Council planning record

Surface coal mining scheme with restoration to agriculture with nature conservation benefits.

Hilltop Farm, Derby Road, Clay Cross, Chesterfield, Derbyshire,S45 9AG

Application refusedReference: CM4/1215/125Derbyshire County Council

Last published check: 28 Sept 2026, 12:50. Check the council record for more recent changes.

Application location

Hilltop Farm, Derby Road, Clay Cross, Chesterfield, Derbyshire,S45 9AG

This record has no verified map location.

Application summary

Status
Application refused
Application type
Major (Mineral)
Received
25 Jan 2016
Validated
25 Jan 2016
Determination deadline
Not published
Local authority
Derbyshire County Council

Application overview

Surface coal mining scheme with restoration to agriculture with nature conservation benefits.

Proposal details

Reference
CM4/1215/125

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 949 of 949

DocumentPublishedAction
1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf ( kb)27 Apr 2017View
1.2 APP-U1050-W-16-3166227 2016 07 26 NetworkRail cons response.pdf1.2 APP-U1050-W-16-3166227 2016 07 26 NetworkRail cons response.pdf ( kb)27 Apr 2017View
1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf ( kb)27 Apr 2017View
1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf ( kb)27 Apr 2017View
1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf ( kb)27 Apr 2017View
10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf ( kb)27 Apr 2017View
2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf ( kb)27 Apr 2017View
2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf ( kb)27 Apr 2017View
2017 01 09 Legal letter to PINS 10 CM4-1215-125.pdf2017 01 09 Legal letter to PINS 10 CM4-1215-125.pdf ( kb)9 Jan 2017View
2017 02 28 AGT - CO re notice-legal notes-bond 10 CM4-1215-125.pdf2017 02 28 AGT - CO re notice-legal notes-bond 10 CM4-1215-125.pdf ( kb)2 Mar 2017View
2017 04 26 Covering letter.pdf2017 04 26 Covering letter.pdf ( kb)27 Apr 2017View
2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf ( kb)27 Apr 2017View
2017 09 21 Appeal Reg 22 submision 17929-SK-004 rev A.pdf2017 09 21 Appeal Reg 22 submision 17929-SK-004 rev A.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submision Technical Note 3 - Draft.pdf2017 09 21 Appeal Reg 22 submision Technical Note 3 - Draft.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submisison Fig 3 Tree Retention Plan 5171-A-05 revC.pdf2017 09 21 Appeal Reg 22 submisison Fig 3 Tree Retention Plan 5171-A-05 revC.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission 170921 Reg 22 covering letter.pdf2017 09 21 Appeal Reg 22 submission 170921 Reg 22 covering letter.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission Appendix A to Technical Note 2 - Hill Top Quantities.pdf2017 09 21 Appeal Reg 22 submission Appendix A to Technical Note 2 - Hill Top Quantities.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission Hilltop Farm_ GHG Assessment Final.pdf2017 09 21 Appeal Reg 22 submission Hilltop Farm_ GHG Assessment Final.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission PINS Reg 22 Noise Response 21 Aug 17.pdf2017 09 21 Appeal Reg 22 submission PINS Reg 22 Noise Response 21 Aug 17.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submissionTree retension plan 5171-A-04 revc.pdf2017 09 21 Appeal Reg 22 submissionTree retension plan 5171-A-04 revc.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submssion Enclosure to Technical Note 2 - Bulking data.pdf2017 09 21 Appeal Reg 22 submssion Enclosure to Technical Note 2 - Bulking data.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised Figure 11 Viewpoints Q & R.pdf2017 09 21 Appeal Revised Figure 11 Viewpoints Q & R.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 1 LVIA Methodology.pdf2017 09 21 Appeal Revised LVIA Appendix 1 LVIA Methodology.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 2 Vehicle Photographs.pdf2017 09 21 Appeal Revised LVIA Appendix 2 Vehicle Photographs.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 3 Effects on Landscape Character_rev0.3.pdf2017 09 21 Appeal Revised LVIA Appendix 3 Effects on Landscape Character_rev0.3.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 4 Visual Effects_rev1.1.pdf2017 09 21 Appeal Revised LVIA Appendix 4 Visual Effects_rev1.1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal revised LVIA Assessment Comparisons v1.pdf2017 09 21 Appeal revised LVIA Assessment Comparisons v1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 10 Viewpoints O & P.pdf2017 09 21 Appeal Revised LVIA Figure 10 Viewpoints O & P.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1a Phasing Sheet 1.pdf2017 09 21 Appeal Revised LVIA Figure 1a Phasing Sheet 1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1b Phasing Sheet 2.pdf2017 09 21 Appeal Revised LVIA Figure 1b Phasing Sheet 2.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1c Phasing Sheet 3.pdf2017 09 21 Appeal Revised LVIA Figure 1c Phasing Sheet 3.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 2 Site Context_0.2.pdf2017 09 21 Appeal Revised LVIA Figure 2 Site Context_0.2.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 3 Viewpoints A & B.pdf2017 09 21 Appeal Revised LVIA Figure 3 Viewpoints A & B.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 4 Viewpoints C & D.pdf2017 09 21 Appeal Revised LVIA Figure 4 Viewpoints C & D.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 5 Viewpoints E & F.pdf2017 09 21 Appeal Revised LVIA Figure 5 Viewpoints E & F.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 6 Viewpoints G & H.pdf2017 09 21 Appeal Revised LVIA Figure 6 Viewpoints G & H.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 7 Viewpoints I & J.pdf2017 09 21 Appeal Revised LVIA Figure 7 Viewpoints I & J.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 8 Viewpoints K & L.pdf2017 09 21 Appeal Revised LVIA Figure 8 Viewpoints K & L.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 9 Viewpoints M & N.pdf2017 09 21 Appeal Revised LVIA Figure 9 Viewpoints M & N.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA_rev1.1.pdf2017 09 21 Appeal Revised LVIA_rev1.1.pdf ( kb)21 Sept 2017View
2017 09 22 Appeal Reg 22 Technical Note 1.pdf2017 09 22 Appeal Reg 22 Technical Note 1.pdf ( kb)25 Sept 2017View
2017 09 22 Appeal Reg 22 Technical Note 2.pdf2017 09 22 Appeal Reg 22 Technical Note 2.pdf ( kb)25 Sept 2017View
2017 09 22 Appeal revised Non Technical Summary 2017.pdf2017 09 22 Appeal revised Non Technical Summary 2017.pdf ( kb)25 Sept 2017View
2017 09 28 Derbyshire Times CM4-1215-125.pdf2017 09 28 Derbyshire Times CM4-1215-125.pdf ( kb)9 Oct 2017View
2017 11 01 APP-U1050-W-16-3166227 Statement of Common Ground - Noise.pdf2017 11 01 APP-U1050-W-16-3166227 Statement of Common Ground - Noise.pdf ( kb)14 Nov 2017View
2017 11 02 APP-U1050-W-16-3166227 DCC POE Kieran Gayler.pdf2017 11 02 APP-U1050-W-16-3166227 DCC POE Kieran Gayler.pdf ( kb)14 Nov 2017View
