Council planning record

Consolidating application for the winning and working of consented mineral reserves, the realignment of the Ugbrooke Stream and associated operations at Denistone and Broadway Quarries, near Kingsteignton, Devon.

Denistone and Broadway Ball Clay Quarries, Kingsteignton, Devon, TQ12 3PW

Application ApprovedReference: DCC/4078/2018Devon County Council

Last published check: 29 Sept 2026, 07:38. Check the council record for more recent changes.

Application location

Denistone and Broadway Ball Clay Quarries, Kingsteignton, Devon, TQ12 3PW

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Consolidating Permission for Winning & Working of Minerals
Received
14 Aug 2018
Validated
16 Aug 2018
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Consolidating application for the winning and working of consented mineral reserves, the realignment of the Ugbrooke Stream and associated operations at Denistone and Broadway Quarries, near Kingsteignton, Devon.

Proposal details

Reference
DCC/4078/2018
Agent
Sibelco UK Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 153 of 153

DocumentPublishedAction
RECOMMENDATIONS REVIEW_DCC-4078-2018.pdfEIA Decision Notice (Signed) pdf6 Aug 2019View
OFFICERS DELEGATED REPORT_DCC-4078-2018.pdfEIA Officer's Delegated Report pdf6 Aug 2019View
Reg 24 statement Denistone and Broadway.pdfEIA Regulation 24 Statement pdf6 Aug 2019View
REGULATION 24 PCU LETTER_DCC-4078-2018.pdfEIA Regulation 24 PCU Letter5 Aug 2019View
20190808143349704.pdfEIA Regulation 24 Press Notice pdf8 Aug 2019View
Form M1 dated 02.08.2018_Redacted.pdfMinerals Planning Application Form M1 (redacted)15 Aug 2018View
Form GA1 dated 02.08.2018_Redacted.pdfGeneral Planning Application Form GA1 (redacted)15 Aug 2018View
Figure 1.1 Site Location.pdfFigure 1.1: Site Location Plan16 Aug 2018View
Figure 1.2 Consolidating Planning Application Boundary.pdfFigure 1.2: Consolidating Planning Application Boundary Plan16 Aug 2018View
Figure 2.1 Topographic Survey.pdfFigure 2.1: Topographic Survey16 Aug 2018View
Figure 2.2 Existing Denistone and Broadway ROMP Boundaries.pdfFigure 2.2: Existing Denistone & Broadway ROMP Boundaries16 Aug 2018View
Figure 2.3 Ugbrooke Stream Historic Alignments.pdfFigure 2.3: Ugbrooke Stream Historic Alignments16 Aug 2018View
Figure 2.4 Public Rights of Way.pdfFigure 2.4: Public Rights of Way16 Aug 2018View
Figure 3.1 Existing Situation LR.pdfFigure 3.1: Existing Situation16 Aug 2018View
Figure 3.2 Development Overview.pdfFigure 3.2: Development Overview16 Aug 2018View
Figure 3.6 Phase 4 Sequence.pdfFigure 3.6: Phase 4 Sequence16 Aug 2018View
Figure 3.8 Restoration.pdfFigure 3.8: Revised Restoration Masterplan16 Aug 2018View
Figure 3.9 Green Infrastructure Plan.pdfFigure 3.9: Green Infrastructure Plan16 Aug 2018View
Figure 3.11 Landscape Cross Sections.pdfFigure 3.11: Cross Sections & Sightlines16 Aug 2018View
Figure 3.12 Typical Section.pdfFigure 3.12: Ugbrooke Stream Re-Alignment Typical Section16 Aug 2018View
Figure 5.1 Location of Features Referred to in Text.pdfFigure 5.1: Location of Features Referred to in Report16 Aug 2018View
Figure 5.2 - Phase 1 Habitat Survey.pdfFigure 5.2: Phase 1 Habitat Survey16 Aug 2018View
Figure 5.3 Features of Note Identified During Surveys.pdfFigure 5.3: Features of Note Identified During Surveys16 Aug 2018View
Figure 5.3A Location of Features Referred to in Text.pdfFigure 5.3A: Location of Features Reffered to in Report16 Aug 2018View
Figure 5.3B Phase 1 Habitat Survey.pdfFigure 5.3B: Phase 1 Habitat Survey16 Aug 2018View
