Council planning record

Variation of conditions 3 and 5 of planning permission 05/3070/04 for proposed integrated waste management facility consisting of dry recyclate and commercial and industrial waste materials recycling facilities, incorporating small vehicle transfer station, enclosed composting facility, fitters' wor...

Heathfield Landfill, John Acres Lane, Fosterville, Sandygate, TQ12 3GP

Temporary Permission ExpiredReference: DCC/4041/2018Devon County Council

Last published check: 29 Sept 2026, 12:33. Check the council record for more recent changes.

Application location

Heathfield Landfill, John Acres Lane, Fosterville, Sandygate, TQ12 3GP

This record has no verified map location.

Application summary

Status
Temporary Permission Expired
Application type
Variation of Condition
Received
26 Jan 2018
Validated
26 Jan 2018
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Variation of conditions 3 and 5 of planning permission 05/3070/04 for proposed integrated waste management facility consisting of dry recyclate and commercial and industrial waste materials recycling facilities, incorporating small vehicle transfer station, enclosed composting facility, fitters' wor...

Proposal details

Reference
DCC/4041/2018
Agent
Miss Joanna Freyther

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 68 of 68

DocumentPublishedAction
RECOMMENDATIONS REVIEW_DCC-4041-2018(1).pdfDecision Notice pdf12 Dec 2018View
Heathfield Landfill Reg 30 Statement.pdfEIA Regulation 30 Statement28 Sept 2018View
20181221110120933.pdfEIA Decision Press Notice pdf21 Dec 2018View
REGULATION 30 PCU LETTER_DCC-4041-2018.pdfEIA Regulation 30 PCU Letter21 Dec 2018View
rt300818dma Heathfield Farmhouse and existing offices and workshops at Heathfield Landfill Site John.pdfCommittee Report11 Sept 2018View
applicationform.pdfApplication Form29 Jan 2018View
180117_HL-2-1-Site Location Plan(1).pdfSite Location Plan - HL/2/126 Jan 2018View
HL-2-2-Planning Application Boundary-HL-2-2.pdfPlanning Application Boundary - HL/2/226 Jan 2018View
180126_HL-3-1-ExistingSurvey.pdfExisting Site Survey - HL/3/126 Jan 2018View
HL-3-2-PhasingPlan_revised_lr.pdfPhasing Plan - HL/3/226 Jan 2018View
180125_HL-3-3-Cross Sections.pdfCross Sections - HL/3/326 Jan 2018View
180125_HL-3-4-Pre-SettlementRestoration.pdfPre-settlement Restoration Plan - HL/3/426 Jan 2018View
422.00036.00734.27.HL 3-5.0_RESTORATION_MASTERPLAN.PDFRestoration Masterplan - HL/3/529 Jan 2018View
Preface for all volumes.pdfPreface - All Volumes6 Feb 2018View
18.01.26 402.00036.00817 covering letter to dcc.pdfCovering letter29 Jan 2018View
Contents - Volume 1 (1).pdfVolume 1 - Planning Application - Contents6 Feb 2018View
180126_402.00036.00817_planning statement_final(1).pdfVolume 1 - Planning Statement29 Jan 2018View
18.01.24 402.0036.00817 appendix a_dust control scheme_final.pdfVolume 1 - Appendix A - Dust Control Scheme29 Jan 2018View
18.01.24 402.0036.00817_appendix b_ lighting scheme_final.pdfVolume 1 - Appendix B - Lighting Scheme29 Jan 2018View
18.01.24 402.0036.00817 appendix c_ wind blown litter scheme_final.pdfVolume 1 - Appendix C - Scheme for Minimising Wind Blown Litter29 Jan 2018View
18.01.24 402.0036.00817 appendix e_vermin control scheme_final.pdfVolume 1 - Appendix E - Vermin Control Scheme29 Jan 2018View
18.01.24 402.0036.00817 appendix f_pollution control statement_final.pdfVolume 1 - Appendix F - Pollution Control Statement29 Jan 2018View
18.01.24 402.0036.00817 appendix g_green infrastructure statement_final.pdfVolume 1 - Appendix G - Green Infrastructure Statement29 Jan 2018View
18.01.26 402.0036.00817 appendix h_ waste planning statement_final.pdfVolume 1 - Appendix H - Waste Planning Statement29 Jan 2018View
18.01.24 402.0036.00817 appendix i_site utilities plan_final.pdfVolume 1 - Appendix I - Utilities Site Survey29 Jan 2018View
18.01.24 402.0036.00817 appendix j community consultation statement_final.pdfVolume 1 - Appendix J - Community Consultation Statement29 Jan 2018View
18.01.26 402.0036.00817 appendix k ecological managment plan_final.pdfVolume 1 - Appendix K - Ecological Management Plan29 Jan 2018View
180716_Heathfield_Reg25_issue_Redacted.pdfRegulation 25 Response - Covering Letter17 Jul 2018View
Heathfield Environmental Permit.pdfRegulation 25 Response - Environmental Permit17 Jul 2018View
180612_Heathfield_trafficnote_issue.pdfRegulation 25 Response - Traffic Technical Note17 Jul 2018View
180716_402_00036_00817_Appendix HL 9.3_Appropriate Assessment (Supporting Document)_Heathfield Landfill_Proposed Extension_issue.pdfRegulation 25 Response - Environmental Statement - Volume 2 - Chapter 9 - Appendix HL/9.3 - Appropriate Assessment Document17 Jul 2018View
