Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Drakelands (previously Hemerdon) Mine, Drakelands, Nr PLYMOUTH, Devon PL7 5BS
Last published check: 21 Sept 2026, 10:37. Check the council record for more recent changes.
Drakelands (previously Hemerdon) Mine, Drakelands, Nr PLYMOUTH, Devon PL7 5BS
This record has no verified map location.
Variation of (i) condition 3 of planning permission 9/42/49/0542/85/3 to allow the continued extraction of tungsten and tin, processing and disposal of mineral wastes until 5 June 2036 and (ii) removal of condition 13 of planning permission 9/42/49/0542/85/3 to remove the restriction on the operatin...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| 20170216134736552.pdfSigned Decision Notice pdf | 16 Feb 2017 | View |
| Document1(2).pdfRegulation 24 Statement | 15 Mar 2017 | View |
| 20170315113251154.pdfEIA Decision Press Notice | 15 Mar 2017 | View |
| NPCU LETTER_DCC-3823-2015(1)(1).pdfDecision Notification Letter to NPCU | 15 Mar 2017 | View |
| County Matter South Hams District Variation of i condition 3 of planning permission 94249054.pdfCommittee Report | 16 Nov 2016 | View |
| Application for Minerals Development M1.pdfApplication For Minerals Development M1 | 9 Dec 2015 | View |
| General Minerals planning application from GA1_FINAL.pdfGeneral Minerals Application Form GA1 | 9 Dec 2015 | View |
| Schedule A_OwnershipDetails.pdfSchedule A - Ownership Details | 9 Dec 2015 | View |
| 01939.00008.18.DM2-1.2 Site Location Plan-A3(1).pdfVolume 1 - Chapter 2 - Site Location Plan - DM 2/1 | 14 Dec 2015 | View |
| 01939.00008.18.DM2-2.0 Planning Permission Boundary-A3(1).pdfVolume 1 - Chapter 2 - Application Site and Ownership Boundaries - DM 2/2 | 14 Dec 2015 | View |
| Surface water management.pdfSurface Water Management Scheme Sheets 1 to 3 - CAB-4D-530 Issue A | 5 Oct 2016 | View |
| 9977-0100g Overall Road Plan.pdfOverall Road Plan - 9977-0100 Rev G | 12 Oct 2016 | View |
| 427.01939.00023.HVA.301.F0-SLR_IP_FullSize.pdfPlan & Longitudinal Sections West to East and North to South - 427.01939.00023.HVA.301 Rev F0 | 24 Oct 2016 | View |
| 427.01939.00023.HVA.401.F0-SLR_IP_FullSize.pdfEmbankment Construction Stage 3.1 Onwards - 427.01939.00023.HVA.401 Rev F0 | 24 Oct 2016 | View |
| 1511_R_PS Contents_FINAL.pdfVolume 1 - Planning Statement - TABLE OF CONTENTS | 9 Dec 2015 | View |
| 1511_R_PS Sec01_Introduction_FINAL.pdfChapter 1 - Introduction | 9 Dec 2015 | View |
| 1511_R_PS Sec02_SiteDescription_FINAL.pdfChapter 2 - Site Description | 9 Dec 2015 | View |
| 1511_R_PS Sec03_Development_FINAL.pdfChapter 3 - Development Description | 9 Dec 2015 | View |
| 1511_R_PS Sec04_Policy_FINAL.pdfChapter 4 - Planning Policy | 9 Dec 2015 | View |
| Blasting review - Reg 22 submission 161018.v02 FINAL_Redacted.pdfBlasting Review of Regulation 22 Submission v2 dated 26/10/2016 | 26 Oct 2016 | View |
| 1608_DrakelandsMine_RevisedNTSPostR22_FINAL.pdfRegulation 22 Response : Revised Vol 2C - Non Technical Summary | 2 Sept 2016 | View |
