Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land between Turf Lock Hotel and Church Road, Powderham adjacent to St Clements Church, running directly along the low-lying agricultural land to the landward side of the existing flood bund (Powderham Bank)
Last published check: 28 Sept 2026, 09:37. Check the council record for more recent changes.
Land between Turf Lock Hotel and Church Road, Powderham adjacent to St Clements Church, running directly along the low-lying agricultural land to the landward side of the existing flood bund (Powderham Bank)
This record has no verified map location.
Construction of a cycle/walkway as part of the Exe Estuary National Cycle Network No 2
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| plandoc_157_3396.pdfDecision Notice | 29 Jun 2009 | View |
| plandoc_79_3396.pdfApplication Form | 18 Dec 2008 | View |
| plandoc_81_3396.pdfPlan of NCN Route 2 | 18 Dec 2008 | View |
| plandoc_82_3396.pdfSite Plan | 18 Dec 2008 | View |
| plandoc_101_3396.pdfFigure 9.2 Invertebrate Sampling Locations | 18 Dec 2008 | View |
| plandoc_103_3396.pdfFigure 9.4 Site Plan Showing Designated Areas Around Proposed Scheme | 18 Dec 2008 | View |
| plandoc_104_3396.pdfFigure 10.1 Site Location Plan | 18 Dec 2008 | View |
| plandoc_109_3396.pdfFigure 10.6 Extract from Plan of Exeter Canal Navigation Showing Improvments Proposed by James Green, 1819 | 18 Dec 2008 | View |
| plandoc_124_3396.pdfAppendix 8E Landscape Character Zone Extract | 18 Dec 2008 | View |
| plandoc_127_3396.pdfAppendix 8H Visual Boundaries (Landplan Data NCN2 Turf Lock to Powderham) | 18 Dec 2008 | View |
| plandoc_128_3396.pdfAppendix 9A Ecological Construction Impacts | 18 Dec 2008 | View |
| plandoc_139_3396.pdfLandscape Proposals Drawing | 18 Dec 2008 | View |
| plandoc_140_3396.pdfMitigation Planting at Railway Bridge | 18 Dec 2008 | View |
| plandoc_144_3396.pdfLandscape Proposals Drawing | 18 Dec 2008 | View |
| plandoc_152_3396.pdfPowderham Cycle Bridge - General Arrangement Planning Application | 18 Dec 2008 | View |
| plandoc_80_3396.pdfPre-application advice letter 14.07.05 | 18 Dec 2008 | View |
| plandoc_84_3396.pdfPlanning Application Powderham Bank | 18 Dec 2008 | View |
| plandoc_85_3396.pdfEcological Impact Assessment Report Aug 2006 | 18 Dec 2008 | View |
| plandoc_86_3396.pdfEcological Mitigation and Monitoring Report Aug 2006 | 18 Dec 2008 | View |
| plandoc_87_3396.pdfEcological Assessment, Walkover Survey Report October 2008 | 18 Dec 2008 | View |
| plandoc_88_3396.pdfHabitat Enhancement Works - November 2008 | 18 Dec 2008 | View |
| plandoc_89_3396.pdfAppropriate Assessment Report - 16th February 2007 | 18 Dec 2008 | View |
| plandoc_90_3396.pdfMonitoring the Effects of the Exmouth to Lympstone section - Final Report 7th Feb 2008 | 18 Dec 2008 | View |
| plandoc_91_3396.pdfUpdate of the Appropriate Assessment Report - 10th October 2008 | 18 Dec 2008 | View |
| plandoc_92_3396.pdfDesign & Access Statement | 18 Dec 2008 | View |
| plandoc_93_3396.pdfClearance and Construction Activities | 18 Dec 2008 | View |
| plandoc_94_3396.pdfEnvironmental Statement Non-Technical Summary | 18 Dec 2008 | View |
| plandoc_95_3396.pdfEnvironmental Statement Volume 1 | 18 Dec 2008 | View |