Figure 5.4 Area Affected by Application.pdfFigure 5.4: Area Affected by Application16 Aug 2018View
Figure 5.4A Invertebrate Recording Compartments.pdfFigure 5.4A: Invertebrate Recording Compartments16 Aug 2018View
Figure 5.5 Restoration.pdfFigure 5.5: Restoration16 Aug 2018View
Figure 5.6A Locations of Ponds Assessed for Evidence of GCN.pdfFigure 5.6A: Location of Ponds Assessed for Evidence of GCN16 Aug 2018View
Figure 5.7A Location of Reptile Transect Surveys.pdfFigure 5.7A: Location of Reptile Transect Surveys16 Aug 2018View
Figure 5.8A Survey Area Common Bird Census Transect (2).pdfFigure 5.8A: Plan of Survey Area and Common Bird Census (CBC) Transect16 Aug 2018View
Figure 5.9A Otter Survey Results.pdfFigure 5.9A: Otter Survey Results16 Aug 2018View
Figure 5.10A Dormouse Survey LR.pdfFigure 5.10A: Dormouse Survey16 Aug 2018View
Figure 5.11A Bat Survey 2012.pdfFigure 5.11A: Bat Survey 2012 - Remote Detector Locations and Transect Routes16 Aug 2018View
Figure 5.11B Bat Survey 2015.pdfFigure 5.11B: Bat Survey 2015 - Remote Detector Locations and Transect Route16 Aug 2018View
Figure 5.11C Great Horseshoe Bat 2012 _ 2015.pdfFigure 5.11C: Location of Greater Horseshoe Bat Records from 2012 and 2015 Transect16 Aug 2018View
Figure 5.11D Trees Assessed for Bat Roost Potential.pdfFigure 5.11D: Location of Trees Assessed for Bat Roost Potential16 Aug 2018View
Figure 5.11E ID of Location of Trees T10 Group.pdfFigure 5.11E: Identification of Location Trees within the T10 Group16 Aug 2018View
Figure 5.13A Bat Survey 2017-18.pdfFigure 5.13A: Bat Survey 2017/18 - Remote Detector Locations and Transect Route16 Aug 2018View
Figure 5.13B Great Horseshoe Bat Records from 17-18.pdfFigure 5.13B: Location of Greater Horseshoe Bat Records from 2017/201816 Aug 2018View
Figure 5.15A Restoration Plan.pdfFigure 5.15A: Revised Restoration Masterplan16 Aug 2018View
Figure 6.1 Landscape Context.pdfFigure 6.1: Landscape Context16 Aug 2018View
Figure 6.2 Proposed Viewpoints.pdfFigure 6.2: Proposed Viewpoints16 Aug 2018View
Figure 6.3 Viewpoint 1.pdfFigure 6.3: Viewpoint 1 - Kingsteignton Footpath 316 Aug 2018View
Figure 6.4 Viewpoint 2.pdfFigure 6.4: Viewpoint 2 - Lower Preston Kingsteignton Footpath 716 Aug 2018View
Figure 6.5 Viewpoint 3.pdfFigure 6.5: Viewpoint 3 - Kingsteignton Footpath 316 Aug 2018View
Figure 6.6 Viewpoint 4.pdfFigure 6.6: Viewpoint 4 - Kingsteignton Footpath 316 Aug 2018View
Figure 6.7 Viewpoint 5.pdfFigure 6.7: Viewpoint 5 - B3193 (nr junction)16 Aug 2018View
Figure 6.8 Viewpoint 6.pdfFigure 6.8: Viewpoint 6 - Kingsteignton Footpath 316 Aug 2018View
Figure 6.9 Viewpoint 7.pdfFigure 6.9: Viewpoint 7 - Tempier Way16 Aug 2018View
Figure 6.10 Viewpoint 8.pdfFigure 6.10: Viewpoint 8 - Tempier Way Teigngrace16 Aug 2018View
Figure 6.11 Viewpoint 9.pdfFigure 6.11: Viewpoint 9 - Hestow Road Kingsteignton16 Aug 2018View
Figure 6.12 Viewpoint 10.pdfFigure 6.12: Viewpoint 10 - Churchyard - All Saints Parish Church16 Aug 2018View
Figure 7.1 0170.601 Section Line Location Plan.pdfFigure 7.1: Ugbrooke Steam Re-Alignment Cross Section Location Plan16 Aug 2018View
Figure 7.2 0170.602 LongSection.pdfFigure 7.2: Ugbrooke Stream Re-Alignment Longsection16 Aug 2018View
Figure 7.3 0170.603 Cross Sections 1 to 4.pdfFigure 7.3: Ugbrooke Stream Re-Alignment Cross Section 1 to 416 Aug 2018View
Figure 7.4 0170.604 Cross Sections 5 to 8.pdfFigure 7.4: Ugbrooke Stream Re-Alignment Cross Section 5 to 816 Aug 2018View
Figure 7.5 0170.605 Cross Sections 9 to 12.pdfFigure 7.5: Ugbrooke Stream Re-Alignment Cross Section 9 to 1216 Aug 2018View