2017 11 02 APP-U1050-W-16-3166227 DCC POE Summary Kieran Gayler.pdf2017 11 02 APP-U1050-W-16-3166227 DCC POE Summary Kieran Gayler.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Allison Westray-Chapman.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Allison Westray-Chapman.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Gary Ellis.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Gary Ellis.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 1.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 1.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 2.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 2.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 3.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 3.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Allison Westray-Chapman.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Allison Westray-Chapman.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Gary Ellis.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Gary Ellis.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Justine Proudler.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Justine Proudler.pdf ( kb)14 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 Statement of Common Ground.pdf2017 11 03 APP-U1050-W-16-3166227 Statement of Common Ground.pdf ( kb)14 Nov 2017View
3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf ( kb)27 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf ( kb)27 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW statement.PDF3.2 APP-U1050-W-16-3166227 PROW statement.PDF ( kb)27 Apr 2017View
3.3 APP-U1050-W-16-3166227 TPO's.pdf3.3 APP-U1050-W-16-3166227 TPO's.pdf ( kb)27 Apr 2017View
4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf ( kb)27 Apr 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)27 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)27 Apr 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)27 Apr 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)27 Apr 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)27 Apr 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)27 Apr 2017View
4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf ( kb)27 Apr 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)27 Apr 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)27 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)27 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)27 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)27 Apr 2017View
5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf ( kb)27 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)27 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf ( kb)27 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)27 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)27 Apr 2017View
8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf ( kb)27 Apr 2017View
8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf ( kb)27 Apr 2017View
8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf ( kb)27 Apr 2017View
8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)27 Apr 2017View
8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf ( kb)27 Apr 2017View
8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf ( kb)27 Apr 2017View
8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf ( kb)27 Apr 2017View
8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf ( kb)27 Apr 2017View
8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf ( kb)27 Apr 2017View
8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf ( kb)27 Apr 2017View
8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf ( kb)27 Apr 2017View
8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf ( kb)27 Apr 2017View
8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf ( kb)27 Apr 2017View
8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf ( kb)27 Apr 2017View
8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf ( kb)27 Apr 2017View
8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf ( kb)27 Apr 2017View
8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf ( kb)27 Apr 2017View
8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf ( kb)27 Apr 2017View
8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf ( kb)27 Apr 2017View
8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf ( kb)27 Apr 2017View
8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf ( kb)27 Apr 2017View
8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf ( kb)27 Apr 2017View
8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf ( kb)27 Apr 2017View
8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf ( kb)27 Apr 2017View
8.32 APP-U1050-W-16-3166227.pdf8.32 APP-U1050-W-16-3166227.pdf ( kb)27 Apr 2017View
8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf ( kb)27 Apr 2017View
8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf ( kb)27 Apr 2017View
8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf ( kb)27 Apr 2017View
8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf ( kb)27 Apr 2017View
8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf ( kb)27 Apr 2017View
8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf ( kb)27 Apr 2017View
8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf ( kb)27 Apr 2017View
8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf ( kb)27 Apr 2017View
8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf ( kb)27 Apr 2017View
8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf ( kb)27 Apr 2017View
8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)27 Apr 2017View
8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)27 Apr 2017View
8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf ( kb)27 Apr 2017View
8.45 APP-U1050-W-16-3166227 2016 04 08.pdf8.45 APP-U1050-W-16-3166227 2016 04 08.pdf ( kb)27 Apr 2017View
8.46 APP-U1050-W-16-3166227.pdf8.46 APP-U1050-W-16-3166227.pdf ( kb)27 Apr 2017View
8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf ( kb)27 Apr 2017View
8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf ( kb)27 Apr 2017View
8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf ( kb)27 Apr 2017View
8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)27 Apr 2017View
8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf ( kb)27 Apr 2017View
8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf ( kb)27 Apr 2017View
8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf ( kb)27 Apr 2017View
