Variation of (i) condition 3 of planning permission 9/42/49/0542/85/3 to allow the continued extraction of tungsten and tin, processing and disposal of mineral wastes until 5 June 2036 and (ii) removal of condition 13 of planning permission 9/42/49/0542/85/3 to remove the restriction on the operatin...

Drakelands (previously Hemerdon) Mine, Drakelands, Nr PLYMOUTH, Devon PL7 5BS

Application ApprovedReference: DCC/3823/2015Devon County Council

Last published check: 21 Sept 2026, 10:37. Check the council record for more recent changes.

Application location

Drakelands (previously Hemerdon) Mine, Drakelands, Nr PLYMOUTH, Devon PL7 5BS

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Variation of Condition
Received
7 Dec 2015
Validated
9 Dec 2015
Determination deadline
Not published
Local authority
Devon County Council

Application overview

Variation of (i) condition 3 of planning permission 9/42/49/0542/85/3 to allow the continued extraction of tungsten and tin, processing and disposal of mineral wastes until 5 June 2036 and (ii) removal of condition 13 of planning permission 9/42/49/0542/85/3 to remove the restriction on the operatin...

Proposal details

Reference
DCC/3823/2015
Agent
Mr Chris Lowden

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 142 of 142

DocumentPublishedAction
20170216134736552.pdfSigned Decision Notice pdf16 Feb 2017View
Document1(2).pdfRegulation 24 Statement15 Mar 2017View
20170315113251154.pdfEIA Decision Press Notice15 Mar 2017View
NPCU LETTER_DCC-3823-2015(1)(1).pdfDecision Notification Letter to NPCU15 Mar 2017View
County Matter South Hams District Variation of i condition 3 of planning permission 94249054.pdfCommittee Report16 Nov 2016View
Application for Minerals Development M1.pdfApplication For Minerals Development M19 Dec 2015View
General Minerals planning application from GA1_FINAL.pdfGeneral Minerals Application Form GA19 Dec 2015View
Schedule A_OwnershipDetails.pdfSchedule A - Ownership Details9 Dec 2015View
01939.00008.18.DM2-1.2 Site Location Plan-A3(1).pdfVolume 1 - Chapter 2 - Site Location Plan - DM 2/114 Dec 2015View
01939.00008.18.DM2-2.0 Planning Permission Boundary-A3(1).pdfVolume 1 - Chapter 2 - Application Site and Ownership Boundaries - DM 2/214 Dec 2015View
Surface water management.pdfSurface Water Management Scheme Sheets 1 to 3 - CAB-4D-530 Issue A5 Oct 2016View
9977-0100g Overall Road Plan.pdfOverall Road Plan - 9977-0100 Rev G12 Oct 2016View
427.01939.00023.HVA.301.F0-SLR_IP_FullSize.pdfPlan & Longitudinal Sections West to East and North to South - 427.01939.00023.HVA.301 Rev F024 Oct 2016View
427.01939.00023.HVA.401.F0-SLR_IP_FullSize.pdfEmbankment Construction Stage 3.1 Onwards - 427.01939.00023.HVA.401 Rev F024 Oct 2016View
1511_R_PS Contents_FINAL.pdfVolume 1 - Planning Statement - TABLE OF CONTENTS9 Dec 2015View
1511_R_PS Sec01_Introduction_FINAL.pdfChapter 1 - Introduction9 Dec 2015View
1511_R_PS Sec02_SiteDescription_FINAL.pdfChapter 2 - Site Description9 Dec 2015View
1511_R_PS Sec03_Development_FINAL.pdfChapter 3 - Development Description9 Dec 2015View
1511_R_PS Sec04_Policy_FINAL.pdfChapter 4 - Planning Policy9 Dec 2015View
Blasting review - Reg 22 submission 161018.v02 FINAL_Redacted.pdfBlasting Review of Regulation 22 Submission v2 dated 26/10/201626 Oct 2016View
1608_DrakelandsMine_RevisedNTSPostR22_FINAL.pdfRegulation 22 Response : Revised Vol 2C - Non Technical Summary2 Sept 2016View