| plandoc_96_3396.pdfFigure 1.1 Planning Overview | 18 Dec 2008 | View |
| plandoc_97_3396.pdfFigure 3.1 Site Plan | 18 Dec 2008 | View |
| plandoc_98_3396.pdfFigure 4.1 Preferred Bridge Design | 18 Dec 2008 | View |
| plandoc_99_3396.pdfFigure 9.1a Phase 1 Habitat Key, Map & Target Notes 2005 | 18 Dec 2008 | View |
| plandoc_100_3396.pdfFigure 9.1b Phase 1 Target Notes 2005 & 2008 | 18 Dec 2008 | View |
| plandoc_102_3396.pdfFigure 9.3 Ecological Constraints Map | 18 Dec 2008 | View |
| plandoc_105_3396.pdfFigure 10.2 Previously Recorded & New Sites Within Study Area | 18 Dec 2008 | View |
| plandoc_106_3396.pdfFigure 10.3 Map of Exwell Barton &c by Robert Whittlesey, c.1725 | 18 Dec 2008 | View |
| plandoc_107_3396.pdfFigure 10.4 Enlarged Extract from William Chapple's 1757 Map of River Exe | 18 Dec 2008 | View |
| plandoc_108_3396.pdfFigure 10.5 Reduced Extract of George Lang's Map of the Manor of Powderham, 1785 | 18 Dec 2008 | View |
| plandoc_110_3396.pdfFigure 10.7 Reduced Extracts from Tithe Maps of Exminster (1842) & Powderham (1839) | 18 Dec 2008 | View |
| plandoc_111_3396.pdfFigure 10.8 Extract from deposited Plan of the South Devon Railway, 1843 | 18 Dec 2008 | View |
| plandoc_112_3396.pdfFigure 10.9 Enlarged Extract from the 1890 Ordnance Survey | 18 Dec 2008 | View |
| plandoc_113_3396.pdfFigure 10.10 Enlarged Extract from the 1906 Ordnance Survey | 18 Dec 2008 | View |
| plandoc_114_3396.pdfFigure 10.11 Enlarged Extract from the 1963 Ordnance Survey | 18 Dec 2008 | View |
| plandoc_115_3396.pdfFigure 11.1 Noise Monitoring Location at Verger's Cottage, Powderham | 18 Dec 2008 | View |
| plandoc_116_3396.pdfFigure 11.2 Noise Monitoring Location at Exeter Canal Cyclepath, Nr Swingbridge | 18 Dec 2008 | View |
| plandoc_122_3396.pdfAppendix 8C Arboricultural Impact Assessment on Trees at River Exe, Powederham & Topsham | 18 Dec 2008 | View |
| plandoc_123_3396.pdfAppendix 8D National Landscape Map Extract | 18 Dec 2008 | View |
| plandoc_125_3396.pdfAppendix 8F Areas of Great Landscape Value & Nature Conservation Zone Policy | 18 Dec 2008 | View |
| plandoc_126_3396.pdfAppendix 8G Landscape Assessment, Teignbridge District - Redlands | 18 Dec 2008 | View |
| plandoc_129_3396.pdfAppendix 9B Ecological Operational Impacts | 18 Dec 2008 | View |
| plandoc_130_3396.pdfAppendix 9C Assessment of Significance of Ecological Impacts | 18 Dec 2008 | View |
| plandoc_131_3396.pdfAppendix 9D Ecological Survey Methodologies | 18 Dec 2008 | View |
| plandoc_132_3396.pdfAppendix 9E Ecological Walkover Report, 2008 | 18 Dec 2008 | View |
| plandoc_133_3396.pdfAppendix 9F Birds of Conservation Considered By or Excluded from Ecological Assessment | 18 Dec 2008 | View |
| plandoc_135_3396.pdfAppendix 10B Archaeological Walkover Report, 2008 | 18 Dec 2008 | View |
| plandoc_136_3396.pdfAppendix 11A Ambient Noise Measurements - Verger's Cottage, Powderham | 18 Dec 2008 | View |
| plandoc_137_3396.pdfAppendix 11B Ambient Noise Measurements - Existing Cycleway | 18 Dec 2008 | View |
| plandoc_138_3396.pdfHard Landscaping Proposals | 18 Dec 2008 | View |
| plandoc_141_3396.pdfLandscape Maintenance Schedule | 18 Dec 2008 | View |