8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf ( kb)27 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)27 Apr 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 1.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 1.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 2.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 2.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 3.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 3.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 4.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 4.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 5.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 5.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figures Cover Page.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figures Cover Page.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 1 Agenda for Meeting 18 Oct 17.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 1 Agenda for Meeting 18 Oct 17.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 2 Change for A61 Road Traffic Noise.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 2 Change for A61 Road Traffic Noise.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 3 08 01085OL Masterplan.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 3 08 01085OL Masterplan.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 4 08 01085OL Masterplan 1A.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 4 08 01085OL Masterplan 1A.pdf ( kb)14 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 5 Biwater Dwellings Table J.9a J.19a.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 5 Biwater Dwellings Table J.9a J.19a.pdf ( kb)14 Nov 2017View
APPELLANT 01 APPEAL FORM - 161965.pdfAPPELLANT 01 APPEAL FORM - 161965.pdf ( kb)27 Apr 2017View
APPELLANT Appendix A to Statement of Case - Oct 2016 Reg 22.pdfAPPELLANT Appendix A to Statement of Case - Oct 2016 Reg 22.pdf ( kb)27 Apr 2017View
APPELLANT Appendix B to Statement of Case - SHLAA Plan A4.pdfAPPELLANT Appendix B to Statement of Case - SHLAA Plan A4.pdf ( kb)27 Apr 2017View
APPELLANT Appendix C to Statement of Case-Regeneration impact.pdfAPPELLANT Appendix C to Statement of Case-Regeneration impact.pdf ( kb)27 Apr 2017View
APPELLANT Appendix D to Statement of case-3rd party objection.pdfAPPELLANT Appendix D to Statement of case-3rd party objection.pdf ( kb)27 Apr 2017View
APPELLANT Appendix E to Statement of Case-response Oct Reg 22.pdfAPPELLANT Appendix E to Statement of Case-response Oct Reg 22.pdf ( kb)27 Apr 2017View
APPELLANT Appendix F to Statement of Case - Dec Reg 22 info.pdfAPPELLANT Appendix F to Statement of Case - Dec Reg 22 info.pdf ( kb)27 Apr 2017View
APPELLANT Appendix G to Statement of Case Flood Risk clarification.pdfAPPELLANT Appendix G to Statement of Case Flood Risk clarification.pdf ( kb)27 Apr 2017View
APPELLANT Appendix H to Statement of Case Flood Team response.pdfAPPELLANT Appendix H to Statement of Case Flood Team response.pdf ( kb)27 Apr 2017View
APPELLANT Appendix I to Statement of Case-Planning Conditions.pdfAPPELLANT Appendix I to Statement of Case-Planning Conditions.pdf ( kb)27 Apr 2017View
APPELLANT List of Appendices to Statement of Case.pdfAPPELLANT List of Appendices to Statement of Case.pdf ( kb)27 Apr 2017View
APPELLANT List of documents.pdfAPPELLANT List of documents.pdf ( kb)27 Apr 2017View
APPELLANT Statement of Case.pdfAPPELLANT Statement of Case.pdf ( kb)27 Apr 2017View
Appendix 1 to Planning Proof letter from Fuel express.pdfAppendix 1 to Planning Proof letter from Fuel express.pdf ( kb)14 Nov 2017View
Appendix 10 to Planning Proof - excerpt from St Mod annual accounts 2016.pdfAppendix 10 to Planning Proof - excerpt from St Mod annual accounts 2016.pdf ( kb)14 Nov 2017View
Appendix 2 to Planning Proof Biwaters Planning Statement.pdfAppendix 2 to Planning Proof Biwaters Planning Statement.pdf ( kb)14 Nov 2017View
Appendix 3 to planing Proof - Field House decision.pdfAppendix 3 to planing Proof - Field House decision.pdf ( kb)14 Nov 2017View
Appendix 4 to Planning Proof Bradley Appeal Decision.pdfAppendix 4 to Planning Proof Bradley Appeal Decision.pdf ( kb)14 Nov 2017View
Appendix 5 to Planning Proof - Highthorn Planning Proof of Evidence.pdfAppendix 5 to Planning Proof - Highthorn Planning Proof of Evidence.pdf ( kb)14 Nov 2017View
Appendix 6 to Planning Proof - Halton Lea Gate decision.pdfAppendix 6 to Planning Proof - Halton Lea Gate decision.pdf ( kb)14 Nov 2017View
Appendix 7 to Planning proof- Details of White Noise alarms.pdfAppendix 7 to Planning proof- Details of White Noise alarms.pdf ( kb)14 Nov 2017View
Appendix 8 to Planning Proof - Excerpt from ES - 08-01805-OL.pdfAppendix 8 to Planning Proof - Excerpt from ES - 08-01805-OL.pdf ( kb)14 Nov 2017View
Appendix 9 to Planning proof - Construction noise limits.pdfAppendix 9 to Planning proof - Construction noise limits.pdf ( kb)14 Nov 2017View
Clay Cross - Opening.pdfClay Cross - Opening.pdf ( kb)30 Nov 2017View
Clay Cross Coal Mining Calcs Table J.2a & J.12a.pdfClay Cross Coal Mining Calcs Table J.2a & J.12a.pdf ( kb)30 Nov 2017View
comments from interested parties sent direct to PINS.pdfcomments from interested parties sent direct to PINS.pdf ( kb)6 Oct 2017View
DCC Figure 1 - Cuts 1 to 3.pdfDCC Figure 1 - Cuts 1 to 3.pdf ( kb)30 Nov 2017View
DCCresponsepdf.pdfDCCresponsepdf.pdf ( kb)30 Nov 2017View
DECISION NOTICE.pdfDECISION NOTICE.pdf ( kb)22 Mar 2018View
Dust Proof of Evidence.pdfDust Proof of Evidence.pdf ( kb)14 Nov 2017View
Figure JM1.pdfFigure JM1.pdf ( kb)14 Nov 2017View
Figure JM2.pdfFigure JM2.pdf ( kb)14 Nov 2017View
Figure JM3a Footpath 23 Images.pdfFigure JM3a Footpath 23 Images.pdf ( kb)14 Nov 2017View
Figure JM3b Footpath 26 Images.pdfFigure JM3b Footpath 26 Images.pdf ( kb)14 Nov 2017View
Figure JM4 Grass Establishment on Embankments.pdfFigure JM4 Grass Establishment on Embankments.pdf ( kb)14 Nov 2017View
Figure JM5.pdfFigure JM5.pdf ( kb)14 Nov 2017View
Figure JM6 Contextual Photographs.pdfFigure JM6 Contextual Photographs.pdf ( kb)14 Nov 2017View
Figure JM7a Biwater Site Images.pdfFigure JM7a Biwater Site Images.pdf ( kb)14 Nov 2017View
Figure JM7b Biwater Site Images.pdfFigure JM7b Biwater Site Images.pdf ( kb)14 Nov 2017View
Figure JM8a Off-Site Vegetation.pdfFigure JM8a Off-Site Vegetation.pdf ( kb)14 Nov 2017View
Figure JM8b Off-Site Vegetation.pdfFigure JM8b Off-Site Vegetation.pdf ( kb)14 Nov 2017View
Figure JM8c Off-Site Vegetation.pdfFigure JM8c Off-Site Vegetation.pdf ( kb)14 Nov 2017View
HILLTOP FARM - PROPOSED SURFACE COAL MINING SCHEME - CBRE - PROOF OF EVI....pdfHILLTOP FARM - PROPOSED SURFACE COAL MINING SCHEME - CBRE - PROOF OF EVI....pdf ( kb)14 Nov 2017View
Hilltop Farm Landscape -Visual Summary Proof.pdfHilltop Farm Landscape -Visual Summary Proof.pdf ( kb)14 Nov 2017View
Hilltop Farm Landscape-Visual Proof.pdfHilltop Farm Landscape-Visual Proof.pdf ( kb)14 Nov 2017View
Landscape - Visual Appendix _1.pdfLandscape - Visual Appendix _1.pdf ( kb)14 Nov 2017View
Noise Evidence for Appellant 03.11.17.pdfNoise Evidence for Appellant 03.11.17.pdf ( kb)14 Nov 2017View
Planning PoE R Hunt.pdfPlanning PoE R Hunt.pdf ( kb)14 Nov 2017View
Proof of evidence - M Walton - FINAL.PDFProof of evidence - M Walton - FINAL.PDF ( kb)14 Nov 2017View
Proof of evidence - SUMMARY - M Walton - FINAL.PDFProof of evidence - SUMMARY - M Walton - FINAL.PDF ( kb)14 Nov 2017View
