter 2 Site Description.pdf(ES) Chapter 2: Site Description | 20 Aug 2018 | View |
| Denistone Broadway Chapter 3 Prop Development.pdf(ES) Chapter 3: Proposed Development | 20 Aug 2018 | View |
| Denistone Broadway ES - Chapter 4 EIA Approach.pdf(ES) Chapter 4: EIA Approach | 20 Aug 2018 | View |
| Appendix 4.1 Scoping Response Table V2.pdf(ES) Chapter 4 - Appendix 4.1: Scoping Response Table | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter 5 Ecology.pdf(ES) Chapter 5: Ecology | 20 Aug 2018 | View |
| Appendix 5.1 Denistone Methodology Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.1: Methodology | 16 Aug 2018 | View |
| Appendix 5.2 Denistone Background Final 18.6.18_Redacted.pdf(ES) Chapter 5 - Appendix 5.2: Background Data | 16 Aug 2018 | View |
| Appendix 5.3 Denistone Botany Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.3: Botanical Assessment | 16 Aug 2018 | View |
| Appendix 5.4 Denistone Invertebrates Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.4: Invertebrates | 16 Aug 2018 | View |
| Appendix 5.5 Denistone Fish Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.5: Fish | 16 Aug 2018 | View |
| Appendix 5.6 Denistone GCN Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.6: Great Crested Newts | 16 Aug 2018 | View |
| Appendix 5.7 Denistone Reptiles Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.7: Reptile Survey | 16 Aug 2018 | View |
| Appendix 5.8 Denistone Birds Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.8: Bird Survey | 16 Aug 2018 | View |
| Appendix 5.9 Denistone Otter Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.9: Otter and Water Vole Survey | 16 Aug 2018 | View |
| Appendix 5.10 Denistone Dormouse Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.10: Dormouse Survey | 16 Aug 2018 | View |
| Appendix 5.11 Bat 2012-15 Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.11: Bats Surveys 2012 and 2015 | 16 Aug 2018 | View |
| Appendix 5.13 Bats 2017-8 Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.13: Bat Surveys 2017/8 | 16 Aug 2018 | View |
| Appendix 5.14 Denistone Losses Gains Final 16.7.18.pdf(ES) Chapter 5 - Appendix 5.14: Habitat and Land-Use Comparison with Existing Habitats | 16 Aug 2018 | View |
| Appendix 5.15 Denistone Conservation St Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.15: Conservation Action Statement | 16 Aug 2018 | View |
| Appendix 5.16 Denistone Devon Checklist Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.16: Devon Wildlife Checklist | 16 Aug 2018 | View |
| Appendix 5.17 Denistone Shadow HRA Final 16.7.18_Redacted.pdf(ES) Chapter 5 - Appendix 5.17: Shadow Habitat Regulations Assessment | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter 6 Landscape.pdf(ES) Chapter 6: Landscape and Visual Effects | 20 Aug 2018 | View |
| Appendix 6.1 - 6.3 LVIA.pdf(ES) Chapter 6 - Appendix 6.1 - 6.3: Landscape & Visual Effects | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter 7 Hydrology.pdf(ES) Chapter 7: Hydrology & Geomorphology | 20 Aug 2018 | View |
| Appendix 7.1 - Discharge Consent SD13 and SD23_Redacted.pdf(ES) Chapter 7 - Appendix 7.1: Discharge Consent SD13 & SD23 | 16 Aug 2018 | View |
| Appendix 7.2 - Ugbrooke Stream Historic and culvert.pdf(ES) Chapter 7 - Appendix 7.2: Ugbrooke Stream Historic & Culvert | 16 Aug 2018 | View |
| Appendix 7.3 Ugbrooke Stream Geomorphological Assessment.pdf(ES) Chapter 7 - Appendix 7.3: Ugbrooke Stream Geomorphological Assessment | 16 Aug 2018 | View |
| Appendix 7.3 Ugbrooke Realignment Enhancement Criteria.pdf(ES) Chapter 7 - Appendix 7.3: Ugbrooke Realignment Enhancement Criteria | 16 Aug 2018 | View |
| Appendix 7.4 Ugbrooke Realignment Modelling Note.pdf(ES) Chapter 7 - Appendix 7.4: Ugbrooke Stream Realignment - Modelling Note - Draft | 16 Aug 2018 | View |
| Appendix 7.5 FRA V2.pdf(ES) Chapter 7 - Appendix 7.5: Flood Risk Assessment | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter 8 Noise.pdf(ES) Chapter 8: Noise | 20 Aug 2018 | View |
| Appendix 8 1 Noise Method.pdf(ES) Chapter 8 - Appendix 8.1: Noise Assessment | 16 Aug 2018 | View |
| Appendix 8.2 Noise Calibration Certs_Redacted.pdf(ES) Chapter 8 - Appendix 8.2: Noise Calibration Certificate | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter 9 Air Quality.pdf(ES) Chapter 9: Air Quality | 20 Aug 2018 | View |