| plandoc_142_3396.pdfRevised Flood Risk Assessment October 2008 | 18 Dec 2008 | View |
| plandoc_143_3396.pdfPlanning Application Powderham Bank | 18 Dec 2008 | View |
| plandoc_145_3396.pdfRevised Flood Risk Assessment Approval November 2008 | 18 Dec 2008 | View |
| plandoc_147_3396.pdfArchaeological Assessment Update Oct 2008 | 18 Dec 2008 | View |
| plandoc_148_3396.pdfView from Turf Locks Track | 18 Dec 2008 | View |
| plandoc_149_3396.pdfView from Powderham Church | 18 Dec 2008 | View |
| plandoc_150_3396.pdfView Towards Exe Estuary | 18 Dec 2008 | View |
| plandoc_151_3396.pdfJustification of Proposed Development | 18 Dec 2008 | View |
| plandoc_153_3396.pdfRoad Safety Audit | 18 Dec 2008 | View |
| plandoc_154_3396.pdfPowderham - Rail Crossing - Arboricultural Survey | 18 Dec 2008 | View |
| plandoc_155_3396.pdfArboricultural Impact Assessment on Trees at River Exe, Powderham & Topsham | 18 Dec 2008 | View |
| plandoc_156_3396.pdfDraft Site Waste Management Plan | 18 Dec 2008 | View |
| plandoc_167_3396.pdfNon-Material Amendment - Letter | 8 Oct 2013 | View |
| plandoc_168_3396.pdfNon-Material Amendment - Landscaping Q04005-729C | 8 Oct 2013 | View |
| plandoc_83_3396.pdfNeighbour & Community Consultation | 18 Dec 2008 | View |
| plandoc_146_3396.pdfArchaeological Recommendations of DCC - Feb 2008 | 18 Dec 2008 | View |
| plandoc_158_3396.pdfDetermination of Condition Notice (Condition 5) | 10 Apr 2013 | View |
| plandoc_159_3396.pdfDetermination of Conditions Notice (Conditions 6 and 10) | 12 Aug 2013 | View |
| plandoc_160_3396.pdfDetermination of Conditions - Email dated 10 May 2013, 9.40 as amended 31 July 2013, 13.45 | 12 Aug 2013 | View |
| plandoc_161_3396.pdfDetermination of Conditions - Email dated 17 June 2013, 11.44 | 12 Aug 2013 | View |
| plandoc_162_3396.pdfDetermination of Conditions - Tree Location, Works and Protection Plan Drawing 11.077.3 | 12 Aug 2013 | View |
| plandoc_163_3396.pdfDetermination of Conditions - Devon Tree Services 'Survey impact assessment & protection of trees' dated 4th February 2013 | 12 Aug 2013 | View |
| plandoc_164_3396.pdfDetermination of Conditions - Powderham Railway Bridge Environmental Statement Landscape Proposals Figure 3 | 12 Aug 2013 | View |
| plandoc_165_3396.pdfDetermination of Conditions - General Construction Layout Key Plan Drawing Q04005-710 | 12 Aug 2013 | View |
| plandoc_166_3396.pdfDetermination of Conditions Notice (Condition 12) | 13 Aug 2013 | View |
| plandoc_169_3396.pdfArticle 30 Decision Notice: Conditions 8 & 13 | 18 Sept 2014 | View |
| plandoc_117_3396.pdfAppendix 8A Aerial Photographs of the Route | 18 Dec 2008 | View |
| plandoc_118_3396.pdfAppendix 8B Photographic Record of Site Inspections Part 1 | 18 Dec 2008 | View |
| plandoc_119_3396.pdfAppendix 8B Photographic Record of Site Inspections Part 2 | 18 Dec 2008 | View |
| plandoc_120_3396.pdfAppendix 8B Photographic Record of Site Inspections Part 3 | 18 Dec 2008 | View |
| plandoc_121_3396.pdfAppendix 8B Photographic Record of Site Inspections Part 4 | 18 Dec 2008 | View |
| plandoc_134_3396.pdfAppendix 10A Photographic Record of Site Visit | 18 Dec 2008 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.