Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Herreschoff No. 2 Calciner and Refinery, Lee Moor Refinery, Lee Moor Quarry, Shaugh Prior, Devon, PL7 5JN
Last published check: 22 Sept 2026, 01:26. Check the council record for more recent changes.
Herreschoff No. 2 Calciner and Refinery, Lee Moor Refinery, Lee Moor Quarry, Shaugh Prior, Devon, PL7 5JN
This record has no verified map location.
Re-use and adaptation of existing buildings and tanks to provide Advanced Anaerobic Digestion (AAD) Facility to process a maximum of 75,000 tonnes per annum of non hazardous Commercial and Industrial Waste; generation of renewable energy from biogas and production of restoration materials from recyc...
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| decision_42_1909_11_CM.pdfDecision Notice (Signed) | 6 Dec 2011 | View |
| pa3245-st12102-a1-1.pdfPlanning Application Boundary - st12102-a1-1 | 24 Nov 2015 | View |
| pa3245-st12102-a1-2.pdfSite Location Plan - st12102-a1-2 | 24 Nov 2015 | View |
| pa3245-st12102-019.pdfProposed Indicative Surface Water Drainage - st12102-019 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-1-h2-.pdfProposed AAD Layout (Aerial Photo Option) - sk8000-1-h2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-2-h-2.pdfProposed AAD Layout - sk8000-2-h-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-5-f-2.pdfOverall Site Layout - sk8000-5-f-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-6-b.pdfSite Pipework - sk8000-6-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-9-e.pdfSurface & Washdown Water Management - sk8000-9-e | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-10-c.pdfMain Process Building Roof Plan - sk8000-10-c | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-11-f-2.pdfMain Process Building Roof Elevations - sk8000-11-f-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-12-c.pdfAD1 Details - sk8000-12-c | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-13-b.pdfAD2 & 3 Details - sk8000-13-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-14-b.pdfDigestate Buffer Tank - imerys-sk8000-14-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-15-b.pdfDewatering & Drying Building - imerys-sk8000-15-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-16-b.pdfCentrate Treatment Plant - imerys-sk8000-16-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-17-b.pdfDried Digestate Store - imerys-sk8000-17-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-19-b.pdfCHP & Steam Generation G.A. - sk8000-19-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-20-sht2-d.pdfMain Process Building Sections - sk8000-20-sht2-d | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-20-sht1-g.pdfMain Process Building G.A. - sk8000-20-sht1-g | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-21-f-2.pdfPlan & Elevations of Proposed Digester & Dewatering Areas - sk8000-21-f-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-23-b.pdfFine Screen Building - imerys-sk8000-23-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-26-b-2.pdfSteam Boiler Plant - imerys-sk8000-26-b-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-28-b.pdfWelfare Facilities & Offices - sk8000-28-b | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-30-d-2.pdfOverall Roads & Access Track Details - sk8000-30-d-2 | 24 Nov 2015 | View |
| pa3245-dcc-planning-application.pdfApplication Form | 24 Nov 2015 | View |
| pa3245-tandcp-notice.pdfCertificate B | 24 Nov 2015 | View |
| pa3245-dcc-planning-application(1).pdfPlanning Application Form | 12 Jan 2016 | View |
| pa3245-tandcp-notice(1).pdfCertificate B | 12 Jan 2016 | View |
| pa3245-st12102-rep-001(1).pdfPlanning Statement - Text | 12 Jan 2016 | View |
| pa3245-g-4-1-284-rev-1-model-2.pdfPotential Digestate Spreading Areas - g-4-1-284-rev-1-model-2 | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-3-f.pdfScope of Lease - sk8000-3-f | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-7-c.pdfExisting Services - sk8000-7-c | 24 Nov 2015 | View |