| 1608_DrakelandsMine_Reg22_FINAL.pdfRegulation 22 Response : August 2016 | 2 Sept 2016 | View |
| R22_AppA_DCC_Letter09022016.pdfRegulation 22 Response : Appendix A - Letter from DCC dated 09/02/2016 | 2 Sept 2016 | View |
| R22_AppA_DCC_Letter16032016.pdfRegulation 22 Response : Appendix A - Letter from DCC dated 16/03/2016 | 2 Sept 2016 | View |
| R22_AppB__ToryPond.pdfRegulation 22 Response : Appendix B - Lower Hooksbury Diversion Channel Details (Sheet 1 of 2) - MWP00494AE-DD-37 Rev C | 2 Sept 2016 | View |
| R22_AppB_asbuilt_plant_drawing.pdfRegulation 22 Response : Appendix B - Plant & Infrastructure Layout Plan - WHP-100-L-001 Rev H | 2 Sept 2016 | View |
| R22_AppB_asbuilt_plant_elevations.pdfRegulation 22 Response : Appendix B - Wet Plant External View Elevations - WHP-100-L-018 Rev C | 2 Sept 2016 | View |
| R22_AppB_DCC PROW plan.pdfRegulation 22 Response : Appendix B - DCC Public Rights of Way Plan | 2 Sept 2016 | View |
| R22_AppB_ES Sec01_IntroductionPost R22.pdfRegulation 22 Response : Appendix B - Chapter 1 - Introduction | 2 Sept 2016 | View |
| R22_AppB_ES Sec03_DevelopmentPostR22.pdfRegulation 22 Response : Appendix B - Chapter 3 - Development Description | 2 Sept 2016 | View |
| R22_AppB_ExistingMWF_Drainage.pdfRegulation 22 Response : Appendix B - Figure 8 (MWF Area) & Figure 9 (Tory Pond Area) | 2 Sept 2016 | View |
| Regulation 22 Response - Appendix B.pdfRegulation 22 Response : Appendix B - Staged Pit Depletion Schedule with 7 Day Working - NE-SW Long Section | 2 Sept 2016 | View |
| R22_AppB_MHughesDrawing_PlantingBlocks.pdfRegulation 22 Response : Appendix B - Environmental Development & Management Plan - MHA-21447-1, -2 & -3 | 2 Sept 2016 | View |
| R22_AppB_MWF_Final.pdfRegulation 22 Response : Appendix B - Stage 9.0 Closure Tailings at 198mAOD - 427.01939.00023.HVA.216 Rev D1 | 2 Sept 2016 | View |
| R22_AppB_MWF_Mid.pdfRegulation 22 Response : Appendix B - Stage 5.2 Construction Embankment Crest Level 190mAOD Waste Rock to 166mAOD - 427.01939.00023.HVA.210 Rev D0 | 2 Sept 2016 | View |
| R22_AppB_MWF_Present.pdfRegulation 22 Response : Appendix B - Stage 3.2 Construction Embankment Crest Level 177mAOD Waste Rock to 106mAOD North - 427.01939.00023.HVA.203 Rev D0 | 2 Sept 2016 | View |
| R22_AppB_Pit Development Plan-current position.pdfRegulation 22 Response : Appendix B - 2.5m Contours Showing Current Status of Open Pit as of July 2016 - CAB-4D-691 Issue A | 2 Sept 2016 | View |
| R22_AppB_Pit Development Plan-end of mine life.pdfRegulation 22 Response : Appendix B - 2.5m Contours Showing Final Extent of Open Pit - CAB-4D-689 Issue A | 2 Sept 2016 | View |
| R22_AppB_Pit Development Plan-June 2021.pdfRegulation 22 Response : Appendix B - 2.5m Contours as at June 2021 - CAB-4D-690 Issue A | 2 Sept 2016 | View |
| R22_AppB_SmallhangerPond.pdfRegulation 22 Response : Appendix B - Smallhanger Pond and Pump Location Arrangement Plan & Elevation - WHP-391-L-004 Rev A | 2 Sept 2016 | View |