1608_DrakelandsMine_Reg22_FINAL.pdfRegulation 22 Response : August 20162 Sept 2016View
R22_AppA_DCC_Letter09022016.pdfRegulation 22 Response : Appendix A - Letter from DCC dated 09/02/20162 Sept 2016View
R22_AppA_DCC_Letter16032016.pdfRegulation 22 Response : Appendix A - Letter from DCC dated 16/03/20162 Sept 2016View
R22_AppB__ToryPond.pdfRegulation 22 Response : Appendix B - Lower Hooksbury Diversion Channel Details (Sheet 1 of 2) - MWP00494AE-DD-37 Rev C2 Sept 2016View
R22_AppB_asbuilt_plant_drawing.pdfRegulation 22 Response : Appendix B - Plant & Infrastructure Layout Plan - WHP-100-L-001 Rev H2 Sept 2016View
R22_AppB_asbuilt_plant_elevations.pdfRegulation 22 Response : Appendix B - Wet Plant External View Elevations - WHP-100-L-018 Rev C2 Sept 2016View
R22_AppB_DCC PROW plan.pdfRegulation 22 Response : Appendix B - DCC Public Rights of Way Plan2 Sept 2016View
R22_AppB_ES Sec01_IntroductionPost R22.pdfRegulation 22 Response : Appendix B - Chapter 1 - Introduction2 Sept 2016View
R22_AppB_ES Sec03_DevelopmentPostR22.pdfRegulation 22 Response : Appendix B - Chapter 3 - Development Description2 Sept 2016View
R22_AppB_ExistingMWF_Drainage.pdfRegulation 22 Response : Appendix B - Figure 8 (MWF Area) & Figure 9 (Tory Pond Area)2 Sept 2016View
Regulation 22 Response - Appendix B.pdfRegulation 22 Response : Appendix B - Staged Pit Depletion Schedule with 7 Day Working - NE-SW Long Section2 Sept 2016View
R22_AppB_MHughesDrawing_PlantingBlocks.pdfRegulation 22 Response : Appendix B - Environmental Development & Management Plan - MHA-21447-1, -2 & -32 Sept 2016View
R22_AppB_MWF_Final.pdfRegulation 22 Response : Appendix B - Stage 9.0 Closure Tailings at 198mAOD - 427.01939.00023.HVA.216 Rev D12 Sept 2016View
R22_AppB_MWF_Mid.pdfRegulation 22 Response : Appendix B - Stage 5.2 Construction Embankment Crest Level 190mAOD Waste Rock to 166mAOD - 427.01939.00023.HVA.210 Rev D02 Sept 2016View
R22_AppB_MWF_Present.pdfRegulation 22 Response : Appendix B - Stage 3.2 Construction Embankment Crest Level 177mAOD Waste Rock to 106mAOD North - 427.01939.00023.HVA.203 Rev D02 Sept 2016View
R22_AppB_Pit Development Plan-current position.pdfRegulation 22 Response : Appendix B - 2.5m Contours Showing Current Status of Open Pit as of July 2016 - CAB-4D-691 Issue A2 Sept 2016View
R22_AppB_Pit Development Plan-end of mine life.pdfRegulation 22 Response : Appendix B - 2.5m Contours Showing Final Extent of Open Pit - CAB-4D-689 Issue A2 Sept 2016View
R22_AppB_Pit Development Plan-June 2021.pdfRegulation 22 Response : Appendix B - 2.5m Contours as at June 2021 - CAB-4D-690 Issue A2 Sept 2016View
R22_AppB_SmallhangerPond.pdfRegulation 22 Response : Appendix B - Smallhanger Pond and Pump Location Arrangement Plan & Elevation - WHP-391-L-004 Rev A2 Sept 2016View
R22_AppC_ES_Chp12_Noise.pdfRegulation 22 Response : Appendix C - Chapter 12 - Noise2 Sept 2016View
R22_AppC_ES_Chp12_Appendix_12-6_1.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Daytime Noise Levels for Existing Plant - App 12/6-12 Sept 2016View
R22_AppC_ES_Chp12_Appendix_12-6_2.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Daytime Noise Levels for Proposed Plant - App 12/6-22 Sept 2016View
R22_AppC_ES_Chp12_Appendix_12-6_3.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Night-time Noise Levels - App 12/6-32 Sept 2016View
R22_AppC_ES_Chp13_LFN.pdfRegulation 22 Response : Appendix C - Chapter 13 - Low Frequency Noise2 Sept 2016View
