Council planning record

Application for the first Periodic Review of Mineral Planning Permissions (ROMP) -

Brierlow Quarry, Buxton

Application validatedReference: R1/1213/28Derbyshire County Council

Application location

Brierlow Quarry, Buxton

This record has no verified map location.

Application summary

Status
Application validated
Application type
Review of Mineral Permissions
Received
10 Dec 2013
Validated
12 Dec 2013
Determination deadline
Not published
Local authority
Derbyshire County Council

Application overview

Application for the first Periodic Review of Mineral Planning Permissions (ROMP) -

Proposal details

Reference
R1/1213/28
Agent
Mr Simon Higson

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 248 of 248

DocumentPublishedAction
Regulation 22 Ecological Assessment Addendum210820-LHO-001-E Brierlow AddEciA-ISSUE.pdf ( kb)26 Nov 2021View
Pla-LHO-001-L-EPS1 updated Existing Plant Site Layout May 2021210521_LHO-001-L-EPS1_SH_HTP.pdf ( kb)26 Nov 2021View
Pla-LHO-001-L-BP1 Site Boundary Plan May 2021210521_LHO-001-L-BP1_SH_A3_Heatons C.pdf ( kb)26 Nov 2021View
-001-L-SP1 Updated Site Plan May 2021210521_LHO-001-L-SP1_SH_A3_Heatons C(1).pdf ( kb)26 Nov 2021View
Reg 22 Appendix1-Rock Mass Assessment Letter (July 2015) r2.pdfReg 22 Appendix1-Rock Mass Assessment Letter (July 2015) r2.pdf ( kb)14 Oct 2019View
Reg 22 160310 NB-238-16 results.pdfReg 22 160310 NB-238-16 results.pdf ( kb)14 Oct 2019View
Reg 22 160321 NB-240-16 results.pdfReg 22 160321 NB-240-16 results.pdf ( kb)14 Oct 2019View
Reg 22 Appendix8-EPC-Method Statement2015.pdfReg 22 Appendix8-EPC-Method Statement2015.pdf ( kb)14 Oct 2019View
Reg 22 160321 NB-240-16 predictions (NR).pdfReg 22 160321 NB-240-16 predictions (NR).pdf ( kb)14 Oct 2019View
Reg 22 160314 NB-239-16 results.pdfReg 22 160314 NB-239-16 results.pdf ( kb)14 Oct 2019View
Reg 22 2019 09 26 covering email- Reg 22 + App 1-3.pdfReg 22 2019 09 26 covering email- Reg 22 + App 1-3.pdf ( kb)14 Oct 2019View
Reg 22 160321 NB-240-16 predictions (NR) (1).pdfReg 22 160321 NB-240-16 predictions (NR) (1).pdf ( kb)14 Oct 2019View
Reg 22 160307 NB-237-16 results.pdfReg 22 160307 NB-237-16 results.pdf ( kb)14 Oct 2019View
Reg 22 160310 NB-238-16 predictions (NR).pdfReg 22 160310 NB-238-16 predictions (NR).pdf ( kb)14 Oct 2019View
Reg 22 blast ref NB240 2016.pdfReg 22 blast ref NB240 2016.pdf ( kb)14 Oct 2019View
Reg 22 Appendix5-Blasting Procedure at Brierlow.pdfReg 22 Appendix5-Blasting Procedure at Brierlow.pdf ( kb)14 Oct 2019View
Reg 22 190926-BrierlowQuarryROMP-22-2019.pdfReg 22 190926-BrierlowQuarryROMP-22-2019.pdf ( kb)14 Oct 2019View
Reg 22 160223 NB-235-16 results.pdfReg 22 160223 NB-235-16 results.pdf ( kb)14 Oct 2019View
Reg 22 151215 Hindlow Tunnel Test Blast Results R.pdfReg 22 151215 Hindlow Tunnel Test Blast Results R.pdf ( kb)14 Oct 2019View
Reg 22 160223 NB-235-16 (NR) R.pdfReg 22 160223 NB-235-16 (NR) R.pdf ( kb)14 Oct 2019View
Reg 22 160314 NB-239-16 predictions (NR).pdfReg 22 160314 NB-239-16 predictions (NR).pdf ( kb)14 Oct 2019View
Reg 22 160301 NB-236-16 predictions (NR).pdfReg 22 160301 NB-236-16 predictions (NR).pdf ( kb)14 Oct 2019View