| R22_AppC_ES_Chp12_Noise.pdfRegulation 22 Response : Appendix C - Chapter 12 - Noise | 2 Sept 2016 | View |
| R22_AppC_ES_Chp12_Appendix_12-6_1.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Daytime Noise Levels for Existing Plant - App 12/6-1 | 2 Sept 2016 | View |
| R22_AppC_ES_Chp12_Appendix_12-6_2.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Daytime Noise Levels for Proposed Plant - App 12/6-2 | 2 Sept 2016 | View |
| R22_AppC_ES_Chp12_Appendix_12-6_3.pdfRegulation 22 Response : Appendix C - Chapter 12 - Predicted Night-time Noise Levels - App 12/6-3 | 2 Sept 2016 | View |
| R22_AppC_ES_Chp13_LFN.pdfRegulation 22 Response : Appendix C - Chapter 13 - Low Frequency Noise | 2 Sept 2016 | View |
| R22_AppD_ES_Chp14_Blasting.pdfRegulation 22 Response : Appendix D - Chapter 14 - Vibration | 2 Sept 2016 | View |
| R22_AppD_ES_Chp14_Appendix14-1.pdfRegulation 22 Response : Appendix D - Chapter 14 - Electronic Initiation Trial - Stage 1 Interim Report - App 14/1 | 2 Sept 2016 | View |
| R22_AppD_ES_Chp14_Appendix14-2.pdfRegulation 22 Response : Appendix D - Chapter 14 - Blast Impact Minimisation Strategy - App 14/2 | 2 Sept 2016 | View |
| R22_AppE_Tech_Note_E.pdfRegulation 22 Response : Appendix E - Technical Note E | 2 Sept 2016 | View |
| R22_AppE_Tech_Note_F.pdfRegulation 22 Response : Appendix E - Technical Note F | 2 Sept 2016 | View |
| R22_AppE_Tech_Note_G.pdfRegulation 22 Response : Appendix E - Technical Note G | 2 Sept 2016 | View |
| R22_AppE_Tech_Note_H.pdfRegulation 22 Response : Appendix E - Technical Note H | 2 Sept 2016 | View |
| R22_AppF_Plant_Shutdown_note.pdfRegulation 22 Response : Appendix F - Implications of Night-time Shutdown | 2 Sept 2016 | View |
| R22_AppG_Dust_and_airquality_scheme.pdfRegulation 22 Response : Appendix G - Dust and Air Quality | 2 Sept 2016 | View |
| R22-AppC_ES_Chp13_Appendix13-4(1).pdfRegulation 22 Response : Appendix C - Chapter 13 - BRE Client Report | 5 Sept 2016 | View |
| Wolf REG22 Blast Report_Addendum.pdfRegulation 22 Response : Blasting Report Addendum Received 20/09/2016 | 17 Oct 2016 | View |
| 1511_R_ES Contents_FINAL.pdfVolume 2A - Environmental Statement - TABLE OF CONTENTS | 9 Dec 2015 | View |
| 1511_R_ES Sec01_Introduction_FINAL.pdfChapter 1 - Introduction | 9 Dec 2015 | View |
| 1511_R_ES Sec02_SiteDescription_FINAL.pdfChapter 2 - Site Description | 9 Dec 2015 | View |
| 01939.00008.18.DM2-1.2 Site Location Plan-A3.pdfChapter 2 - Site Location Plan - DM 2/1 | 9 Dec 2015 | View |
| 01939.00008.18.DM2-2.0 Planning Permission Boundary-A3.pdfChapter 2 - Application Site and Ownership Boundaries - DM 2/2 | 9 Dec 2015 | View |
| 1511_R_ES Sec03_Development_FINAL.pdfChapter 3 - Development Description | 9 Dec 2015 | View |
| 1511_R_ES Sec04_Policy_FINAL.pdfChapter 4 - Planning Policy | 9 Dec 2015 | View |
| 1511_R_ES Sec05_Alternatives_FINAL.pdfChapter 5 - Alternatives | 9 Dec 2015 | View |