R22_AppD_ES_Chp14_Blasting.pdfRegulation 22 Response : Appendix D - Chapter 14 - Vibration2 Sept 2016View
R22_AppD_ES_Chp14_Appendix14-1.pdfRegulation 22 Response : Appendix D - Chapter 14 - Electronic Initiation Trial - Stage 1 Interim Report - App 14/12 Sept 2016View
R22_AppD_ES_Chp14_Appendix14-2.pdfRegulation 22 Response : Appendix D - Chapter 14 - Blast Impact Minimisation Strategy - App 14/22 Sept 2016View
R22_AppE_Tech_Note_E.pdfRegulation 22 Response : Appendix E - Technical Note E2 Sept 2016View
R22_AppE_Tech_Note_F.pdfRegulation 22 Response : Appendix E - Technical Note F2 Sept 2016View
R22_AppE_Tech_Note_G.pdfRegulation 22 Response : Appendix E - Technical Note G2 Sept 2016View
R22_AppE_Tech_Note_H.pdfRegulation 22 Response : Appendix E - Technical Note H2 Sept 2016View
R22_AppF_Plant_Shutdown_note.pdfRegulation 22 Response : Appendix F - Implications of Night-time Shutdown2 Sept 2016View
R22_AppG_Dust_and_airquality_scheme.pdfRegulation 22 Response : Appendix G - Dust and Air Quality2 Sept 2016View
R22-AppC_ES_Chp13_Appendix13-4(1).pdfRegulation 22 Response : Appendix C - Chapter 13 - BRE Client Report5 Sept 2016View
Wolf REG22 Blast Report_Addendum.pdfRegulation 22 Response : Blasting Report Addendum Received 20/09/201617 Oct 2016View
1511_R_ES Contents_FINAL.pdfVolume 2A - Environmental Statement - TABLE OF CONTENTS9 Dec 2015View
1511_R_ES Sec01_Introduction_FINAL.pdfChapter 1 - Introduction9 Dec 2015View
1511_R_ES Sec02_SiteDescription_FINAL.pdfChapter 2 - Site Description9 Dec 2015View
01939.00008.18.DM2-1.2 Site Location Plan-A3.pdfChapter 2 - Site Location Plan - DM 2/19 Dec 2015View
01939.00008.18.DM2-2.0 Planning Permission Boundary-A3.pdfChapter 2 - Application Site and Ownership Boundaries - DM 2/29 Dec 2015View
1511_R_ES Sec03_Development_FINAL.pdfChapter 3 - Development Description9 Dec 2015View
1511_R_ES Sec04_Policy_FINAL.pdfChapter 4 - Planning Policy9 Dec 2015View
1511_R_ES Sec05_Alternatives_FINAL.pdfChapter 5 - Alternatives9 Dec 2015View
1511_R_ES Sec06_AQ_FINAL.pdfChapter 6 - Air Quality9 Dec 2015View
01939.00008.18.DM6-1.0 Air Quality Receptors-A3.pdfChapter 6 - Air Quality Receptors DM 6/19 Dec 2015View
1511_R_ES Sec07_LVIA_FINAL.pdfChapter 7 - Landscape and Visual9 Dec 2015View
01939.00022.29.7-1_SM_Layout1.pdfChapter 7 - Cumulative Plan - DM 7/110 Dec 2015View
01939.00022.29.7-2_SM_Layout1.pdfChapter 7 - ZTV of Anticipated Extraction Void in 2021 - DM 7/210 Dec 2015View
01939.00022.29.7-3_SM_Layout1.pdfChapter 7 - ZTV of Anticipated Tip Landform in 2021 - DM 7/310 Dec 2015View
01939.00022.29.7-4_SM_Layout1.pdfChapter 7 - ZTV of Extraction Void in 2036 - DM 7/410 Dec 2015View
01939.00022.29.7-5_SM_Layout1.pdfChapter 7 - ZTV of Tip Restoration Landform in 2036 - DM 7/510 Dec 2015View
01939.00022.29_7-17_TO_7-27_SM.pdfChapter 7 - Viewpoints - DM 7/17 to 7/2710 Dec 2015View
01939.00022.29_7-6_TO_7-16_SM.pdfChapter 7 - Viewpoints - DM 7/6 to 7/1610 Dec 2015View
1511_R_ES Sec08_Ecology_FINAL.pdfChapter 8 - Ecology10 Dec 2015View
1511_R_ES Sec09_Water_FINAL.pdfChapter 9 - Water Environment10 Dec 2015View
1511_R_ES Sec10_OtherTopics_FINAL.pdfChapter 10 - Other Environmental Topics10 Dec 2015View
1511_R_ES Sec11_CumulativeImpacts_FINAL.pdfChapter 11 - Cumulative Impacts10 Dec 2015View
1511_R_NTS_FINAL.pdfVolume 2C - Non-Technical Summary10 Dec 2015View
Appendix 2-1.pdfChapter 2 - Appendix 2/1 - Aerial Photograph10 Dec 2015View
Appendix 3-1a_visualisation of Approved-Proposed Plant-A3.pdfChapter 3 - Appendix 3/1a - 3D Visualisation of Approved/Proposed Plant - DM 3/110 Dec 2015View