Reg 22 Appendix6-Shotfiring rules 2019.pdfReg 22 Appendix6-Shotfiring rules 2019.pdf ( kb)14 Oct 2019View
Reg 22 Appendix2-Ripping&BreakingInvestigationReport.pdfReg 22 Appendix2-Ripping&BreakingInvestigationReport.pdf ( kb)14 Oct 2019View
Reg 22 blast design_00001.pdfReg 22 blast design_00001.pdf ( kb)14 Oct 2019View
Reg 22 blast design_00001 (1).pdfReg 22 blast design_00001 (1).pdf ( kb)14 Oct 2019View
Reg 22 160201 NB-234-16 results R.pdfReg 22 160201 NB-234-16 results R.pdf ( kb)14 Oct 2019View
Reg 22 Hindlow NB 235 16 MIC Sheet.pdfReg 22 Hindlow NB 235 16 MIC Sheet.pdf ( kb)14 Oct 2019View
Reg 22 Appendix4-Vibration Impact Assessment Report 2018.pdfReg 22 Appendix4-Vibration Impact Assessment Report 2018.pdf ( kb)14 Oct 2019View
Reg 22 160310 NB-238-16 predictions (NR).pdfReg 22 160310 NB-238-16 predictions (NR).pdf ( kb)27 Sept 2019View
Reg 22 160310 NB-238-16 results.pdfReg 22 160310 NB-238-16 results.pdf ( kb)27 Sept 2019View
Reg 22 160321 NB-240-16 results.pdfReg 22 160321 NB-240-16 results.pdf ( kb)27 Sept 2019View
Reg 22 160223 NB-235-16 results.pdfReg 22 160223 NB-235-16 results.pdf ( kb)27 Sept 2019View
Reg 22 160201 NB-234-16 results R.pdfReg 22 160201 NB-234-16 results R.pdf ( kb)27 Sept 2019View
Reg 22 160301 NB-236-16 predictions (NR).pdfReg 22 160301 NB-236-16 predictions (NR).pdf ( kb)27 Sept 2019View
Reg 22 Appendix5-Blasting Procedure at Brierlow.pdfReg 22 Appendix5-Blasting Procedure at Brierlow.pdf ( kb)27 Sept 2019View
Reg 22 Hindlow NB 235 16 MIC Sheet.pdfReg 22 Hindlow NB 235 16 MIC Sheet.pdf ( kb)27 Sept 2019View
Reg 22 blast ref NB240 2016.pdfReg 22 blast ref NB240 2016.pdf ( kb)27 Sept 2019View
Reg 22 151215 Hindlow Tunnel Test Blast Results R.pdfReg 22 151215 Hindlow Tunnel Test Blast Results R.pdf ( kb)27 Sept 2019View
Reg 22 160314 NB-239-16 predictions (NR).pdfReg 22 160314 NB-239-16 predictions (NR).pdf ( kb)27 Sept 2019View
Reg 22 Appendix2-Ripping&BreakingInvestigationReport.pdfReg 22 Appendix2-Ripping&BreakingInvestigationReport.pdf ( kb)27 Sept 2019View
Reg 22 160321 NB-240-16 predictions (NR) (1).pdfReg 22 160321 NB-240-16 predictions (NR) (1).pdf ( kb)27 Sept 2019View
Reg 22 160307 NB-237-16 results.pdfReg 22 160307 NB-237-16 results.pdf ( kb)27 Sept 2019View
Reg 22 Appendix4-Vibration Impact Assessment Report 2018.pdfReg 22 Appendix4-Vibration Impact Assessment Report 2018.pdf ( kb)27 Sept 2019View
Reg 22 190926-BrierlowQuarryROMP-22-2019.pdfReg 22 190926-BrierlowQuarryROMP-22-2019.pdf ( kb)27 Sept 2019View
Reg 22 Appendix1-Rock Mass Assessment Letter (July 2015) r2.pdfReg 22 Appendix1-Rock Mass Assessment Letter (July 2015) r2.pdf ( kb)27 Sept 2019View
Reg 22 160314 NB-239-16 results.pdfReg 22 160314 NB-239-16 results.pdf ( kb)27 Sept 2019View
Reg 22 160223 NB-235-16 (NR) R.pdfReg 22 160223 NB-235-16 (NR) R.pdf ( kb)27 Sept 2019View
Reg 22 Appendix6-Shotfiring rules 2019.pdfReg 22 Appendix6-Shotfiring rules 2019.pdf ( kb)27 Sept 2019View
Reg 22 2019 09 26 covering email- Reg 22 + App 1-3.pdfReg 22 2019 09 26 covering email- Reg 22 + App 1-3.pdf ( kb)27 Sept 2019View
Reg 22 blast design_00001.pdfReg 22 blast design_00001.pdf ( kb)27 Sept 2019View