| 1511_R_ES Sec06_AQ_FINAL.pdfChapter 6 - Air Quality | 9 Dec 2015 | View |
| 01939.00008.18.DM6-1.0 Air Quality Receptors-A3.pdfChapter 6 - Air Quality Receptors DM 6/1 | 9 Dec 2015 | View |
| 1511_R_ES Sec07_LVIA_FINAL.pdfChapter 7 - Landscape and Visual | 9 Dec 2015 | View |
| 01939.00022.29.7-1_SM_Layout1.pdfChapter 7 - Cumulative Plan - DM 7/1 | 10 Dec 2015 | View |
| 01939.00022.29.7-2_SM_Layout1.pdfChapter 7 - ZTV of Anticipated Extraction Void in 2021 - DM 7/2 | 10 Dec 2015 | View |
| 01939.00022.29.7-3_SM_Layout1.pdfChapter 7 - ZTV of Anticipated Tip Landform in 2021 - DM 7/3 | 10 Dec 2015 | View |
| 01939.00022.29.7-4_SM_Layout1.pdfChapter 7 - ZTV of Extraction Void in 2036 - DM 7/4 | 10 Dec 2015 | View |
| 01939.00022.29.7-5_SM_Layout1.pdfChapter 7 - ZTV of Tip Restoration Landform in 2036 - DM 7/5 | 10 Dec 2015 | View |
| 01939.00022.29_7-17_TO_7-27_SM.pdfChapter 7 - Viewpoints - DM 7/17 to 7/27 | 10 Dec 2015 | View |
| 01939.00022.29_7-6_TO_7-16_SM.pdfChapter 7 - Viewpoints - DM 7/6 to 7/16 | 10 Dec 2015 | View |
| 1511_R_ES Sec08_Ecology_FINAL.pdfChapter 8 - Ecology | 10 Dec 2015 | View |
| 1511_R_ES Sec09_Water_FINAL.pdfChapter 9 - Water Environment | 10 Dec 2015 | View |
| 1511_R_ES Sec10_OtherTopics_FINAL.pdfChapter 10 - Other Environmental Topics | 10 Dec 2015 | View |
| 1511_R_ES Sec11_CumulativeImpacts_FINAL.pdfChapter 11 - Cumulative Impacts | 10 Dec 2015 | View |
| 1511_R_NTS_FINAL.pdfVolume 2C - Non-Technical Summary | 10 Dec 2015 | View |
| Appendix 2-1.pdfChapter 2 - Appendix 2/1 - Aerial Photograph | 10 Dec 2015 | View |
| Appendix 3-1a_visualisation of Approved-Proposed Plant-A3.pdfChapter 3 - Appendix 3/1a - 3D Visualisation of Approved/Proposed Plant - DM 3/1 | 10 Dec 2015 | View |
| Appendix 3-1b_Drawing WHP100L001_E.pdfChapter 3 - Appendix 3/1b - Plant & Infrastructure Layout Plan - WHP 100-L-001 Rev E | 10 Dec 2015 | View |
| Appendix 3-1c_Drawing WHP100L002_E.pdfChapter 3 - Appendix 3/1c - Plant & Infrastructure Layout Elevations - WHP 100-L-002 Rev E | 10 Dec 2015 | View |
| Appendix 3-2 AMAX MWF Scheme.pdfChapter 3 - Appendix 3/2 - AMAX Figures 2.1 to 2.5 (MWF) | 10 Dec 2015 | View |
| Appendix 3-3 restoration concept plans.pdfChapter 3 - Appendix 3/3 - Restoration Concept Plans - 16349-2 to 16349-6 | 10 Dec 2015 | View |
| List of Appendices.pdfVolume 2B - Environmental Statement Appendices - LIST OF APPENDICES | 10 Dec 2015 | View |
| Appendix 6-1_FINAL.pdfChapter 6 - Appendix 6/1 - Critical Load Ranges and Functions | 10 Dec 2015 | View |
| Appendix 6-2_FINAL.pdfChapter 6 - Appendix 6/2 - H1 Screening for Point Sources | 10 Dec 2015 | View |
| Appendix 6-3_FINAL.pdfChapter 6 - Appendix 6/3 - Dispersion Modelling, Source Term and Habitats Assessment | 10 Dec 2015 | View |
| Appendix 6-4_FINAL.pdfChapter 6 - Appendix 6/4 - Dispersion Modelling Results | 10 Dec 2015 | View |
| Appendix 6-5_FINAL.pdfChapter 6 - Appendix 6/5 - Dispersion Modelling Figures | 10 Dec 2015 | View |