Appendix 3-1b_Drawing WHP100L001_E.pdfChapter 3 - Appendix 3/1b - Plant & Infrastructure Layout Plan - WHP 100-L-001 Rev E10 Dec 2015View
Appendix 3-1c_Drawing WHP100L002_E.pdfChapter 3 - Appendix 3/1c - Plant & Infrastructure Layout Elevations - WHP 100-L-002 Rev E10 Dec 2015View
Appendix 3-2 AMAX MWF Scheme.pdfChapter 3 - Appendix 3/2 - AMAX Figures 2.1 to 2.5 (MWF)10 Dec 2015View
Appendix 3-3 restoration concept plans.pdfChapter 3 - Appendix 3/3 - Restoration Concept Plans - 16349-2 to 16349-610 Dec 2015View
List of Appendices.pdfVolume 2B - Environmental Statement Appendices - LIST OF APPENDICES10 Dec 2015View
Appendix 6-1_FINAL.pdfChapter 6 - Appendix 6/1 - Critical Load Ranges and Functions10 Dec 2015View
Appendix 6-2_FINAL.pdfChapter 6 - Appendix 6/2 - H1 Screening for Point Sources10 Dec 2015View
Appendix 6-3_FINAL.pdfChapter 6 - Appendix 6/3 - Dispersion Modelling, Source Term and Habitats Assessment10 Dec 2015View
Appendix 6-4_FINAL.pdfChapter 6 - Appendix 6/4 - Dispersion Modelling Results10 Dec 2015View
Appendix 6-5_FINAL.pdfChapter 6 - Appendix 6/5 - Dispersion Modelling Figures10 Dec 2015View
Appendix 7-1.pdfChapter 7 - Appendix 7/1 - Criteria for Assessing Sensitivity and Magnitude of Change10 Dec 2015View
Appendix 7-2.pdfChapter 7 - Appendix 7/2 - Landscape Planning Policies10 Dec 2015View
Appendix 7-3.pdfChapter 7 - Appendix 7/3 - Published Landscape Character Assessments10 Dec 2015View
Appendix 7-4.pdfChapter 7 - Appendix 7/4 - Method Statement for ZTVS10 Dec 2015View
Appendix 7-5.pdfChapter 7 - Appendix 7/5 - Individual Viewpoint Assessment10 Dec 2015View
Appendix 8.1 Annual Report 2014-15 (excl. Appendices).pdfChapter 8 - Appendix 8/1 - Environmental Development Management Plan - Annual Report April 2014 - March 201510 Dec 2015View
Appendix 8.2_Desk Study.pdfChapter 8 - Appendix 8/2 - Desk Study from Devon Biodiversity Records Centre10 Dec 2015View
Appendix 8.3_Appendices 1-11.pdfChapter 8 - Appendix 8/3 - Ecological Site Investigations (Technical Appendices)10 Dec 2015View
Appendix 8.3_ESI report.pdfChapter 8 - Appendix 8/3 - Ecological Site Investigations (Report)10 Dec 2015View
Appendix 8.4_Restoration Concept.pdfChapter 8 - Appendix 8/4 - Ecological Work Completed and Required10 Dec 2015View
Appendix 8.5_Compensation Schedule.pdfChapter 8 - Appendix 8/5 - Ecology Compensation Schedule10 Dec 2015View
Appendix 8.6_EDMP.pdfChapter 8 - Appendix 8/6 - Environmental Development and Management Plan10 Dec 2015View
Appendix 8.7_Unilateral Undertaking - Tree Planting Scheme.pdfChapter 8 - Appendix 8/7 - Unilateral Undertaking Tree Planting Scheme10 Dec 2015View
Technical Notes A - C.pdfChapter 9 - Appendix 9/1 - Technical Notes A - C10 Dec 2015View
Technical Note D.pdfChapter 9 - Appendix 9/1 - Technical Note D10 Dec 2015View
Appendix 1-1 Scoping Opinion Last 5.6.15_Redacted.pdfChapter 1 - Appendix 1/1 - Scoping Opinion of Devon County Council10 Dec 2015View
One Off Letter (CM or CCD)_DCC-3823-2015 (3)(1).pdfRegulation 22 Request for Further Environmental Information dated 09/02/169 Feb 2016View
One Off Letter (CM or CCD)_DCC-3823-2015.pdfLetter to Agent dated 26 January 201615 Feb 2016View
161102_403.01939.00022_L_SP(DCC)_noise_issue(1).pdfSLR Response to MAS Noise Report 02/11/20163 Nov 2016View
ARTICLE 27 COVER LETTER (DETERMINATION OF CONDITIONS)_DCC-3823-2015(2)(1).pdfLetter to Wolf Minerals concerning Discharge of Noise Conditions (dated 30/06/17)3 Jul 2017View