QUESTIONNAIRE - 208866.pdfQUESTIONNAIRE - 208866.pdf ( kb)4 May 2017View
Rebuttal 17.11.2017 Hilltop Farm-FINAL(004).pdfRebuttal 17.11.2017 Hilltop Farm-FINAL(004).pdf ( kb)21 Nov 2017View
Rebuttal APP-U1050-W-16-3166227 POE Justine App1.pdfRebuttal APP-U1050-W-16-3166227 POE Justine App1.pdf ( kb)21 Nov 2017View
Rebuttal APP-U1050-W-16-3166227 POE Justine App3.pdfRebuttal APP-U1050-W-16-3166227 POE Justine App3.pdf ( kb)21 Nov 2017View
Rebuttal Appellant Noise App A Noise Effects.pdfRebuttal Appellant Noise App A Noise Effects.pdf ( kb)21 Nov 2017View
Rebuttal Appellant Planning.pdfRebuttal Appellant Planning.pdf ( kb)21 Nov 2017View
Rebuttal Appellant Regeneration App 1.pdfRebuttal Appellant Regeneration App 1.pdf ( kb)21 Nov 2017View
Rebuttal Appellant Regeneration App1-2.pdfRebuttal Appellant Regeneration App1-2.pdf ( kb)21 Nov 2017View
Rebuttal Appellant Regeneration.pdfRebuttal Appellant Regeneration.pdf ( kb)21 Nov 2017View
rebuttal-2017 11 17 APP-U1050-W-16-3166227 POE Justine.pdfrebuttal-2017 11 17 APP-U1050-W-16-3166227 POE Justine.pdf ( kb)21 Nov 2017View
rebuttal-Appellant Air Quality.pdfrebuttal-Appellant Air Quality.pdf ( kb)21 Nov 2017View
Rebuttal-Appellant Landscape Visual.pdfRebuttal-Appellant Landscape Visual.pdf ( kb)21 Nov 2017View
Rebuttal-Appellant Noise 17.11.17.pdfRebuttal-Appellant Noise 17.11.17.pdf ( kb)21 Nov 2017View
RebuttalAPP-U1050-W-16-3166227 POE Justine App2.pdfRebuttalAPP-U1050-W-16-3166227 POE Justine App2.pdf ( kb)21 Nov 2017View
RebuttalCD66 Hilltop Dwellings by Calculation Locations.pdfRebuttalCD66 Hilltop Dwellings by Calculation Locations.pdf ( kb)21 Nov 2017View
Reg 22 LRES CM4-1215-125_Redacted.pdfReg 22 LRES CM4-1215-125_Redacted.pdf ( kb)14 Nov 2017View
Regeneration Proof Final 03.11.17.pdfRegeneration Proof Final 03.11.17.pdf ( kb)14 Nov 2017View
Response to Pre-Inquiry Note 01 (Part 1) 27.11.17.pdfResponse to Pre-Inquiry Note 01 (Part 1) 27.11.17.pdf ( kb)30 Nov 2017View
Response to Pre-inquiry Note 01 (Part 2) 27.11.17.pdfResponse to Pre-inquiry Note 01 (Part 2) 27.11.17.pdf ( kb)30 Nov 2017View
SUMMARY OF CBRE PROOF OF EVIDENCE.AW.PDFSUMMARY OF CBRE PROOF OF EVIDENCE.AW.PDF ( kb)14 Nov 2017View
Summary of Planning Proof (Final).pdfSummary of Planning Proof (Final).pdf ( kb)14 Nov 2017View
2017 09 21 Appeal Reg 22 submision 17929-SK-004 rev A.pdf2017 09 21 Appeal Reg 22 submision 17929-SK-004 rev A.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submision Technical Note 3 - Draft.pdf2017 09 21 Appeal Reg 22 submision Technical Note 3 - Draft.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submisison Fig 3 Tree Retention Plan 5171-A-05 revC.pdf2017 09 21 Appeal Reg 22 submisison Fig 3 Tree Retention Plan 5171-A-05 revC.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission 170921 Reg 22 covering letter.pdf2017 09 21 Appeal Reg 22 submission 170921 Reg 22 covering letter.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission Appendix A to Technical Note 2 - Hill Top Quantities.pdf2017 09 21 Appeal Reg 22 submission Appendix A to Technical Note 2 - Hill Top Quantities.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submission PINS Reg 22 Noise Response 21 Aug 17.pdf2017 09 21 Appeal Reg 22 submission PINS Reg 22 Noise Response 21 Aug 17.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Reg 22 submssion Enclosure to Technical Note 2 - Bulking data.pdf2017 09 21 Appeal Reg 22 submssion Enclosure to Technical Note 2 - Bulking data.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised Figure 11 Viewpoints Q & R.pdf2017 09 21 Appeal Revised Figure 11 Viewpoints Q & R.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 1 LVIA Methodology.pdf2017 09 21 Appeal Revised LVIA Appendix 1 LVIA Methodology.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 2 Vehicle Photographs.pdf2017 09 21 Appeal Revised LVIA Appendix 2 Vehicle Photographs.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 3 Effects on Landscape Character_rev0.3.pdf2017 09 21 Appeal Revised LVIA Appendix 3 Effects on Landscape Character_rev0.3.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Appendix 4 Visual Effects_rev1.1.pdf2017 09 21 Appeal Revised LVIA Appendix 4 Visual Effects_rev1.1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal revised LVIA Assessment Comparisons v1.pdf2017 09 21 Appeal revised LVIA Assessment Comparisons v1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 10 Viewpoints O & P.pdf2017 09 21 Appeal Revised LVIA Figure 10 Viewpoints O & P.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1a Phasing Sheet 1.pdf2017 09 21 Appeal Revised LVIA Figure 1a Phasing Sheet 1.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1b Phasing Sheet 2.pdf2017 09 21 Appeal Revised LVIA Figure 1b Phasing Sheet 2.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 1c Phasing Sheet 3.pdf2017 09 21 Appeal Revised LVIA Figure 1c Phasing Sheet 3.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 2 Site Context_0.2.pdf2017 09 21 Appeal Revised LVIA Figure 2 Site Context_0.2.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 3 Viewpoints A & B.pdf2017 09 21 Appeal Revised LVIA Figure 3 Viewpoints A & B.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 4 Viewpoints C & D.pdf2017 09 21 Appeal Revised LVIA Figure 4 Viewpoints C & D.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 5 Viewpoints E & F.pdf2017 09 21 Appeal Revised LVIA Figure 5 Viewpoints E & F.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 6 Viewpoints G & H.pdf2017 09 21 Appeal Revised LVIA Figure 6 Viewpoints G & H.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 7 Viewpoints I & J.pdf2017 09 21 Appeal Revised LVIA Figure 7 Viewpoints I & J.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 8 Viewpoints K & L.pdf2017 09 21 Appeal Revised LVIA Figure 8 Viewpoints K & L.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA Figure 9 Viewpoints M & N.pdf2017 09 21 Appeal Revised LVIA Figure 9 Viewpoints M & N.pdf ( kb)21 Sept 2017View
2017 09 21 Appeal Revised LVIA_rev1.1.pdf2017 09 21 Appeal Revised LVIA_rev1.1.pdf ( kb)21 Sept 2017View
2017 09 22 Appeal Reg 22 Technical Note 1.pdf2017 09 22 Appeal Reg 22 Technical Note 1.pdf ( kb)25 Sept 2017View
2017 09 22 Appeal Reg 22 Technical Note 2.pdf2017 09 22 Appeal Reg 22 Technical Note 2.pdf ( kb)25 Sept 2017View
2017 09 22 Appeal revised Non Technical Summary 2017.pdf2017 09 22 Appeal revised Non Technical Summary 2017.pdf ( kb)25 Sept 2017View
comments from interested parties sent direct to PINS.pdfcomments from interested parties sent direct to PINS.pdf ( kb)6 Oct 2017View
2017 04 26 Covering letter.pdf2017 04 26 Covering letter.pdf ( kb)26 Apr 2017View
2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf ( kb)26 Apr 2017View
1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf ( kb)25 Apr 2017View
1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf ( kb)25 Apr 2017View