| Appendix 7-1.pdfChapter 7 - Appendix 7/1 - Criteria for Assessing Sensitivity and Magnitude of Change | 10 Dec 2015 | View |
| Appendix 7-2.pdfChapter 7 - Appendix 7/2 - Landscape Planning Policies | 10 Dec 2015 | View |
| Appendix 7-3.pdfChapter 7 - Appendix 7/3 - Published Landscape Character Assessments | 10 Dec 2015 | View |
| Appendix 7-4.pdfChapter 7 - Appendix 7/4 - Method Statement for ZTVS | 10 Dec 2015 | View |
| Appendix 7-5.pdfChapter 7 - Appendix 7/5 - Individual Viewpoint Assessment | 10 Dec 2015 | View |
| Appendix 8.1 Annual Report 2014-15 (excl. Appendices).pdfChapter 8 - Appendix 8/1 - Environmental Development Management Plan - Annual Report April 2014 - March 2015 | 10 Dec 2015 | View |
| Appendix 8.2_Desk Study.pdfChapter 8 - Appendix 8/2 - Desk Study from Devon Biodiversity Records Centre | 10 Dec 2015 | View |
| Appendix 8.3_Appendices 1-11.pdfChapter 8 - Appendix 8/3 - Ecological Site Investigations (Technical Appendices) | 10 Dec 2015 | View |
| Appendix 8.3_ESI report.pdfChapter 8 - Appendix 8/3 - Ecological Site Investigations (Report) | 10 Dec 2015 | View |
| Appendix 8.4_Restoration Concept.pdfChapter 8 - Appendix 8/4 - Ecological Work Completed and Required | 10 Dec 2015 | View |
| Appendix 8.5_Compensation Schedule.pdfChapter 8 - Appendix 8/5 - Ecology Compensation Schedule | 10 Dec 2015 | View |
| Appendix 8.6_EDMP.pdfChapter 8 - Appendix 8/6 - Environmental Development and Management Plan | 10 Dec 2015 | View |
| Appendix 8.7_Unilateral Undertaking - Tree Planting Scheme.pdfChapter 8 - Appendix 8/7 - Unilateral Undertaking Tree Planting Scheme | 10 Dec 2015 | View |
| Technical Notes A - C.pdfChapter 9 - Appendix 9/1 - Technical Notes A - C | 10 Dec 2015 | View |
| Technical Note D.pdfChapter 9 - Appendix 9/1 - Technical Note D | 10 Dec 2015 | View |
| Appendix 1-1 Scoping Opinion Last 5.6.15_Redacted.pdfChapter 1 - Appendix 1/1 - Scoping Opinion of Devon County Council | 10 Dec 2015 | View |
| One Off Letter (CM or CCD)_DCC-3823-2015 (3)(1).pdfRegulation 22 Request for Further Environmental Information dated 09/02/16 | 9 Feb 2016 | View |
| One Off Letter (CM or CCD)_DCC-3823-2015.pdfLetter to Agent dated 26 January 2016 | 15 Feb 2016 | View |
| 161102_403.01939.00022_L_SP(DCC)_noise_issue(1).pdfSLR Response to MAS Noise Report 02/11/2016 | 3 Nov 2016 | View |
| ARTICLE 27 COVER LETTER (DETERMINATION OF CONDITIONS)_DCC-3823-2015(2)(1).pdfLetter to Wolf Minerals concerning Discharge of Noise Conditions (dated 30/06/17) | 3 Jul 2017 | View |
| 174156_Drakelands Mine_extension of time to operate_Hemerdon_Plymouth.pdfNatural England Response dated 11/01/16 | 12 Jan 2016 | View |
| DCC Highways Response.pdfDCC Highways Response dated 11/12/15 | 13 Jan 2016 | View |
| Historic England Response.pdfHistoric England Response dated 13/01/16 | 15 Jan 2016 | View |
| PlanningProposal.pdfEnvironment Agency Response dated 14/01/16 | 15 Jan 2016 | View |