Reg 22 blast design_00001 (1).pdfReg 22 blast design_00001 (1).pdf ( kb)27 Sept 2019View
Reg 22 Appendix8-EPC-Method Statement2015.pdfReg 22 Appendix8-EPC-Method Statement2015.pdf ( kb)27 Sept 2019View
Reg 22 160321 NB-240-16 predictions (NR).pdfReg 22 160321 NB-240-16 predictions (NR).pdf ( kb)27 Sept 2019View
2018 12 05 Network Rail Degradation Report (final).pdf2018 12 05 Network Rail Degradation Report (final).pdf ( kb)9 Jan 2019View
sup-Description of Restoration Trial Area.pdfsup-Description of Restoration Trial Area.pdf ( kb)10 Dec 2018View
pla-BQ C21.pdfpla-BQ C21.pdf ( kb)19 Mar 2018View
sup-Section 4 Alternatives.pdfsup-Section 4 Alternatives.pdf ( kb)1 Nov 2016View
sup-Section 1 Introduction.pdfsup-Section 1 Introduction.pdf ( kb)1 Jun 2016View
add info-160427_403 04047 00001_REG22-DEVPROP_FINAL.pdfadd info-160427_403 04047 00001_REG22-DEVPROP_FINAL.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-3_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-3_SM-REVB_A2.pdf ( kb)29 Apr 2016View
sup-Apppendix 4A Rock Mass Assessment Letter (July 2015) r2.pdfsup-Apppendix 4A Rock Mass Assessment Letter (July 2015) r2.pdf ( kb)29 Apr 2016View
add info-160427_403 04047 00001_REG22-DISCUSSION_FINAL.pdfadd info-160427_403 04047 00001_REG22-DISCUSSION_FINAL.pdf ( kb)29 Apr 2016View
add info-160427_403 04047 00001_REG22-HINDLOWTUNNEL_FINAL.pdfadd info-160427_403 04047 00001_REG22-HINDLOWTUNNEL_FINAL.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-7_SH-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-7_SH-REVB_A2.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-8_SH-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-8_SH-REVB_A2.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.BQ_3-13_SH-REVC_A2.pdfpla-160421_04047.00001.BQ_3-13_SH-REVC_A2.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.BQ_3-14_SH-REVA_A3.pdfpla-160421_04047.00001.BQ_3-14_SH-REVA_A3.pdf ( kb)29 Apr 2016View
pla.160421_04047.00001.16.BQ_3-9_SH-REVB_Layout1.pdfpla.160421_04047.00001.16.BQ_3-9_SH-REVB_Layout1.pdf ( kb)29 Apr 2016View
add info-Brierlow Quarry Contents - ROMP Reg 22 - April 2016.pdfadd info-Brierlow Quarry Contents - ROMP Reg 22 - April 2016.pdf ( kb)29 Apr 2016View
pla-160415_04047.00001.16.001.BQ_SH-BQ7-11.pdfpla-160415_04047.00001.16.001.BQ_SH-BQ7-11.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-4_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-4_SM-REVB_A2.pdf ( kb)29 Apr 2016View
pla-160415_04047.00001.16.001.BQ_SH-BQ7-12.pdfpla-160415_04047.00001.16.001.BQ_SH-BQ7-12.pdf ( kb)29 Apr 2016View
pla-160415_04047.00001.16.001.BQ_SH-BQ7-13.pdfpla-160415_04047.00001.16.001.BQ_SH-BQ7-13.pdf ( kb)29 Apr 2016View
sup-Appendix 2-D LCA-WhitePeak_tcm44-21138 11.pdfsup-Appendix 2-D LCA-WhitePeak_tcm44-21138 11.pdf ( kb)29 Apr 2016View
pla-160415_04047.00001.16.001.BQ_SH-BQ7-14.pdfpla-160415_04047.00001.16.001.BQ_SH-BQ7-14.pdf ( kb)29 Apr 2016View
pla-160420_04047.00001.16.00.BQ7-7-REVB_SM.pdfpla-160420_04047.00001.16.00.BQ7-7-REVB_SM.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-10_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-10_SM-REVB_A2.pdf ( kb)29 Apr 2016View