| pa3245-imerys-sk8000-200-c.pdfBasic Flow Diagram - sk8000-200-c | 24 Nov 2015 | View |
| pa3245-st12102-a1-1(1).pdfST12102 - A1.1 Planning Application Boundary | 13 Jan 2016 | View |
| pa3245-st12102-a1-2(1).pdfST12102 - A1.2 Site Location Plan | 13 Jan 2016 | View |
| pa3245-st12102-019(1).pdfST12102-019-B - Proposed Indicative Surface Water Drainage | 13 Jan 2016 | View |
| pa3245-g-4-1-284-rev-1-model-2(1).pdfG/4/1/284-Rev-1- Lee Moor China Clay Works - Potential Digestate Spreading Areas | 13 Jan 2016 | View |
| pa3245-imerys-sk8000-1-h2-(1).pdfIMERYS-SK8000-1-H2 - Proposed AAD Layout (Aerial Photo Option) | 13 Jan 2016 | View |
| pa3245-imerys-sk8000-2-h-2(1).pdfIMERYS-SK8000-2-H - Proposed AAD Layout | 13 Jan 2016 | View |
| pa3245-imerys-sk8000-3-f(1).pdfIMERYS-SK8000-3-F - Scope of Lease | 13 Jan 2016 | View |
| pa3245-imerys-sk8000-5-f-2(1).pdfIMERYS-SK8000-5-F - Overall Site Layout | 13 Jan 2016 | View |
| pa3245-imerys-sk8000-6-b(1).pdfIMERYS-SK8000-6-B - Site Pipework | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-7-c(1).pdfIMERYS-SK8000-7-C - Existing Services | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-9-e(1).pdfIMERYS-SK8000-9-E - Surface and Washdown Water Management | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-10-c(1).pdfIMERYS-SK8000-10-C - Main Process Building Roof Plan | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-11-f-2(1).pdfIMERYS-SK8000-11-F - Main Process Building Roof Elevations | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-12-c(1).pdfIMERYS-SK8000-12-C - AD1 Details | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-13-b(1).pdfIMERYS-SK8000-13-B - AD2 and 3 Details | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-14-b(1).pdfIMERYS-SK8000-14-B - Digestate Buffer Tank | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-15-b(1).pdfIMERYS-SK8000-15-B - Dewatering and Drying Building | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-16-b(1).pdfIMERYS-SK8000-16-B - Centrate Treatment Plant | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-17-b(1).pdfIMERYS-SK8000-17-B - Dried Digestate Store | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-19-b(1).pdfIMERYS-SK8000-19-B - CHP and Stream Generation G.A | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-20-sht1-g(1).pdfIMERYS-SK8000-20-SHT1-G - Main Process Building G.A | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-20-sht2-d(1).pdfIMERYS-SK8000-20-SHT2-D - Main Process Building Sections | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-21-f-2(1).pdfIMERYS-SK8000-21-F - Plan and Elevations of Proposed Digester and Dewatering Areas | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-23-b(1).pdfIMERYS-SK8000-23-B - Fine Screen Building | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-26-b-2(1).pdfIMERYS-SK8000-26-B - Steam Boiler Plant | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-28-b(1).pdfIMERYS-SK8000-28-B - Welfare Facilities and Offices | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-30-d-2(1).pdfIMERYS-SK8000-30-D - Overall Roads and Access Track Details | 14 Jan 2016 | View |
| pa3245-imerys-sk8000-200-c(1).pdfIMERYS-SK8000-200-C - Basic Flow Diagram | 14 Jan 2016 | View |
| pa3245-a1.1.pdfA1.1 Planning Application Boundary | 20 Jan 2016 | View |
| pa3245-a1.2.pdfA1.2 Site Location | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-1-h2.pdfIMERYS-SK8000-1/H2 - Proposed AAD Layout (Aerial Photo) | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-2-h.pdfIMERYS-SK8000-2/H - Proposed AAD Layout | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-5-f.pdfIMERYS-SK8000-5/F - Overall Site Layout | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-30-d.pdfIMERYS-SK8000-30/D - Overall Roads and Access Track Details | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-11-f.pdfIMERYS-SK8000-11/F - Main Process Building Elevations | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-26-b.pdfIMERYS-SK8000-26/B - Steam Boiler Plant | 20 Jan 2016 | View |