Figure 7.6 0170.606 Cross Sections 13 to 16.pdfFigure 7.6: Ugbrooke Stream Re-Alignment Cross Section 13 to 1616 Aug 2018View
Figure 8.1 Nearest Sensitive Receptor Locations.pdfFigure 8.1: Nearest Sensitive Receptor Location16 Aug 2018View
Figure 8.2 Noise Phase 1 Earthwork Operations.pdfFigure 8.2: Noise Data Analysis - Phase 1 Earthwork Operations16 Aug 2018View
Figure 8.3 Noise Data Analysis - Phase 2.pdfFigure 8.3: Noise Data Analysis - Phase 2 Mineral Extraction Operations16 Aug 2018View
Figure 8.4 Noise Data Analysis - Phase 3.pdfFigure 8.4: Noise Data Analysis - Phase 3 Mineral Extraction Operations16 Aug 2018View
Figure 8.5 Noise Data Analysis - Phase 4.pdfFigure 8.5: Noise Data Analysis - Phase 4 Mineral Extraction Operations16 Aug 2018View
Figure 8.6 Noise Data Analysis - Phase 5.pdfFigure 8.6: Noise Data Analysis - Phase 5 Mineral Extraction Operations16 Aug 2018View
Figure 9.1 Air Quality Nearest Sensitive Receptor Locations.pdfFigure 9.1: Air Quality Nearest Sensitive Receptor Locations16 Aug 2018View
G5653.084B Planning Statement Figure 7 Phase 2 LR.PDFPlanning Statement Figure 7: Phase 2 - G5653.084B10 Dec 2018View
G5653.085B Planning Statement Figure 8 Phase 3 LR.PDFPlanning Statement Figure 8: Phase 3 - G5653.085B10 Dec 2018View
G5653.087B Planning Statement Figure 10 Phase 5 LR.PDFPlanning Statement Figure 10: Phase 5 - G5653.087B10 Dec 2018View
Figure 3.3 Phase 2.pdfFigure 3.3: Phase 216 Aug 2018View
Figure 3.4 Phase 2 LR.pdfFigure 3.4: Phase 216 Aug 2018View
Figure 3.5 Phase 3.pdfFigure 3.5: Phase 316 Aug 2018View
Figure 3.7 Phase 5.pdfFigure 3.7: Phase 516 Aug 2018View
Denistone Broadway Transport Statement Final.pdfTransport Statement15 Aug 2018View
Non-technical Summary 2018 FINAL.pdfNon-Technical Summary15 Aug 2018View
5653.02.001 - Arboricultural Impact Assessment.pdfArboricultural Impact Assessment15 Aug 2018View
5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Contents.pdfPlanning Statement17 Sept 2018View
5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Appendices A.pdfPlanning Statement - Appendix A17 Sept 2018View
5653.023A PLANNING STATEMENT COMPLETE 2_Redacted Appendices B onwards.pdfPlanning Statement - Appendices B-F17 Sept 2018View
5653.029 Response to Consultation Queries.pdfResponse to Consultation Questions - 5653.02910 Dec 2018View
BV_Dust Management Plan FINAL_Redacted.pdfDust Management Plan December 201813 Dec 2018View
PHE Response_v2.0_Redacted.pdfAir Quality Response 10th December 201813 Dec 2018View
Denistone Broadway ES - Chapter 1 Introduction.pdf(ES) Chapter 1: Introduction20 Aug 2018View
Denistone Broadway ES -Chapter 2 Site Description.pdf(ES) Chapter 2: Site Description20 Aug 2018View
Denistone Broadway Chapter 3 Prop Development.pdf(ES) Chapter 3: Proposed Development20 Aug 2018View
Denistone Broadway ES - Chapter 4 EIA Approach.pdf(ES) Chapter 4: EIA Approach20 Aug 2018View
Appendix 4.1 Scoping Response Table V2.pdf(ES) Chapter 4 - Appendix 4.1: Scoping Response Table16 Aug 2018View
Denistone Broadway ES - Chapter 5 Ecology.pdf(ES) Chapter 5: Ecology20 Aug 2018View
Appendix 5.1 Denistone Methodology Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.1: Methodology16 Aug 2018View
Appendix 5.2 Denistone Background Final 18.6.18_Redacted.pdf(ES) Chapter 5 - Appendix 5.2: Background Data16 Aug 2018View
Appendix 5.3 Denistone Botany Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.3: Botanical Assessment16 Aug 2018View
Appendix 5.4 Denistone Invertebrates Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.4: Invertebrates16 Aug 2018View