add info-160427_403 04047 00001_REG22-INTRODUCTION_FINAL.pdfadd info-160427_403 04047 00001_REG22-INTRODUCTION_FINAL.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-11_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-11_SM-REVB_A2.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-1_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-1_SM-REVB_A2.pdf ( kb)29 Apr 2016View
add info-160427_403 04047 00001_REG22-CONDITIONS_FINAL.pdfadd info-160427_403 04047 00001_REG22-CONDITIONS_FINAL.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-6_SH-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-6_SH-REVB_A2.pdf ( kb)29 Apr 2016View
sup-Appendix 2-A mpflimestone (1).pdfsup-Appendix 2-A mpflimestone (1).pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-5_SM-REVB_A2.pdfpla-160421_04047.00001.16.BQ_3-5_SM-REVB_A2.pdf ( kb)29 Apr 2016View
sup-Appendix 2-B 150422-403-04047-00001-R-ROLLOVERSLOPE-FINAL.pdfsup-Appendix 2-B 150422-403-04047-00001-R-ROLLOVERSLOPE-FINAL.pdf ( kb)29 Apr 2016View
sup-Appendix 2-C DETR Fig 9.pdfsup-Appendix 2-C DETR Fig 9.pdf ( kb)29 Apr 2016View
pla-160421_04047.00001.16.BQ_3-2_SM-REVB_A3.pdfpla-160421_04047.00001.16.BQ_3-2_SM-REVB_A3.pdf ( kb)29 Apr 2016View
2015 05 08 AGT - CO Techical Report re 3d Modelling 02 R1 1213 28.pdf2015 05 08 AGT - CO Techical Report re 3d Modelling 02 R1 1213 28.pdf ( kb)14 May 2015View
sup-Contents.pdfsup-Contents.pdf ( kb)10 Dec 2014View
2014 07 09 add info Ecology.pdf2014 07 09 add info Ecology.pdf ( kb)22 Jul 2014View
2014 07 09 add info working & restoration.pdf2014 07 09 add info working & restoration.pdf ( kb)22 Jul 2014View
pla-BQ_3-4.pdfpla-BQ_3-4.pdf ( kb)22 Jul 2014View
pla-BQ_3-5.pdfpla-BQ_3-5.pdf ( kb)22 Jul 2014View
pla-BQ_3-7.pdfpla-BQ_3-7.pdf ( kb)22 Jul 2014View
pla-BQ_3-8.pdfpla-BQ_3-8.pdf ( kb)22 Jul 2014View
pla-BQ_3-9.pdfpla-BQ_3-9.pdf ( kb)22 Jul 2014View
pla-BQ_7-11.pdfpla-BQ_7-11.pdf ( kb)22 Jul 2014View
pla-BQ_7-12.pdfpla-BQ_7-12.pdf ( kb)22 Jul 2014View
pla-BQ_3-2.pdfpla-BQ_3-2.pdf ( kb)22 Jul 2014View
2014 07 09-add info covering letter.pdf2014 07 09-add info covering letter.pdf ( kb)22 Jul 2014View
pla-BQ_7-13.pdfpla-BQ_7-13.pdf ( kb)22 Jul 2014View
pla-BQ_3-12.pdfpla-BQ_3-12.pdf ( kb)22 Jul 2014View
pla-BQ_7-14.pdfpla-BQ_7-14.pdf ( kb)22 Jul 2014View
pla-BQ_7-15.pdfpla-BQ_7-15.pdf ( kb)22 Jul 2014View
pla-BQ_7-16.pdfpla-BQ_7-16.pdf ( kb)22 Jul 2014View
2014 07 09 add info LVIA.pdf2014 07 09 add info LVIA.pdf ( kb)22 Jul 2014View
pla-BQ_3-6.pdfpla-BQ_3-6.pdf ( kb)22 Jul 2014View
2014 07 09 add info pla-BQ-9-3.pdf2014 07 09 add info pla-BQ-9-3.pdf ( kb)22 Jul 2014View
2014 07 09 add info Section 1 Introduction.pdf2014 07 09 add info Section 1 Introduction.pdf ( kb)22 Jul 2014View
pla-BQ_3-1.pdfpla-BQ_3-1.pdf ( kb)22 Jul 2014View
pla-BQ_3-3.pdfpla-BQ_3-3.pdf ( kb)22 Jul 2014View
pla-BQ_3-10.pdfpla-BQ_3-10.pdf ( kb)22 Jul 2014View
pla-BQ_3-11.pdfpla-BQ_3-11.pdf ( kb)22 Jul 2014View
sup-Appendix C - Letter Report FINAL 02-08-11.pdfsup-Appendix C - Letter Report FINAL 02-08-11.pdf ( kb)20 May 2014View