| Appendix 9.1 Air Quality Method.pdf(ES) Chapter 9 - Appendix 9.1: Air Quality Assessment | 16 Aug 2018 | View |
| Denistone Broadway ES - Chapter10 ES Alternatives.pdfChapter 10: Alternatives | 20 Aug 2018 | View |
| Denistone Broadway ES - Chapter 11 Summary.pdf(ES) Chapter 11: Summary | 20 Aug 2018 | View |
| Denistone Broadway ES - Table 11.1 Summary.pdf(ES) Table 11.1: Summary of Key Impacts & Mitigation | 20 Aug 2018 | View |
| Denistone Broadway ES contents list.pdf(ES) Environmental Statement Contents | 20 Aug 2018 | View |
| G5653.048B ES Figure 3.4 Phase 2 LR.pdfES Figure 3.4: Phase 2 - G5653.048B | 13 Dec 2018 | View |
| G5653.040B ES Figure 3.5 Phase 3 LR.PDFES Figure 3.5: Phase 3 - G5653.040B | 10 Dec 2018 | View |
| G5653.061B ES Figure 3.7 Phase 5 LR.PDFES Figure 3.7: Phase 5 - G5653.061B | 10 Dec 2018 | View |
| 180823_DenistoneBroadwayquarriesv01.00_Redacted.pdfPublic Health England Response 24/08/2018 | 24 Aug 2018 | View |
| PCU.pdfPlanning Casework Unit Response 31/08/2018 | 3 Sept 2018 | View |
| TE DCC-4078-2018.pdfDCC Highways Densitone and Broadway Quarry05/09/2018 | 5 Sept 2018 | View |
| Comments(1).pdfKingsteignton Town Council Response 06/09/2018 | 6 Sept 2018 | View |
| DCC40782018_HERef_P00961503_L323889_Redacted.pdfHistoric England Response 10/09/2018 | 11 Sept 2018 | View |
| Response_DCC-4078-2018.pdfDCC Highways Response 17/09/2018 | 18 Sept 2018 | View |
| PlanningProposal_Redacted.pdfEnvironment Agency Response 17/09/2018 | 18 Sept 2018 | View |
| Comments(2).pdfTeigngrace Parish Council Response 18/09/2018 | 18 Sept 2018 | View |
| 256409 Consolidating application the realignment of the Ugbrooke Stream Kingsteignton1_Redacted.pdfNatural England Response 10/09/2018 | 18 Sept 2018 | View |
| Memo Style.pdfKingsteignton Town Council Response 21/09/2018 | 24 Sept 2018 | View |
| PlanningProposal.pdfEnvironment Agency Response 03/10/2018 | 8 Oct 2018 | View |
| 4604183_Recommendation to DCC_Redacted.pdfTeignbridge District Council Response 05/12/2018 | 5 Dec 2018 | View |
| 20181126125856819_Redacted.pdfAgreement to Extension of Time until 31/12/2018 | 27 Nov 2018 | View |
| Sibelco.pdfAgreement to Extension of Time until 30/04/2019 | 8 Mar 2019 | View |
| ApplicationFormRedacted(1).pdfCondition Discharge 9 & 30 (a) & (b) - Application Form (Redacted) | 1 Mar 2022 | View |
| E3MP Sibelco Template Final V2.pdfCondition Discharge 9 & 30 (a) & (b) - Environmental Management Plan | 1 Mar 2022 | View |
| D8339.001 Revised Restoration Plan(1).pdfCondition Discharge 9 & 30 (a) & (b) - Revised Restoration MasterPlan | 1 Mar 2022 | View |
| D8339.002-003 Detailed Planting Plan Phases 1 and 2(1).pdfCondition Discharge 9 & 30 (a) & (b) - Planting Plan Phases 1 and 2 | 1 Mar 2022 | View |
| D8339.004 Detailed Planting Plan Phase 3(1).pdfCondition Discharge 9 & 30 (a) & (b) - Planting Plan Phase 3 | 1 Mar 2022 | View |
| Figure 3.4 Phase 2 LR(1).pdfCondition Discharge 9 & 30 (a) & (b) - ES Figure 3.4: Phase 2 | 1 Mar 2022 | View |
| Figure 3.5 Phase 3(1).pdfCondition Discharge 9 & 30 (a) & (b) - ES Figure 3.5: Phase 3 | 1 Mar 2022 | View |
| Figure 5.1 Location of Features Referred to in Text(1).pdfCondition Discharge 9 & 30 (a) & (b) - Figure 5.1: Location of Features | 1 Mar 2022 | View |
| Figure 5.2 - Phase 1 Habitat Survey(1).pdfCondition Discharge 9 & 30 (a) & (b) - Figure 5.2: Phase 1 Habitat Survey | 1 Mar 2022 | View |
| Figure 6 Phase 1 LR.pdfCondition Discharge 9 & 30 (a) & (b) - Figure 6: Phase 1 (Planning Statement ) | 1 Mar 2022 | View |
| CeMP Confidential Appendix Aii Dormouse MasterPlan and Work Schedule .pdfCondition Discharge 9 & 30 (a) & (b) - CeMP Appendix Aii - Approved Masterplan | 24 Jun 2022 | View |
| E3MP Sibelco Template Final V2 with Figures.pdfCondition Discharge 9 & 30 (a) & (b) - Environmental Management, Mitigation and Monitoring Plan (Revision A May 2022) | 24 Jun 2022 | View |
| EMMMP Amendments Table.xlsxCondition Discharge 9 & 30 (a) & (b) - Table of Ammendments to Environmental Management, Mitigation and Monitoring Plan | 24 Jun 2022 | View |
| Figure 3.10 Ugbrooke Planting Plan.pdfFigure 3.10: Ugbrooke Corridor Planting | 16 Aug 2018 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.