1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf ( kb)25 Apr 2017View
1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf ( kb)25 Apr 2017View
10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf ( kb)26 Apr 2017View
2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf ( kb)26 Apr 2017View
2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf ( kb)26 Apr 2017View
3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf ( kb)26 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf ( kb)26 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW statement.PDF3.2 APP-U1050-W-16-3166227 PROW statement.PDF ( kb)26 Apr 2017View
3.3 APP-U1050-W-16-3166227 TPO's.pdf3.3 APP-U1050-W-16-3166227 TPO's.pdf ( kb)26 Apr 2017View
4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf ( kb)26 Apr 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)26 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)26 Apr 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)26 Apr 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)26 Apr 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)26 Apr 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)26 Apr 2017View
4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf ( kb)26 Apr 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)26 Apr 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)26 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)26 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)26 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)26 Apr 2017View
5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf ( kb)26 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)26 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf ( kb)26 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)26 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)26 Apr 2017View
8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf ( kb)26 Apr 2017View
8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf ( kb)26 Apr 2017View
8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf ( kb)26 Apr 2017View
8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)26 Apr 2017View
8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf ( kb)26 Apr 2017View
8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf ( kb)26 Apr 2017View
8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf ( kb)26 Apr 2017View
8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf ( kb)26 Apr 2017View
8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf ( kb)26 Apr 2017View
8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf ( kb)26 Apr 2017View
8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf ( kb)26 Apr 2017View
8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf ( kb)26 Apr 2017View
8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf ( kb)26 Apr 2017View
8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf ( kb)26 Apr 2017View
8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf ( kb)26 Apr 2017View
8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf ( kb)26 Apr 2017View
8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf ( kb)26 Apr 2017View
8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf ( kb)26 Apr 2017View
8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf ( kb)26 Apr 2017View
8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf ( kb)26 Apr 2017View
8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf ( kb)26 Apr 2017View
8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf ( kb)26 Apr 2017View
8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf ( kb)26 Apr 2017View
8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf ( kb)26 Apr 2017View
8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf ( kb)26 Apr 2017View
8.32 APP-U1050-W-16-3166227.pdf8.32 APP-U1050-W-16-3166227.pdf ( kb)26 Apr 2017View
8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf ( kb)26 Apr 2017View
8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf ( kb)26 Apr 2017View
8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf ( kb)26 Apr 2017View
8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf ( kb)26 Apr 2017View
8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf ( kb)26 Apr 2017View
8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf ( kb)26 Apr 2017View
8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf ( kb)26 Apr 2017View
8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf ( kb)26 Apr 2017View
8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf ( kb)26 Apr 2017View
8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf ( kb)26 Apr 2017View
8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)26 Apr 2017View
8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)26 Apr 2017View
8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf ( kb)26 Apr 2017View
8.45 APP-U1050-W-16-3166227 2016 04 08.pdf8.45 APP-U1050-W-16-3166227 2016 04 08.pdf ( kb)26 Apr 2017View
8.46 APP-U1050-W-16-3166227.pdf8.46 APP-U1050-W-16-3166227.pdf ( kb)26 Apr 2017View
8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf ( kb)26 Apr 2017View
8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf ( kb)26 Apr 2017View
8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf ( kb)26 Apr 2017View
8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)26 Apr 2017View
8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf ( kb)26 Apr 2017View
8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf ( kb)26 Apr 2017View
8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf ( kb)26 Apr 2017View
8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf ( kb)26 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)26 Apr 2017View
2017 04 26 Covering letter.pdf2017 04 26 Covering letter.pdf ( kb)26 Apr 2017View
1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf ( kb)26 Apr 2017View
1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf ( kb)26 Apr 2017View
1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf ( kb)26 Apr 2017View
1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf ( kb)26 Apr 2017View
10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf ( kb)25 Apr 2017View
2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf ( kb)25 Apr 2017View
2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf ( kb)25 Apr 2017View
3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf ( kb)25 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf ( kb)26 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW statement.PDF3.2 APP-U1050-W-16-3166227 PROW statement.PDF ( kb)26 Apr 2017View
3.3 APP-U1050-W-16-3166227 TPO's.pdf3.3 APP-U1050-W-16-3166227 TPO's.pdf ( kb)26 Apr 2017View
4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf ( kb)25 Apr 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)25 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)25 Apr 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)25 Apr 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)25 Apr 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)25 Apr 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)25 Apr 2017View