frm-Application Form.pdffrm-Application Form.pdf ( kb)12 Dec 2013View
sup-Appendix 7-5.pdfsup-Appendix 7-5.pdf ( kb)10 Dec 2013View
sup-Section 10 Noise.pdfsup-Section 10 Noise.pdf ( kb)10 Dec 2013View
sup-Section 11 Blasting.pdfsup-Section 11 Blasting.pdf ( kb)10 Dec 2013View
sup-Section 12 Air Quality.pdfsup-Section 12 Air Quality.pdf ( kb)10 Dec 2013View
sup-Section 14 Archaeology & Cultural Heritage.pdfsup-Section 14 Archaeology & Cultural Heritage.pdf ( kb)10 Dec 2013View
sup-Section 15 Soils.pdfsup-Section 15 Soils.pdf ( kb)10 Dec 2013View
sup-Section 16 Socio-economics.pdfsup-Section 16 Socio-economics.pdf ( kb)10 Dec 2013View
sup-Section 17 Carbon & Climate.pdfsup-Section 17 Carbon & Climate.pdf ( kb)10 Dec 2013View
sup-Section 3 Development Proposals.pdfsup-Section 3 Development Proposals.pdf ( kb)10 Dec 2013View
sup-Appendix 7-4.pdfsup-Appendix 7-4.pdf ( kb)10 Dec 2013View
sup-Appendix 7-3.pdfsup-Appendix 7-3.pdf ( kb)10 Dec 2013View
sup-Section 7 LVIA.pdfsup-Section 7 LVIA.pdf ( kb)10 Dec 2013View
sup-Appendix 15-1.pdfsup-Appendix 15-1.pdf ( kb)10 Dec 2013View
sup-Section 8 Traffic.pdfsup-Section 8 Traffic.pdf ( kb)10 Dec 2013View
sup-Appendix 17-1.pdfsup-Appendix 17-1.pdf ( kb)10 Dec 2013View
pla-BQ_3-2 Existing Plant Site Layout.pdfpla-BQ_3-2 Existing Plant Site Layout.pdf ( kb)10 Dec 2013View
pla-BQ_3-3 Proposed Maximum Extraction Design.pdfpla-BQ_3-3 Proposed Maximum Extraction Design.pdf ( kb)10 Dec 2013View
pla-BQ_3-4 Illustrative Long Cross Sections.pdfpla-BQ_3-4 Illustrative Long Cross Sections.pdf ( kb)10 Dec 2013View
sup-Section 18 Non-Tech Summary.pdfsup-Section 18 Non-Tech Summary.pdf ( kb)10 Dec 2013View
pla-BQ_3-1 Existing Situation.pdfpla-BQ_3-1 Existing Situation.pdf ( kb)10 Dec 2013View
pla-BQ_3-6 Illustrative Stage 2028.pdfpla-BQ_3-6 Illustrative Stage 2028.pdf ( kb)10 Dec 2013View
pla-BQ_3-7 Illustrative Stage 2042.pdfpla-BQ_3-7 Illustrative Stage 2042.pdf ( kb)10 Dec 2013View
pla-BQ_3-9 Indicative Restoration Section.pdfpla-BQ_3-9 Indicative Restoration Section.pdf ( kb)10 Dec 2013View
sup-Section 9 Ecology.pdfsup-Section 9 Ecology.pdf ( kb)10 Dec 2013View
pla-BQ-1-1 Location Plan.pdfpla-BQ-1-1 Location Plan.pdf ( kb)10 Dec 2013View
sup-Appendix 8-2.pdfsup-Appendix 8-2.pdf ( kb)10 Dec 2013View
sup-Appendix 10-1.pdfsup-Appendix 10-1.pdf ( kb)10 Dec 2013View
pla-BQ-14-2 Heritage Assets & ZTV of Max Extraction.pdfpla-BQ-14-2 Heritage Assets & ZTV of Max Extraction.pdf ( kb)10 Dec 2013View
sup-Appendix 12-1.pdfsup-Appendix 12-1.pdf ( kb)10 Dec 2013View
pla-BQ-14-3 Prehistoric Landscape.pdfpla-BQ-14-3 Prehistoric Landscape.pdf ( kb)10 Dec 2013View
sup-Appendix 1-2.pdfsup-Appendix 1-2.pdf ( kb)10 Dec 2013View
pla-BQ-14-4 Roman & Early Medieval Landscape.pdfpla-BQ-14-4 Roman & Early Medieval Landscape.pdf ( kb)10 Dec 2013View
pla-BQ-14-5 Medieval Landscape.pdfpla-BQ-14-5 Medieval Landscape.pdf ( kb)10 Dec 2013View
sup-Appendix 10-4.pdfsup-Appendix 10-4.pdf ( kb)10 Dec 2013View
pla-BQ-14-6 Post-Medieval Landscape.pdfpla-BQ-14-6 Post-Medieval Landscape.pdf ( kb)10 Dec 2013View
2013 12 10 Covering Letter.pdf2013 12 10 Covering Letter.pdf ( kb)10 Dec 2013View