180716_402_00036_00817 ES_Chapter 9a Ecology_issue.pdfRegulation 25 Response - Environmental Statement - Volume 2 - Chapter 9A - Ecology17 Jul 2018View
180621_402.00036.00817_Appendix D_Noise_final2.pdfRegulation 25 Response - Volume 1 - Appendix D - Noise Control Scheme17 Jul 2018View
Contents - Volume 2.pdfVolume 2 - Environmental Statement - Contents6 Feb 2018View
180124 402.00036.00817_heathfield_es_introduction_c1_final(2).pdfVolume 2 - Chapter 1 - Introduction29 Jan 2018View
180125 402.00036.00817_heathfield_es_c2_site and surrounds_final.pdfVolume 2 - Chapter 2 - Site and Surroundings29 Jan 2018View
180126_402.00036.00817 es chapter 3 description of dev_final.pdfVolume 2 - Chapter 3 - Description of Development29 Jan 2018View
18.01.24.402.00036.00817_heathfield_es-c4 policy_final.pdfVolume 2 - Chapter 4 - Planning Policy Review29 Jan 2018View
180126_402.00036.00817 heathfield es_ch 5_traffic_final.pdfVolume 2 - Chapter 5 - Traffic29 Jan 2018View
180126_402.00036.00817_heathfield es_ch 6_aq_final.pdfVolume 2 - Chapter 6 - Air Quality and Odour29 Jan 2018View
18.01.24 402.00036.00817 heathfield_es_c7_noise_final.pdfVolume 2 - Chapter 7 - Noise Impact Assessment29 Jan 2018View
18.01.26 402.00036.00817Heathfield_ES_Ch 8_Hydro_Final-SMALL.PDFVolume 2 - Chapter 8 - Water Environment29 Jan 2018View
171120_422_00036_000734_appendix hl9.4 heathfield_ecological management plan_2017.pdfVolume 2 - Chapter 9 - Appendix HL/9.4 - Ecological Management Plan29 Jan 2018View
180126 402.00036.00817heathfield_es_ch10_ lvia_final.pdfVolume 2 - Chapter 10 - Landscape & Visual29 Jan 2018View
181024_4020003600817_heathfield_ es_c11_population_final.pdfVolume 2 - Chapter 11 - Population and Land Use29 Jan 2018View
18.01.26 402.00036.00817 heathfield_es ch 12 conclusions_final.pdfVolume 2 - Chapter 12 - Conclusions29 Jan 2018View
180126_402.00036.00817 es_nts_final(1).pdfVolume 3 - Non- Technical Summary29 Jan 2018View
18.01.24 402.0036.00817 appendix d_noise control scheme_final.pdfSuperseded - Volume 1 - Appendix D - Noise Control Scheme29 Jan 2018View
18.01.26 402.00036.00871heathfield_ es_ch 9 ecology_final(1).pdfSuperseded - Volume 2 - Chapter 9 - Ecology29 Jan 2018View
180122_402_00036_00817_Appendix HL 9.3_Appropriate Assessment (Supporting Document)_Heathfield Landfill_Proposed Extension(1) A.pdfSuperseded - Volume 2 - Chapter 9 - Appendix HL/9.3 - Appropriate Assessment Document29 Jan 2018View
Heathfield HRA August 2018 DCC 4041 2017.pdfHeathfield Landfill Site HRA August 201819 Sept 2018View
Comments (1).pdfDevon Stone Federation Response - 13/02/201814 Feb 2018View
238498 additional waste disposal capacity, Heathfield Landfill site, John Acres Lane, Kingsteignton_Redacted.pdfNatural England Response 22/02/201823 Feb 2018View
Response_DCC-4041-2018(1).pdfDCC Highways Response 19/02/201826 Feb 2018View
4341527_Recommendation to DCC_Redacted.pdfTeignbridge District Council Response 23/02/201826 Feb 2018View
Heathfield landfill site DCC 4041 2018 2.3.18..pdfHennock Parish Council Response 02/03/20182 Mar 2018View
PlanningProposal_Redacted.pdfEnvironment Agency Response 09/03/20189 Mar 2018View
DCC re Heathfield Planning application DCC.4041.pdfKingsteignton Town Council Response 15/03/201816 Mar 2018View
Comments (1)(3).pdfTeignbridge District Council Environmental Health Response 21/03/201821 Mar 2018View
TE DCC-4041-2018- 2.pdfDCC Highways Response (Updated) 09/04/201810 Apr 2018View
Councillor Peart(1).pdfResponse from Councillor Peart 04/07/20185 Jul 2018View
TE DCC-4041-2018- 3.pdfDCC Highways Response 30/07/201830 Jul 2018View
252939 additional waste disposal capacity, Heathfield Landfill site, John Acres Lane, Kingsteignton_Redacted.pdfNatural England Response 01/08/20186 Aug 2018View
Kingsteignton TC.pdfKingsteignton Town Council Response 23/08/201823 Aug 2018View
Planning Performance Agreement_Redacted.pdfPlanning Performance Agreement6 Feb 2018View
Heathfield Landfill Site - Reg 25 request.pdfReg 25 request for further information8 May 2018View
Heathfield Landfill - PPA review(1).pdfPlanning Performance Agreement - Reviewed date12 Nov 2018View
Agreement dated 11 Dec 18 relating to land at Heathfield Landfill Site John Acres Lane Kingsteignton TQ12 3GP_Redacted.pdfSection 106 Agreement12 Dec 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Issue Date

    Published milestoneCouncil source

Decision & conditions

Conditional Approval
RECOMMENDATIONS REVIEW_DCC-4041-2018(1).pdf 20181221110120933.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.