4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf ( kb)25 Apr 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)25 Apr 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)25 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)25 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)25 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)25 Apr 2017View
5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf ( kb)25 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)25 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)25 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf ( kb)25 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf ( kb)25 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf ( kb)25 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)25 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)25 Apr 2017View
8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf ( kb)25 Apr 2017View
8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf ( kb)25 Apr 2017View
8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf ( kb)25 Apr 2017View
8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)25 Apr 2017View
8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf ( kb)25 Apr 2017View
8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf ( kb)25 Apr 2017View
8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf ( kb)25 Apr 2017View
8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf ( kb)25 Apr 2017View
8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf ( kb)25 Apr 2017View
8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf ( kb)25 Apr 2017View
8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf ( kb)25 Apr 2017View
8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf ( kb)25 Apr 2017View
8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf ( kb)25 Apr 2017View
8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf ( kb)25 Apr 2017View
8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf ( kb)25 Apr 2017View
8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf ( kb)25 Apr 2017View
8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf ( kb)25 Apr 2017View
8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf ( kb)25 Apr 2017View
8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf ( kb)25 Apr 2017View
8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf ( kb)25 Apr 2017View
8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf ( kb)25 Apr 2017View
8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf ( kb)25 Apr 2017View
8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf ( kb)25 Apr 2017View
8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf ( kb)25 Apr 2017View
8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf ( kb)25 Apr 2017View
8.32 APP-U1050-W-16-3166227.pdf8.32 APP-U1050-W-16-3166227.pdf ( kb)25 Apr 2017View
8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf ( kb)25 Apr 2017View
8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf ( kb)25 Apr 2017View
8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf ( kb)25 Apr 2017View
8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf ( kb)25 Apr 2017View
8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf ( kb)25 Apr 2017View
8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf ( kb)25 Apr 2017View
8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf ( kb)25 Apr 2017View
8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf ( kb)25 Apr 2017View
8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf ( kb)25 Apr 2017View
8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf ( kb)25 Apr 2017View
8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)25 Apr 2017View
8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)25 Apr 2017View
8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf ( kb)25 Apr 2017View
8.45 APP-U1050-W-16-3166227 2016 04 08.pdf8.45 APP-U1050-W-16-3166227 2016 04 08.pdf ( kb)25 Apr 2017View
8.46 APP-U1050-W-16-3166227.pdf8.46 APP-U1050-W-16-3166227.pdf ( kb)25 Apr 2017View
8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf ( kb)25 Apr 2017View
8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf ( kb)25 Apr 2017View
8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf ( kb)25 Apr 2017View
8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)25 Apr 2017View
8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf ( kb)25 Apr 2017View
8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf ( kb)25 Apr 2017View
8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf ( kb)25 Apr 2017View
8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf ( kb)25 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)25 Apr 2017View
2017 04 26 Covering letter.pdf2017 04 26 Covering letter.pdf ( kb)26 Apr 2017View
1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf ( kb)26 Apr 2017View
1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf ( kb)26 Apr 2017View
1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf ( kb)26 Apr 2017View
10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf ( kb)26 Apr 2017View
2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf ( kb)26 Apr 2017View
2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf ( kb)26 Apr 2017View
3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf ( kb)26 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf ( kb)26 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW statement.PDF3.2 APP-U1050-W-16-3166227 PROW statement.PDF ( kb)26 Apr 2017View
3.3 APP-U1050-W-16-3166227 TPO's.pdf3.3 APP-U1050-W-16-3166227 TPO's.pdf ( kb)26 Apr 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)26 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)26 Apr 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)26 Apr 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)26 Apr 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)26 Apr 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)26 Apr 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)26 Apr 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)26 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)26 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)26 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)26 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)26 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf ( kb)26 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf ( kb)26 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)26 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)26 Apr 2017View
8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf ( kb)26 Apr 2017View
8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf ( kb)26 Apr 2017View
8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf ( kb)26 Apr 2017View