174156_Drakelands Mine_extension of time to operate_Hemerdon_Plymouth.pdfNatural England Response dated 11/01/1612 Jan 2016View
DCC Highways Response.pdfDCC Highways Response dated 11/12/1513 Jan 2016View
Historic England Response.pdfHistoric England Response dated 13/01/1615 Jan 2016View
PlanningProposal.pdfEnvironment Agency Response dated 14/01/1615 Jan 2016View
DCC Historic Environment Response.pdfDCC Historic Environment Response dated 07/01/1619 Jan 2016View
RESPONSE FOR DCC on Hemerdon Mine.pdfSouth Hams District Council Environmental Health Response dated 20/01/1622 Jan 2016View
WOLF EXTENDED TIMESCALE TO JUNE 2036(1).pdfSparkwell Parish Council Response dated 10/02/1611 Feb 2016View
Shaugh Prior Parish Council Response.pdfShaugh Prior Parish Council Response dated 21/02/1625 Feb 2016View
NATIONAL_GRID_XX_TW_Z4_3NWP_005993_1_3640.pdfNational Grid Response 08/09/20169 Sept 2016View
Drakelands.pdfNatural England Response 16/09/1616 Sept 2016View
Plymouth City Council Response.pdfPlymouth City Council Response 23/09/201627 Sept 2016View
PlanningProposal(2)(1).pdfEnvironment Agency Response 26/09/201627 Sept 2016View
XX_TW_Z4_3NWP_005993.pdfNational Grid Response dated 06/10/20167 Oct 2016View
DCC-3823-2015 Regulation 22 Submission.pdfShaugh Prior Parish Council Response 18/10/201619 Oct 2016View
EA Response.pdfEnvironment Agency Response 13/10/201619 Oct 2016View
SPC Response to DCC - 22.10.16.pdfSparkwell Parish Council Response 22/10/201624 Oct 2016View
RESPONSE FOR DCC on Hemerdon Mine 1.11.pdfSouth Hams Environmental Health Response 03/11/20163 Nov 2016View
DCC.3823.2015.pdfDCC Flood Risk Response 31/10/20163 Nov 2016View
Letter re Drakelands Mine Response from VP 09.11.16(1).pdfDirector of Public Health Response 09/11/201610 Nov 2016View
PlanningProposal(2).pdfEnvironment Agency Response (Discharge of Condition) 13/09/1714 Sept 2017View
Blast Impact Minimisation and Monitoring Scheme.pdfCondition 13 - Blast Impact Minimisation and Monitoring Scheme15 Mar 2017View
Dust Assessment final.pdfDust Assessment final.pdf19 May 2017View
Travel Plan 2017 Final signed version.pdfTravel Plan 2017 Final signed version.pdf19 May 2017View
tree planting scheme final.pdfTree Planting Scheme final.pdf19 May 2017View
The Hemerdon ProjectAFDjune17 (003) final.pdfCondition 16 - Archaeological Framework Document (June 2017)1 Aug 2017View
Lighting scheme 2017 final.pdfCondition 21 - Lighting Scheme 201717 Aug 2017View
scheme required by condition 17 ii_.pdfCondition 17 (ii) - Scheme for Augmentation of Flow in Smallhanger Brook23 Aug 2017View
Scheme required by condition 17 iii(1).pdfCondition 17 (iii) - Detailed Surface Water & Flood Mitigation & Management Scheme23 Aug 2017View
Noise Management Plan - Phase 2 FINAL.pdfCondition 7 - Noise Management Plan for Phase 215 Mar 2017View
170531_422 Noise Scheme Phase 2_FINAL May revision.pdfCondition 7 - Noise Scheme Phase 2 (May 2017) Revision31 May 2017View
Noise Scheme_FINAL.pdfCondition 6 - Noise Scheme (May 2017)31 May 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Committee Date

    Published milestoneCouncil source
  5. Decision Date

    Published milestoneCouncil source
  6. Issue Date

    Published milestoneCouncil source

Decision & conditions

Conditional Approval
20170216134736552.pdf 20170315113251154.pdf NPCU LETTER_DCC-3823-2015(1)(1).pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.