pla-BQ-7-1 Landscape Character.pdfpla-BQ-7-1 Landscape Character.pdf ( kb)10 Dec 2013View
sup-Appendix 10-2.pdfsup-Appendix 10-2.pdf ( kb)10 Dec 2013View
pla-BQ-14-1 Heritage Assets & ZTV of Existing Extraction.pdfpla-BQ-14-1 Heritage Assets & ZTV of Existing Extraction.pdf ( kb)10 Dec 2013View
pla-BQ-7-10 Viewpoints 7 & 8.pdfpla-BQ-7-10 Viewpoints 7 & 8.pdf ( kb)10 Dec 2013View
pla-BQ-7-2 Aerial Photograph.pdfpla-BQ-7-2 Aerial Photograph.pdf ( kb)10 Dec 2013View
pla-BQ-7-3 ZTV of Existing Extraction.pdfpla-BQ-7-3 ZTV of Existing Extraction.pdf ( kb)10 Dec 2013View
pla-BQ_3-8 Final Restoration Scheme.pdfpla-BQ_3-8 Final Restoration Scheme.pdf ( kb)10 Dec 2013View
frm-Certificates.pdffrm-Certificates.pdf ( kb)10 Dec 2013View
pla-BQ-7-4 ZTV of Maximum Extraction Area.pdfpla-BQ-7-4 ZTV of Maximum Extraction Area.pdf ( kb)10 Dec 2013View
sup-Appendix 1-1.pdfsup-Appendix 1-1.pdf ( kb)10 Dec 2013View
pla-BQ-7-5 Viewpoints 1 & 2.pdfpla-BQ-7-5 Viewpoints 1 & 2.pdf ( kb)10 Dec 2013View
sup-Appendix 1-3.pdfsup-Appendix 1-3.pdf ( kb)10 Dec 2013View
pla-BQ-7-6 Viewpoint 3.pdfpla-BQ-7-6 Viewpoint 3.pdf ( kb)10 Dec 2013View
pla-BQ_3-5 Illustrative Stage End of South Bowl Extraction.pdfpla-BQ_3-5 Illustrative Stage End of South Bowl Extraction.pdf ( kb)10 Dec 2013View
pla-BQ-7-7 Viewpoint 4.pdfpla-BQ-7-7 Viewpoint 4.pdf ( kb)10 Dec 2013View
sup-Appendix 10-3.pdfsup-Appendix 10-3.pdf ( kb)10 Dec 2013View
pla-BQ-7-8 Viewpoint 5.pdfpla-BQ-7-8 Viewpoint 5.pdf ( kb)10 Dec 2013View
sup-Appendix 10-5.pdfsup-Appendix 10-5.pdf ( kb)10 Dec 2013View
sup-Section 6 Geology.pdfsup-Section 6 Geology.pdf ( kb)10 Dec 2013View
sup-Section 5 Planning Policy.pdfsup-Section 5 Planning Policy.pdf ( kb)10 Dec 2013View
pla-BQ-7-9 Viewpoint 6.pdfpla-BQ-7-9 Viewpoint 6.pdf ( kb)10 Dec 2013View
sup-Appendix 12-2.pdfsup-Appendix 12-2.pdf ( kb)10 Dec 2013View
sup-Section 2 Site Setting.pdfsup-Section 2 Site Setting.pdf ( kb)10 Dec 2013View
sup-Appendix 13-1.pdfsup-Appendix 13-1.pdf ( kb)10 Dec 2013View
pla-BQ-9-1 Phase 1 Habitat Survey.pdfpla-BQ-9-1 Phase 1 Habitat Survey.pdf ( kb)10 Dec 2013View
sup-Appendix 14-1.pdfsup-Appendix 14-1.pdf ( kb)10 Dec 2013View
sup-Appendix 14-2.pdfsup-Appendix 14-2.pdf ( kb)10 Dec 2013View
sup-Section 13 Hydro.pdfsup-Section 13 Hydro.pdf ( kb)10 Dec 2013View
sup-Appendix 14-3.pdfsup-Appendix 14-3.pdf ( kb)10 Dec 2013View
sup-Appendix 9-1.pdfsup-Appendix 9-1.pdf ( kb)10 Dec 2013View
sup-Appendix 7-1.pdfsup-Appendix 7-1.pdf ( kb)10 Dec 2013View
sup-Appendix 7-2.pdfsup-Appendix 7-2.pdf ( kb)10 Dec 2013View
Brierlow Quarry Romp Chapter 014 Cultural Heritage Chapter Update Final 24 01 23Brierlow Quarry_ROMP_Chapter 014 Cultural Heritage Chapter update_FINAL-24-01-23.pdf ( kb)31 Jan 2023View
2019 11 06 RES EA 05 R1-1213-28.pdf2019 11 06 RES EA 05 R1-1213-28.pdf ( kb)11 Nov 2019View
2019 11 08 RES HPBC 05 R1-1213-28.pdf2019 11 08 RES HPBC 05 R1-1213-28.pdf ( kb)11 Nov 2019View
2019 11 05 RES Highways 05 R1-1213-28.pdf2019 11 05 RES Highways 05 R1-1213-28.pdf ( kb)5 Nov 2019View
2019 10-18 RES NE add info 05 R1-1213-28.pdf2019 10-18 RES NE add info 05 R1-1213-28.pdf ( kb)21 Oct 2019View