8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)26 Apr 2017View
8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf ( kb)26 Apr 2017View
8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf ( kb)26 Apr 2017View
8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf ( kb)26 Apr 2017View
8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf ( kb)26 Apr 2017View
8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf ( kb)26 Apr 2017View
8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf ( kb)26 Apr 2017View
8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf ( kb)26 Apr 2017View
8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf ( kb)26 Apr 2017View
8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf ( kb)26 Apr 2017View
8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf ( kb)26 Apr 2017View
8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf ( kb)26 Apr 2017View
8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf ( kb)26 Apr 2017View
8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf ( kb)26 Apr 2017View
8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf ( kb)26 Apr 2017View
8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf ( kb)26 Apr 2017View
8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf ( kb)26 Apr 2017View
8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf ( kb)26 Apr 2017View
8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf ( kb)26 Apr 2017View
8.32 APP-U1050-W-16-3166227.pdf8.32 APP-U1050-W-16-3166227.pdf ( kb)26 Apr 2017View
8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf ( kb)26 Apr 2017View
8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf ( kb)26 Apr 2017View
8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf ( kb)26 Apr 2017View
8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf ( kb)26 Apr 2017View
8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf ( kb)26 Apr 2017View
8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf ( kb)26 Apr 2017View
8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf ( kb)26 Apr 2017View
8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)26 Apr 2017View
8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)26 Apr 2017View
8.45 APP-U1050-W-16-3166227 2016 04 08.pdf8.45 APP-U1050-W-16-3166227 2016 04 08.pdf ( kb)26 Apr 2017View
8.46 APP-U1050-W-16-3166227.pdf8.46 APP-U1050-W-16-3166227.pdf ( kb)26 Apr 2017View
8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf ( kb)26 Apr 2017View
8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf ( kb)26 Apr 2017View
8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf ( kb)26 Apr 2017View
8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)26 Apr 2017View
8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf ( kb)26 Apr 2017View
8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf ( kb)26 Apr 2017View
8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf ( kb)26 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)26 Apr 2017View
pla-17929-SK-002 rev B.pdfpla-17929-SK-002 rev B.pdf ( kb)11 Jan 2017View
pla-17929-SK-004 rev a.pdfpla-17929-SK-004 rev a.pdf ( kb)11 Jan 2017View
pla-17929-SK-201 Rev B.pdfpla-17929-SK-201 Rev B.pdf ( kb)11 Jan 2017View
pla-5171-L-01 Landscape Restoration Plan E.pdfpla-5171-L-01 Landscape Restoration Plan E.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-14-02 v4 Site Plan.pdfpla-GPP-P-HF-14-02 v4 Site Plan.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-14-07 HGV Routing Plan.pdfpla-GPP-P-HF-14-07 HGV Routing Plan.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-14-17 v4 Processing Area.pdfpla-GPP-P-HF-14-17 v4 Processing Area.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdfpla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdfpla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdf ( kb)11 Jan 2017View
pla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdfpla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdf ( kb)11 Jan 2017View
pla-MER00290-002-001 to 003 REVA-1.pdfpla-MER00290-002-001 to 003 REVA-1.pdf ( kb)11 Jan 2017View
pla-P009-01 Site Location Plan v2.pdfpla-P009-01 Site Location Plan v2.pdf ( kb)11 Jan 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)25 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)1 Feb 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)1 Feb 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)1 Feb 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)14 Feb 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)1 Feb 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)1 Feb 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)25 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)25 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)25 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)24 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)24 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)27 Mar 2017View
1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf1.1 APP-U1050-W-16-3166227 Supp 2016 07 28 Reg 22 Response.pdf ( kb)27 Apr 2017View
1.2 APP-U1050-W-16-3166227 2016 07 26 NetworkRail cons response.pdf1.2 APP-U1050-W-16-3166227 2016 07 26 NetworkRail cons response.pdf ( kb)27 Apr 2017View
1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf1.3 APP-U1050-W-16-3166227sup 2016 07 27 Further Info Letter .pdf ( kb)27 Apr 2017View
1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf1.4 APP-U1050-W-16-31662272016 03 16 Add Info Site Offices.pdf ( kb)27 Apr 2017View
1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf1.5 APP-U1050-W-16-3166227frm-Certificates Updated.pdf ( kb)27 Apr 2017View
10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf10.1 APP-U1050-W-16-3166227 2017 04 10 Mins 17 Mar 2017.pdf ( kb)27 Apr 2017View
2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf2.1 APP-U1050-W-16-3166227 2016 01 05 Invalid Letter 03 CM4-1215-125.pdf ( kb)27 Apr 2017View
2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf2.2 APP-U1050-W-16-31662272016 01 26 TCP2 03 CM4-1215-125.pdf ( kb)27 Apr 2017View
2017 04 26 Covering letter.pdf2017 04 26 Covering letter.pdf ( kb)27 Apr 2017View
2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf2017 04 26 Hilltop Farm - Appeal details to NEDDC CM4-1215-125.pdf ( kb)27 Apr 2017View
3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf3.1 APP-U1050-W-16-3166227-APPENDIX 1 Scoping Opinion.pdf ( kb)27 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf3.2 APP-U1050-W-16-3166227 PROW Definitive map.pdf ( kb)27 Apr 2017View
3.2 APP-U1050-W-16-3166227 PROW statement.PDF3.2 APP-U1050-W-16-3166227 PROW statement.PDF ( kb)27 Apr 2017View
3.3 APP-U1050-W-16-3166227 TPO's.pdf3.3 APP-U1050-W-16-3166227 TPO's.pdf ( kb)27 Apr 2017View
4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf4.1 APP-U1050-W-16-3166227 2016 02 03 Site & Neighbour nots locations.pdf ( kb)27 Apr 2017View