| pa3245-imerys-sk8000-21-f.pdfIMERYS-SK8000-21/F - Plan and Elevation of Proposed Digester and Dewatering Areas | 20 Jan 2016 | View |
| pa3245-b2.1.pdfB2.1 - Water Features Survey Locations | 20 Jan 2016 | View |
| pa3245-b2.2.pdfB2.2 - Locations of Surface Water Monitoring | 20 Jan 2016 | View |
| pa3245-b4.1.pdfB4.1 - Air Quality Assessment Receptor Location Plan | 20 Jan 2016 | View |
| pa3245-b5.1.pdfB5.1 - Noise Monitoring Location Plan | 20 Jan 2016 | View |
| pa3245-b6.1.pdfB6.1 - Habitat Plan | 20 Jan 2016 | View |
| pa3245-b6.2.pdfB6.2 - Bat Activity Survey | 20 Jan 2016 | View |
| pa3245-b7.1.pdfB7.1 - Viewpoint Location Plan | 20 Jan 2016 | View |
| pa3245-b7.2.pdfB7.2 - Photomontage Location Plan | 20 Jan 2016 | View |
| pa3245-b7.3.pdfB7.3 - Viewpoint 1 | 20 Jan 2016 | View |
| pa3245-b7.4.pdfB7.4 - Viewpoint 2 | 20 Jan 2016 | View |
| pa3245-b7.5.pdfB7.5 - Viewpoint 3 | 20 Jan 2016 | View |
| pa3245-b7.6.pdfB7.6 - Viewpoint 4 | 20 Jan 2016 | View |
| pa3245-b7.7.pdfB7.7 - Viewpoint 5 | 21 Jan 2016 | View |
| pa3245-b7.8.pdfB7.8 - Viewpoint 6 | 21 Jan 2016 | View |
| pa3245-b7.9.pdfB7.9 - Viewpoint 7 | 21 Jan 2016 | View |
| pa3245-b7.10.pdfB7.10 - Viewpoint 8 | 21 Jan 2016 | View |
| pa3245-b7.11.pdfB7.11 - Viewpoint 9 | 21 Jan 2016 | View |
| pa3245-b7.12.pdfB7.12 - Viewpoint 10 | 21 Jan 2016 | View |
| pa3245-b7.13.pdfB7.13 - Viewpoint 11 | 21 Jan 2016 | View |
| pa3245-b7.14.pdfB7.14 - Viewpoint 12 | 21 Jan 2016 | View |
| pa3245-b7.15.pdfB7.15 - Viewpoint 13 | 21 Jan 2016 | View |
| pa3245-b7.16.pdfB7.16 - Photomontage 1 | 21 Jan 2016 | View |
| pa3245-b7.17.pdfB7.17 - Photomontage 2 | 21 Jan 2016 | View |
| pa3245-b7.18.pdfB7.18 - Photomontage 3 | 21 Jan 2016 | View |
| pa3245-b7.19.pdfB7.19 - Photomontage 4 | 21 Jan 2016 | View |
| pa3245-lee-moor-das.pdfDesign & Access Statement | 24 Nov 2015 | View |
| pa3245-st12102-rep-001.pdfPlanning Statement | 24 Nov 2015 | View |
| pa3245-appendix-1.pdfPlanning Statement - appendix-1 | 24 Nov 2015 | View |
| pa3245-appendix-2.pdfPlanning Statement - appendix-2 | 24 Nov 2015 | View |
| pa3245-appendix-3-part-1.pdfPlanning Statement - appendix-3-part-1 | 24 Nov 2015 | View |
| pa3245-appendix-3-part-2.pdfPlanning Statement - appendix-3-part-2 | 24 Nov 2015 | View |
| pa3245-appendix-3-part-3.pdfPlanning Statement - appendix-3-part-3 | 24 Nov 2015 | View |
| pa3245-appendix-3-part-4.pdfPlanning Statement - appendix-3-part-4 | 24 Nov 2015 | View |
| pa3245-appendix-3-part-5.pdfPlanning Statement - appendix-3-part-5 | 24 Nov 2015 | View |
| pa3245-appendix-4.pdfPlanning Statement - appendix-4 | 24 Nov 2015 | View |
| pa3245-appendix-5.pdfPlanning Statement - appendix-5 | 24 Nov 2015 | View |
| pa3245-appendix-6.pdfPlanning Statement - appendix-6 | 24 Nov 2015 | View |
| pa3245-appendix-7.pdfPlanning Statement - appendix-7 | 24 Nov 2015 | View |
| pa3245-appendix-8.pdfPlanning Statement - appendix-8 | 24 Nov 2015 | View |
| pa3245-appendix-9.pdfPlanning Statement - appendix-9 | 24 Nov 2015 | View |
| lighting_assessment_report.pdfLighting Assessment Report | 24 Nov 2015 | View |
| lighting_assessment_appendices.pdfLighting Assessment Appendices | 24 Nov 2015 | View |
| lighting_assessment_drawings.pdfLighting Assessment Drawings | 24 Nov 2015 | View |
| pa3245-lee-moor-aad-project-nts-final.pdfNon-Technical Summary | 6 Jan 2016 | View |
| pa3245-appendix-1(1).pdfAppendix 1 - AAD Schematic Plant Technology | 12 Jan 2016 | View |
| pa3245-appendix-2(1).pdfAppendix 2 - Pre-application Advice From Devon County Council Dated 18th February 2011 | 12 Jan 2016 | View |
| pa3245-appendix-3-part-1(1).pdfAppendix 3 - Devon County Council's EIA Scoping Opinion Dated Part 1 | 12 Jan 2016 | View |