2018 12 10 RES Hindlow Tunnel Report 05 R1-1213-28.pdf2018 12 10 RES Hindlow Tunnel Report 05 R1-1213-28.pdf ( kb)10 Dec 2018View
2017 01 16 RES HPBC 05 R1-1213-28.pdf2017 01 16 RES HPBC 05 R1-1213-28.pdf ( kb)24 Jan 2017View
2016 05 23 RES HE 05 R1-1213-28.pdf2016 05 23 RES HE 05 R1-1213-28.pdf ( kb)28 Nov 2016View
2016 09 30 Res PDNPA 05 R1-1213-28.pdf2016 09 30 Res PDNPA 05 R1-1213-28.pdf ( kb)5 Oct 2016View
2016 08 30 Res DWT 05 R1-1213-28.pdf2016 08 30 Res DWT 05 R1-1213-28.pdf ( kb)31 Aug 2016View
2016 08 19 Res DWT 05 R1-1213-28.pdf2016 08 19 Res DWT 05 R1-1213-28.pdf ( kb)19 Aug 2016View
2016 07 19 Res EA 05 R1-1213-28.pdf2016 07 19 Res EA 05 R1-1213-28.pdf ( kb)27 Jul 2016View
2016 07 26 RES Natural England 05 R1-1213-28.pdf2016 07 26 RES Natural England 05 R1-1213-28.pdf ( kb)26 Jul 2016View
2016 06 30 Res Network Rail 05 R1-1213-28.pdf2016 06 30 Res Network Rail 05 R1-1213-28.pdf ( kb)4 Jul 2016View
2016 05 27 RES Highways 05 R1-1213-28.pdf2016 05 27 RES Highways 05 R1-1213-28.pdf ( kb)27 May 2016View
2016 05 25 RES HPBC EHO 05 R1-1213-28.pdf2016 05 25 RES HPBC EHO 05 R1-1213-28.pdf ( kb)25 May 2016View
2016 05 12 RES EA 05 R1-1213-28.pdf2016 05 12 RES EA 05 R1-1213-28.pdf ( kb)13 May 2016View
2015 04 30 RES Network Rail 05 R1-1213-28.pdf2015 04 30 RES Network Rail 05 R1-1213-28.pdf ( kb)1 May 2015View
2014 09 08 RES United Utilities 05 R1-1213-28.pdf2014 09 08 RES United Utilities 05 R1-1213-28.pdf ( kb)10 Sept 2014View
2014 09 04 RES PRoW 05 R1-1213-28.pdf2014 09 04 RES PRoW 05 R1-1213-28.pdf ( kb)8 Sept 2014View
2014 09 04 RES EA 05 R1-1213-28.pdf2014 09 04 RES EA 05 R1-1213-28.pdf ( kb)5 Sept 2014View
2014 08 21 RES English Heritage 05 R1-1213-28.pdf2014 08 21 RES English Heritage 05 R1-1213-28.pdf ( kb)26 Aug 2014View
2014 08 21 RES Highways R1-1213-28.pdf2014 08 21 RES Highways R1-1213-28.pdf ( kb)22 Aug 2014View
2014 08 20 RES NE 05 R1-1213-28.pdf2014 08 20 RES NE 05 R1-1213-28.pdf ( kb)21 Aug 2014View
2014 07 09 add info Section 1 Introduction.pdf2014 07 09 add info Section 1 Introduction.pdf ( kb)18 Aug 2014View
2014 07 09 add info LVIA.pdf2014 07 09 add info LVIA.pdf ( kb)18 Aug 2014View
2014 07 09 add info Ecology.pdf2014 07 09 add info Ecology.pdf ( kb)18 Aug 2014View
2014 07 09 add info pla-BQ-9-3.pdf2014 07 09 add info pla-BQ-9-3.pdf ( kb)18 Aug 2014View
2014 07 09 add info working & restoration.pdf2014 07 09 add info working & restoration.pdf ( kb)18 Aug 2014View
Appendix C - Letter Report FINAL 02-08-11.pdfAppendix C - Letter Report FINAL 02-08-11.pdf ( kb)18 Aug 2014View
2014 07 09-add info covering letter.pdf2014 07 09-add info covering letter.pdf ( kb)18 Aug 2014View
2014 07 29 RES forward planning 05 R1-1213-28.pdf2014 07 29 RES forward planning 05 R1-1213-28.pdf ( kb)11 Aug 2014View
2014 06 27 RES 05 Network Rail R1-1213-28.pdf2014 06 27 RES 05 Network Rail R1-1213-28.pdf ( kb)15 Jul 2014View
2014 05 06 RES Highways 05 R1-1213-28 (2).pdf2014 05 06 RES Highways 05 R1-1213-28 (2).pdf ( kb)6 May 2014View
2014 05 06 RES Highways 05 R1-1213-28.pdf2014 05 06 RES Highways 05 R1-1213-28.pdf ( kb)6 May 2014View