Appendix 5.5 Denistone Fish Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.5: Fish16 Aug 2018View
Appendix 5.6 Denistone GCN Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.6: Great Crested Newts16 Aug 2018View
Appendix 5.7 Denistone Reptiles Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.7: Reptile Survey16 Aug 2018View
Appendix 5.8 Denistone Birds Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.8: Bird Survey16 Aug 2018View
Appendix 5.9 Denistone Otter Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.9: Otter and Water Vole Survey16 Aug 2018View
Appendix 5.10 Denistone Dormouse Complete Final 20.6.18 .pdf(ES) Chapter 5 - Appendix 5.10: Dormouse Survey16 Aug 2018View
Appendix 5.11 Bat 2012-15 Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.11: Bats Surveys 2012 and 201516 Aug 2018View
Appendix 5.13 Bats 2017-8 Complete Final 16.7.18 .pdf(ES) Chapter 5 - Appendix 5.13: Bat Surveys 2017/816 Aug 2018View
Appendix 5.14 Denistone Losses Gains Final 16.7.18.pdf(ES) Chapter 5 - Appendix 5.14: Habitat and Land-Use Comparison with Existing Habitats16 Aug 2018View
Appendix 5.15 Denistone Conservation St Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.15: Conservation Action Statement16 Aug 2018View
Appendix 5.16 Denistone Devon Checklist Final 20.6.18.pdf(ES) Chapter 5 - Appendix 5.16: Devon Wildlife Checklist16 Aug 2018View
Appendix 5.17 Denistone Shadow HRA Final 16.7.18_Redacted.pdf(ES) Chapter 5 - Appendix 5.17: Shadow Habitat Regulations Assessment16 Aug 2018View
Denistone Broadway ES - Chapter 6 Landscape.pdf(ES) Chapter 6: Landscape and Visual Effects20 Aug 2018View
Appendix 6.1 - 6.3 LVIA.pdf(ES) Chapter 6 - Appendix 6.1 - 6.3: Landscape & Visual Effects16 Aug 2018View
Denistone Broadway ES - Chapter 7 Hydrology.pdf(ES) Chapter 7: Hydrology & Geomorphology20 Aug 2018View
Appendix 7.1 - Discharge Consent SD13 and SD23_Redacted.pdf(ES) Chapter 7 - Appendix 7.1: Discharge Consent SD13 & SD2316 Aug 2018View
Appendix 7.2 - Ugbrooke Stream Historic and culvert.pdf(ES) Chapter 7 - Appendix 7.2: Ugbrooke Stream Historic & Culvert16 Aug 2018View
Appendix 7.3 Ugbrooke Stream Geomorphological Assessment.pdf(ES) Chapter 7 - Appendix 7.3: Ugbrooke Stream Geomorphological Assessment16 Aug 2018View
Appendix 7.3 Ugbrooke Realignment Enhancement Criteria.pdf(ES) Chapter 7 - Appendix 7.3: Ugbrooke Realignment Enhancement Criteria16 Aug 2018View
Appendix 7.4 Ugbrooke Realignment Modelling Note.pdf(ES) Chapter 7 - Appendix 7.4: Ugbrooke Stream Realignment - Modelling Note - Draft16 Aug 2018View
Appendix 7.5 FRA V2.pdf(ES) Chapter 7 - Appendix 7.5: Flood Risk Assessment16 Aug 2018View
Denistone Broadway ES - Chapter 8 Noise.pdf(ES) Chapter 8: Noise20 Aug 2018View
Appendix 8 1 Noise Method.pdf(ES) Chapter 8 - Appendix 8.1: Noise Assessment16 Aug 2018View
Appendix 8.2 Noise Calibration Certs_Redacted.pdf(ES) Chapter 8 - Appendix 8.2: Noise Calibration Certificate16 Aug 2018View
Denistone Broadway ES - Chapter 9 Air Quality.pdf(ES) Chapter 9: Air Quality20 Aug 2018View
Appendix 9.1 Air Quality Method.pdf(ES) Chapter 9 - Appendix 9.1: Air Quality Assessment16 Aug 2018View
Denistone Broadway ES - Chapter10 ES Alternatives.pdfChapter 10: Alternatives20 Aug 2018View
Denistone Broadway ES - Chapter 11 Summary.pdf(ES) Chapter 11: Summary20 Aug 2018View
Denistone Broadway ES - Table 11.1 Summary.pdf(ES) Table 11.1: Summary of Key Impacts & Mitigation20 Aug 2018View
Denistone Broadway ES contents list.pdf(ES) Environmental Statement Contents20 Aug 2018View