| pa3245-appendix-3-part-2(1).pdfAppendix 3 - Part 2 | 12 Jan 2016 | View |
| pa3245-appendix-3-part-3(1).pdfAppendix 3 - Part 3 | 12 Jan 2016 | View |
| pa3245-appendix-3-part-4(1).pdfAppendix 3 - Part 4 | 12 Jan 2016 | View |
| pa3245-appendix-3-part-5(1).pdfAppendix 3 - Part 5 | 12 Jan 2016 | View |
| pa3245-appendix-4(1).pdfAppendix 4 - Tabel C1 - Mitigation Measures Summary | 13 Jan 2016 | View |
| pa3245-appendix-5(1).pdfAppendix 5 - Viridor Letter Dates 29th June 2011 | 13 Jan 2016 | View |
| pa3245-appendix-6(1).pdfAppendix 6 - Imerys Letter Dated 12th July 2011 | 13 Jan 2016 | View |
| pa3245-appendix-7(1).pdfAppendix 7 - 4Recycling Digestate Report Dated 12th July 2011 | 13 Jan 2016 | View |
| pa3245-appendix-8(1).pdfAppendix 8 - Sauce Consultancy Consultation Report Dated 10th May 2011 | 13 Jan 2016 | View |
| pa3245-appendix-9(1).pdfAppendix 9 - Construction Execution Plan | 13 Jan 2016 | View |
| pa3245-lee-moor-das(1).pdfDesign and Access Statement | 14 Jan 2016 | View |
| lighting_assessment_report(1).pdfLighting Assessment Report | 14 Jan 2016 | View |
| lighting_assessment_appendices(1).pdfLighting Assessment Appendices | 14 Jan 2016 | View |
| lighting_assessment_drawings(1).pdfLighting Assessment Drawings | 14 Jan 2016 | View |
| pa3245-appendix-a1.1.pdfAppendix A1.1 - Scoping Responses | 21 Jan 2016 | View |
| pa3245-appendix-a2.1.pdfAppendix A2.1 - Photographs of Typical Plant and Structures | 21 Jan 2016 | View |
| pa3245-appendix-b2.1.pdfAppendix B2.1 - Flood Risk Assessment | 21 Jan 2016 | View |
| pa3245-appendix-b2.2.pdfAppendix B2.2 - Dilution Calculations | 21 Jan 2016 | View |
| pa3245-appendix-b4.1.pdfAppendix B4.1 - Predicted Odour Concentrations | 21 Jan 2016 | View |
| pa3245-appendix-b4.2.pdfAppendix B4.2 - Predicted Pollutant Concentrations | 21 Jan 2016 | View |
| pa3245-appendix-b5.1.pdfAppendix B5.1 - Summary of Noise Monitoring Results | 21 Jan 2016 | View |
| pa3245-appendix-b5.2.pdfAppendix B5.2 - Summary of Operational Noise Sources | 21 Jan 2016 | View |
| pa3245-appendix-b5.3.pdfAppendix B5.3 - Design Details of the Proposed Buildings Associated with the AAD Facility | 21 Jan 2016 | View |
| pa3245-appendix-b6.1.pdfAppendix B6.1 - Target Notes | 21 Jan 2016 | View |
| pa3245-appendix-b6.2.pdfAppendix B6.2 - Species List | 21 Jan 2016 | View |
| pa3245-appendix-b6.3.pdfAppendix B6.3 - An Overview of Species Protection | 21 Jan 2016 | View |
| pa3245-appendix-b6.4.pdfAppendix B6.4 - Plan of Designated Sites | 21 Jan 2016 | View |
| pa3245-appendix-b6.5.pdfAppendix B6.5 - Photographs of Buildings and Tanks | 21 Jan 2016 | View |
| pa3245-appendix-b6.6.pdfAppendix B6.6 - Summary of Criteria for Nature Conservation Evaluation | 21 Jan 2016 | View |
| pa3245-appendix-b7.1.pdfAppendix B7.1 - Extract from 'Character of England' Map, Countryside Agency 1999 | 21 Jan 2016 | View |
| pa3245-appendix-b7.2.pdfAppendix B7.2 - South Devon AONB and South Hams District Council - Landscape Character Assessment 2007 LCT 2D | 21 Jan 2016 | View |
| pa3245-appendix-b7.3.pdfAppendix B7.3 - South Devon AONB and South Hams District Council - Landscape Character Assessment 2007 3 and 3A | 21 Jan 2016 | View |
| pa3245-appendix-b7.4.pdfAppendix B7.4 - Photomontage Methodology | 21 Jan 2016 | View |
| pa3245-appendix-b7.5.pdfAppendix B7.5 - Development Plan Landscape Designations | 21 Jan 2016 | View |
| pa3245-appendix-b7.6.pdfAppendix B7.6 - G-4-1-284 Rev 1 - Potential Designate Spreading Area | 21 Jan 2016 | View |
| pa3245-lee-moor-health-study_v4.pdfHuman Health Impact Assessment | 21 Jan 2016 | View |
| pa3245-lee-moor-aad-project-final.pdfEnvironmental Statement - Text | 20 Jan 2016 | View |
| pa3245-transport-environmental-statement.pdfLee Moor Advanced Anaerobic Digester Transport Environmental Statement, Framework Travel Plan and Parking Statement | 20 Jan 2016 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.