| DCC Historic Environment Response.pdfDCC Historic Environment Response dated 07/01/16 | 19 Jan 2016 | View |
| RESPONSE FOR DCC on Hemerdon Mine.pdfSouth Hams District Council Environmental Health Response dated 20/01/16 | 22 Jan 2016 | View |
| WOLF EXTENDED TIMESCALE TO JUNE 2036(1).pdfSparkwell Parish Council Response dated 10/02/16 | 11 Feb 2016 | View |
| Shaugh Prior Parish Council Response.pdfShaugh Prior Parish Council Response dated 21/02/16 | 25 Feb 2016 | View |
| NATIONAL_GRID_XX_TW_Z4_3NWP_005993_1_3640.pdfNational Grid Response 08/09/2016 | 9 Sept 2016 | View |
| Drakelands.pdfNatural England Response 16/09/16 | 16 Sept 2016 | View |
| Plymouth City Council Response.pdfPlymouth City Council Response 23/09/2016 | 27 Sept 2016 | View |
| PlanningProposal(2)(1).pdfEnvironment Agency Response 26/09/2016 | 27 Sept 2016 | View |
| XX_TW_Z4_3NWP_005993.pdfNational Grid Response dated 06/10/2016 | 7 Oct 2016 | View |
| DCC-3823-2015 Regulation 22 Submission.pdfShaugh Prior Parish Council Response 18/10/2016 | 19 Oct 2016 | View |
| EA Response.pdfEnvironment Agency Response 13/10/2016 | 19 Oct 2016 | View |
| SPC Response to DCC - 22.10.16.pdfSparkwell Parish Council Response 22/10/2016 | 24 Oct 2016 | View |
| RESPONSE FOR DCC on Hemerdon Mine 1.11.pdfSouth Hams Environmental Health Response 03/11/2016 | 3 Nov 2016 | View |
| DCC.3823.2015.pdfDCC Flood Risk Response 31/10/2016 | 3 Nov 2016 | View |
| Letter re Drakelands Mine Response from VP 09.11.16(1).pdfDirector of Public Health Response 09/11/2016 | 10 Nov 2016 | View |
| PlanningProposal(2).pdfEnvironment Agency Response (Discharge of Condition) 13/09/17 | 14 Sept 2017 | View |
| Blast Impact Minimisation and Monitoring Scheme.pdfCondition 13 - Blast Impact Minimisation and Monitoring Scheme | 15 Mar 2017 | View |
| Dust Assessment final.pdfDust Assessment final.pdf | 19 May 2017 | View |
| Travel Plan 2017 Final signed version.pdfTravel Plan 2017 Final signed version.pdf | 19 May 2017 | View |
| tree planting scheme final.pdfTree Planting Scheme final.pdf | 19 May 2017 | View |
| The Hemerdon ProjectAFDjune17 (003) final.pdfCondition 16 - Archaeological Framework Document (June 2017) | 1 Aug 2017 | View |
| Lighting scheme 2017 final.pdfCondition 21 - Lighting Scheme 2017 | 17 Aug 2017 | View |
| scheme required by condition 17 ii_.pdfCondition 17 (ii) - Scheme for Augmentation of Flow in Smallhanger Brook | 23 Aug 2017 | View |
| Scheme required by condition 17 iii(1).pdfCondition 17 (iii) - Detailed Surface Water & Flood Mitigation & Management Scheme | 23 Aug 2017 | View |
| Noise Management Plan - Phase 2 FINAL.pdfCondition 7 - Noise Management Plan for Phase 2 | 15 Mar 2017 | View |
| 170531_422 Noise Scheme Phase 2_FINAL May revision.pdfCondition 7 - Noise Scheme Phase 2 (May 2017) Revision | 31 May 2017 | View |
| Noise Scheme_FINAL.pdfCondition 6 - Noise Scheme (May 2017) | 31 May 2017 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read