Council planning record

The construction of new park and ride facility at the A30/A377 interchange, Exeter, including 556 car parking spaces; a new roundabout to provide access to the site from the C50; a new access road/entrance; circulatory access routes; bus stop facilities; cycle storage and cycle rack; lighting; secur...

Round Field, A30/A377 Interchange, Ide, Exeter, EX2 9RY

Application WithdrawnReference: DCC/3846/2016Devon County Council

Last published check: 21 Sept 2026, 10:01. Check the council record for more recent changes.

Application location

Round Field, A30/A377 Interchange, Ide, Exeter, EX2 9RY

This record has no verified map location.

Application summary

Status
Application Withdrawn
Application type
Full Planning Consent
Received
25 Feb 2016
Validated
1 Mar 2016
Determination deadline
Not published
Local authority
Devon County Council

Application overview

The construction of new park and ride facility at the A30/A377 interchange, Exeter, including 556 car parking spaces; a new roundabout to provide access to the site from the C50; a new access road/entrance; circulatory access routes; bus stop facilities; cycle storage and cycle rack; lighting; secur...

Proposal details

Reference
DCC/3846/2016
Agent
Ms Victoria Lloyd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 48 of 48

DocumentPublishedAction
applicationform.pdfApplication Form26 Feb 2016View
B2300324_200 REV00 - LOCATION PLAN(1).pdfLocation Plan - B2300324/200 Rev 0026 Feb 2016View
B2300324_201 REV00 - EXISTING SITE PLAN.pdfExisting Site Plan - B2300324/201 Rev 0026 Feb 2016View
B2300324_203 REV01 - SITE DRAINAGE PLAN.pdfSite Drainage Plan - B2300324/203 Rev 0126 Feb 2016View
B2300324_210 REV01 - EXISTING GROUND & FINISHED SURFACE LEVELS LONGITUDINAL SECTION 1-1.pdfExisting Ground & Finished Surface Levels Longitudinal Section 1-1 - B2300324/210 Rev 0126 Feb 2016View
B2300324_211 REV00 - EXISTING GROUND & FINISHED SURFACE LEVELS LONGITUDINAL SECTIONA A-A B-B & C-C.pdfExisting Ground & Finished Surface Levels Longitudinal Sections A-A, B-B & C-C - B2300324/211 Rev 0026 Feb 2016View
B2300324_212 REV01 - ROUNDABOUT LAYOUT PLAN.pdfRoundabout Layout Plan - B2300324/212 Rev 0126 Feb 2016View
B2300324_216 REV04 - SITE LAYOUT PLAN.pdfSite Layout Plan - B2300324/216 Rev 0426 Feb 2016View
B2300324_218 REV00 - BUS SHELTER DETAILS PLAN & ELEVATIONS.pdfBus Shelter Details Plan & Elevations - B2300324/218 Rev 0026 Feb 2016View
B2300324_221 REV03 - ASSOCIATED HIGHWAYS IMPROVEMENTS.pdfAssociated Highways Improvements - B2300324/221 Rev 0326 Feb 2016View
B2300324_222 REV00 - ENTRANCE GATES DETAILS PLAN & ELEVATION.pdfEntrance Gates Details Plan & Elevation - B2300324/222 Rev 0026 Feb 2016View
B2300324_225 REV00 - UTILITIES HAZARD PLAN.pdfUtilities Hazard Plan - B2300324/225 Rev 0026 Feb 2016View
Planning Statement Rev 01.pdfPlanning Statement26 Feb 2016View
Phase 2 Ecology Survey Report_rev 0.pdfPhase 2 Ecology Survey Report26 Feb 2016View
Wildlife Report_rev 0.pdfWildlife Report26 Feb 2016View
Round Field Park and Ride wildlife andgeology trigger list.pdfWildlife and Geology Trigger Table1 Mar 2016View
Landscape and Visual Impact Assessment Rev03.pdfLandscape Assessment26 Feb 2016View
Land Quality Assessment rev 01.pdfLand Quality Assessment26 Feb 2016View
Tree Survey.pdfTree Survey26 Feb 2016View
Historic Environment Desk Based Assessment Rev 03.pdfHistoric Environment Desk Based Assessment26 Feb 2016View
Archaeological Watching Brief Rev C.pdfArchaeological Watching Brief26 Feb 2016View
Noise Assessment Rev 00.pdfNoise Assessment26 Feb 2016View
Lighting Report REV01.pdfLighting Report26 Feb 2016View
Level 1 Flood Risk Assessment Rev 01.pdfLevel 1 Flood Risk Assessment26 Feb 2016View
Air Quality Assessment.pdfAir Quality Assessment26 Feb 2016View
Transport Assessment Rev 03.pdfTransport Assessment26 Feb 2016View
Ground Investigation Report Rev 01.pdfPreliminary Ground Investigation Report26 Feb 2016View
DCC Waste Policy Response.pdfDCC Waste Policy Response dated 03/03/163 Mar 2016View
ECC Environmental Health Response.pdfECC Environmental Health Response dated 04/03/164 Mar 2016View
29018a.pdfDCC Historic Environment Response dated 04/03/164 Mar 2016View
Environment Agency Response.pdfEnvironment Agency Response dated 08/03/169 Mar 2016View
DWT comments 11.3.pdfDevon Wildlife Trust Response dated 10/03/1614 Mar 2016View
Highways England Response.pdfHighways England Response dated 23/03/1624 Mar 2016View
DCC.3846.2016.pdfDCC Flood Risk Response dated 23/03/1624 Mar 2016View
Park and Ride response.pdfExeter City Council Response dated 29/03/1629 Mar 2016View
Highways response.pdfDCC Highways Response provided 06/04/20167 Apr 2016View
ECC Further Comments.pdfExeter City Council Further Response dated 06/04/20167 Apr 2016View
landscape comments_DCC.pdfDCC Landscape Response dated 07/04/201612 Apr 2016View
Ide PC comments and objection to P&R scheme final version 13 4 16.pdfIde Parish Council Response dated 13/04/201614 Apr 2016View
Ecology Response.pdfDCC Ecology Response provided 25/04/201626 Apr 2016View
3775135_Recommendation to DCC.pdfTeignbridge District Council Response dated 05/05/166 May 2016View
Exeter Chamber of Commerce.pdfRepresentation - Exeter Chamber of Commerce15 Mar 2016View
Exeter Cycling Campaign.pdfExeter Cycling Campaign Response dated 16/03/1629 Mar 2016View
CPRE Response.pdfRepresentation - Peter Finch, Campaign to Protect Rural England27 Apr 2016View
EXTENSION OF TIME LETTER_DCC-3846-2016.pdfLetter to Agent - Extension of time request10 May 2016View
ONE OFF LETTER (CM OR CCD)_DCC-3846-2016(1)(3).pdfLetter to Agent - Request for further information10 May 2016View
Extension of time agreement.pdfEmail from Agent - Agreeing extension of time18 May 2016View
Letter of withdrawal.pdfEmail from Applicant - Confirming withdrawal27 May 2016View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source
  4. Issue Date

    Published milestoneCouncil source
  5. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Withdrawn After Validation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.