G5653.048B ES Figure 3.4 Phase 2 LR.pdfES Figure 3.4: Phase 2 - G5653.048B13 Dec 2018View
G5653.040B ES Figure 3.5 Phase 3 LR.PDFES Figure 3.5: Phase 3 - G5653.040B10 Dec 2018View
G5653.061B ES Figure 3.7 Phase 5 LR.PDFES Figure 3.7: Phase 5 - G5653.061B10 Dec 2018View
180823_DenistoneBroadwayquarriesv01.00_Redacted.pdfPublic Health England Response 24/08/201824 Aug 2018View
PCU.pdfPlanning Casework Unit Response 31/08/20183 Sept 2018View
TE DCC-4078-2018.pdfDCC Highways Densitone and Broadway Quarry05/09/20185 Sept 2018View
Comments(1).pdfKingsteignton Town Council Response 06/09/20186 Sept 2018View
DCC40782018_HERef_P00961503_L323889_Redacted.pdfHistoric England Response 10/09/201811 Sept 2018View
Response_DCC-4078-2018.pdfDCC Highways Response 17/09/201818 Sept 2018View
PlanningProposal_Redacted.pdfEnvironment Agency Response 17/09/201818 Sept 2018View
Comments(2).pdfTeigngrace Parish Council Response 18/09/201818 Sept 2018View
256409 Consolidating application the realignment of the Ugbrooke Stream Kingsteignton1_Redacted.pdfNatural England Response 10/09/201818 Sept 2018View
Memo Style.pdfKingsteignton Town Council Response 21/09/201824 Sept 2018View
PlanningProposal.pdfEnvironment Agency Response 03/10/20188 Oct 2018View
4604183_Recommendation to DCC_Redacted.pdfTeignbridge District Council Response 05/12/20185 Dec 2018View
20181126125856819_Redacted.pdfAgreement to Extension of Time until 31/12/201827 Nov 2018View
Sibelco.pdfAgreement to Extension of Time until 30/04/20198 Mar 2019View
ApplicationFormRedacted(1).pdfCondition Discharge 9 & 30 (a) & (b) - Application Form (Redacted)1 Mar 2022View
E3MP Sibelco Template Final V2.pdfCondition Discharge 9 & 30 (a) & (b) - Environmental Management Plan1 Mar 2022View
D8339.001 Revised Restoration Plan(1).pdfCondition Discharge 9 & 30 (a) & (b) - Revised Restoration MasterPlan1 Mar 2022View
D8339.002-003 Detailed Planting Plan Phases 1 and 2(1).pdfCondition Discharge 9 & 30 (a) & (b) - Planting Plan Phases 1 and 21 Mar 2022View
D8339.004 Detailed Planting Plan Phase 3(1).pdfCondition Discharge 9 & 30 (a) & (b) - Planting Plan Phase 31 Mar 2022View
Figure 3.4 Phase 2 LR(1).pdfCondition Discharge 9 & 30 (a) & (b) - ES Figure 3.4: Phase 21 Mar 2022View
Figure 3.5 Phase 3(1).pdfCondition Discharge 9 & 30 (a) & (b) - ES Figure 3.5: Phase 31 Mar 2022View
Figure 5.1 Location of Features Referred to in Text(1).pdfCondition Discharge 9 & 30 (a) & (b) - Figure 5.1: Location of Features1 Mar 2022View
Figure 5.2 - Phase 1 Habitat Survey(1).pdfCondition Discharge 9 & 30 (a) & (b) - Figure 5.2: Phase 1 Habitat Survey1 Mar 2022View
Figure 6 Phase 1 LR.pdfCondition Discharge 9 & 30 (a) & (b) - Figure 6: Phase 1 (Planning Statement )1 Mar 2022View
CeMP Confidential Appendix Aii Dormouse MasterPlan and Work Schedule .pdfCondition Discharge 9 & 30 (a) & (b) - CeMP Appendix Aii - Approved Masterplan24 Jun 2022View
E3MP Sibelco Template Final V2 with Figures.pdfCondition Discharge 9 & 30 (a) & (b) - Environmental Management, Mitigation and Monitoring Plan (Revision A May 2022)24 Jun 2022View
EMMMP Amendments Table.xlsxCondition Discharge 9 & 30 (a) & (b) - Table of Ammendments to Environmental Management, Mitigation and Monitoring Plan24 Jun 2022View
Figure 3.10 Ugbrooke Planting Plan.pdfFigure 3.10: Ugbrooke Corridor Planting16 Aug 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Issue Date

    Published milestoneCouncil source

Decision & conditions

Conditional Approval
RECOMMENDATIONS REVIEW_DCC-4078-2018.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.