2014 03 31 PDNP RES 05 R1-1213-28.pdf2014 03 31 PDNP RES 05 R1-1213-28.pdf ( kb)3 Apr 2014View
2014 03 31 RES Archaeology 05 R1-1213-28.pdf2014 03 31 RES Archaeology 05 R1-1213-28.pdf ( kb)31 Mar 2014View
2014 03 18 RES Ecology 05 R1-1213-28.pdf2014 03 18 RES Ecology 05 R1-1213-28.pdf ( kb)19 Mar 2014View
2014 03 11 RES Chelmorton PC 05 R1-1213-28.pdf2014 03 11 RES Chelmorton PC 05 R1-1213-28.pdf ( kb)12 Mar 2014View
2014 03 04 RES DWT 05 R1-1213-28.pdf2014 03 04 RES DWT 05 R1-1213-28.pdf ( kb)11 Mar 2014View
2014 03 03 DCLG RES 05 R1-1213-28.pdf2014 03 03 DCLG RES 05 R1-1213-28.pdf ( kb)4 Mar 2014View
2014 03 03 PDNP Ack 05 R1-1213-28.pdf2014 03 03 PDNP Ack 05 R1-1213-28.pdf ( kb)4 Mar 2014View
2014 03 03 PC RES 05 R1-1213-28.pdf2014 03 03 PC RES 05 R1-1213-28.pdf ( kb)3 Mar 2014View
2014 02 07 RES EA 05 R1-1213-28.pdf2014 02 07 RES EA 05 R1-1213-28.pdf ( kb)11 Feb 2014View
2014 01 22 RES NE 05 R1-1213-28.pdf2014 01 22 RES NE 05 R1-1213-28.pdf ( kb)23 Jan 2014View
2014 01 15 RES Highways 05 R1-1213-28.pdf2014 01 15 RES Highways 05 R1-1213-28.pdf ( kb)21 Jan 2014View
2014 01 15 RES Landscape 05 R1-1213-28.pdf2014 01 15 RES Landscape 05 R1-1213-28.pdf ( kb)21 Jan 2014View
2014 01 11 RES English Heritage 05 R1-1213-28.pdf2014 01 11 RES English Heritage 05 R1-1213-28.pdf ( kb)15 Jan 2014View
2014 01 08 RES HPBC EHO 05 R1-1213-28.pdf2014 01 08 RES HPBC EHO 05 R1-1213-28.pdf ( kb)13 Jan 2014View
2013 12 30 RES STW 05 R1-1213-28.pdf2013 12 30 RES STW 05 R1-1213-28.pdf ( kb)7 Jan 2014View
2013 12 17 RES HP EHO 05 R1-1213-28.pdf2013 12 17 RES HP EHO 05 R1-1213-28.pdf ( kb)18 Dec 2013View
2013 12 17 RES PRoW 05 R1-1213-28.pdf2013 12 17 RES PRoW 05 R1-1213-28.pdf ( kb)18 Dec 2013View
2022 02 09 RES DWT R1-1213-28DWTCOU281-5.pdf ( kb)9 Feb 2022View
2021 12 09 Reg 22 Press Advert R1 1213 282021 11 25 Reg 22 Press Advert R1-1213-28v3.pdf ( kb)3 Dec 2021View
2019 10 17 Press Cutting Buxton Advertiser 03 R1-1213-28.pdf2019 10 17 Press Cutting Buxton Advertiser 03 R1-1213-28.pdf ( kb)2 Jan 2020View
2019 10 17 Reg 22 Press Advert 03 R1-1213-28.docx2019 10 17 Reg 22 Press Advert 03 R1-1213-28.docx ( kb)10 Oct 2019View
2016 12 01 press advert 03 CM1-1016-58.pdf2016 12 01 press advert 03 CM1-1016-58.pdf ( kb)26 Feb 2019View
2016 05 26 Buxton Advertiser 03 R1-1213-28.pdf2016 05 26 Buxton Advertiser 03 R1-1213-28.pdf ( kb)27 May 2016View
2016 05 26 Press Notice 03 R1-1213-28.pdf2016 05 26 Press Notice 03 R1-1213-28.pdf ( kb)16 May 2016View
201 08 28 Press advert 03 R1-1213-28 (1).pdf201 08 28 Press advert 03 R1-1213-28 (1).pdf ( kb)30 Sept 2014View
2014 01 16 Buxton Advertiser Press Notice 03 R1-1213-28.pdf2014 01 16 Buxton Advertiser Press Notice 03 R1-1213-28.pdf ( kb)5 Feb 2014View
2017 09 27 LRES 06 R1-1213-28.pdf2017 09 27 LRES 06 R1-1213-28.pdf ( kb)14 Oct 2019View
2016 05 25 Site notice Brierlow 03 R1-1213-28.pdf2016 05 25 Site notice Brierlow 03 R1-1213-28.pdf ( kb)27 May 2016View
2014 08 28 Site notice Reg 22 03 R1-1213-28.pdf2014 08 28 Site notice Reg 22 03 R1-1213-28.pdf ( kb)27 Aug 2014View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Consultation Replies Awaited
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.