4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf4.10 APP-U1050-W-16-3166227 2017 02 22 Reg 22 site notice.pdf ( kb)27 Apr 2017View
4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf4.2 APP-U1050-W-16-3166227 2016 02 03 neighbour notiification.pdf ( kb)27 Apr 2017View
4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf4.3 APP-U1050-W-16-3166227 2016 02 03 Site Notice.pdf ( kb)27 Apr 2017View
4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf4.4 APP-U1050-W-16-3166227 2016 02 11 Derbyshire Times advert.pdf ( kb)27 Apr 2017View
4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf4.5 APP-U1050-W-16-3166227 2016 02 11 Press Notice.pdf ( kb)27 Apr 2017View
4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf4.6 APP-U1050-W-16-3166227 2016 08 11 Press Advert Reg 22.pdf ( kb)27 Apr 2017View
4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf4.7 APP-U1050-W-16-3166227 2016 08 11 Site Notice Locations Reg22.pdf ( kb)27 Apr 2017View
4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf4.8 APP-U1050-W-16-3166227 2016 08 11 Site notice Reg 22.pdf ( kb)27 Apr 2017View
4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf4.9 APP-U1050-W-16-3166227 2017 02 23 Reg 22 Press notice.pdf ( kb)27 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)27 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)27 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)27 Apr 2017View
5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf ( kb)27 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)27 Apr 2017View
6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf6.1 APP-U1050-W-16-3166227 cons responses CM4-1215-125.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 1 CM4-1014-79.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 2 CM4-1014-79.pdf ( kb)27 Apr 2017View
6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf6.2 APP-U1050-W-16-3166227 Cons responses 3 CM4-1014-79.pdf ( kb)27 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)27 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)27 Apr 2017View
8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf8.1 APP-U1050-W-16-3166227 2017 03 05 statement from App.pdf ( kb)27 Apr 2017View
8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf8.10 APP-U1050-W-16-3166227 2016 06 24 CO - APP agree ext of time.pdf ( kb)27 Apr 2017View
8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf8.11 APP-U1050-W-16-3166227 2016 07 15 agree ext of time reg 22.pdf ( kb)27 Apr 2017View
8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.12 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)27 Apr 2017View
8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf8.13 APP-U1050-W-16-3166227 2016 03 14 APP - TL restoration bond.pdf ( kb)27 Apr 2017View
8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf8.14 APP-U1050-W-16-316 2016 12 05 CO - APP carrying fwd objections.pdf ( kb)27 Apr 2017View
8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf8.15 APP-U1050-W-16-3166227 2016 03 17 CO - Highway.pdf ( kb)27 Apr 2017View
8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf8.16 APP-U1050-W-16-3166227 2016 08 11 CO -HAG update.pdf ( kb)27 Apr 2017View
8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf8.17 APP-U1050-W-16-3166227 2016 04 13 CO - APP LLFA response.pdf ( kb)27 Apr 2017View
8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf8.18 APP-U1050-W-16-3166227 2016 04 14 APP response to Tonkin letter.pdf ( kb)27 Apr 2017View
8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf8.19 APP-U1050-W-16-3166227 2016 04 18 APP-CO response to Landscape.pdf ( kb)27 Apr 2017View
8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf8.2 APP-U1050-W-16-3166227 2016 12 21 LLFA - AGT.pdf ( kb)27 Apr 2017View
8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf8.20 APP-U1050-W-16-3166227 2016 05 11 CO - APP re determination date.pdf ( kb)27 Apr 2017View
8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf8.21 APP-U1050-W-16-3166227 2016 05 26 CO - HAG.pdf ( kb)27 Apr 2017View
8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf8.22 APP-U1050-W-16-3166227 2016 06 13 TL - APP Bond calc.pdf ( kb)27 Apr 2017View
8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf8.23 APP-U1050-W-16-3166227 2016 07 18 TL - APP re network rail issues.pdf ( kb)27 Apr 2017View
8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf8.24 APP-U1050-W-16-3166227 2016 07 26 CO - APP re update - responses.pdf ( kb)27 Apr 2017View
8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf8.25 APP-U1050-W-16-3166227 2016 07 26 Network Rail -CO response & cons.pdf ( kb)27 Apr 2017View
8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf8.26 APP-U1050-W-16-3166227 2016 08 03 Ext of time request.pdf ( kb)27 Apr 2017View
8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf8.27 APP-U1050-W-16-3166227 2016 08 12 AGT - CO agree ext of time.pdf ( kb)27 Apr 2017View
8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf8.28 APP-U1050-W-16-3166227 2016 09 09 APP - CO re restoration bond.pdf ( kb)27 Apr 2017View
8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf8.29 APP-U1050-W-16-3166227 2016 09 16 Flood team-CO.pdf ( kb)27 Apr 2017View
8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf8.3 APP-U1050-W-16-3166227 2017 01 09 Legal letter to PINS.pdf ( kb)27 Apr 2017View
8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf8.30 APP-U1050-W-16-3166227 2016 09 21 LLFA - CO FRA issues.pdf ( kb)27 Apr 2017View
8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf8.31 APP-U1050-W-16-3166227 2016 09 26 CO - APP update.pdf ( kb)27 Apr 2017View
8.32 APP-U1050-W-16-3166227.pdf8.32 APP-U1050-W-16-3166227.pdf ( kb)27 Apr 2017View
8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf8.33 APP-U1050-W-16-3166227 2016 10 31 APP - CO re new agent.pdf ( kb)27 Apr 2017View
8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf8.34 APP-U1050-W-16-3166227 2016 11 04 AGT - LLFA.pdf ( kb)27 Apr 2017View
8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf8.35 APP-U1050-W-16-3166227 2016 11 04 LLFA - CO re meeting AGT.pdf ( kb)27 Apr 2017View
8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf8.36 APP-U1050-W-16-3166227 20162016 11 7 AGT - CO re Reg 22 request.pdf ( kb)27 Apr 2017View
8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf8.37 APP-U1050-W-16-3166227 20162016 11 14 APP-CO Notification appeal.pdf ( kb)27 Apr 2017View
8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf8.38 APP-U1050-W-16-3166227 20162016 11 14 CO _AGT acknowledgement.pdf ( kb)27 Apr 2017View
8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf8.39 APP-U1050-W-16-31662272016 2016 11 22 CO - AGT re letter update.pdf ( kb)27 Apr 2017View
8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf8.4 APP-U1050-W-16-3166227 2016 01 04 CO - APP application errors.pdf ( kb)27 Apr 2017View
8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf8.40 APP-U1050-W-16-3166227 20162016 11 23 CO-GT SoCG & rest bond.pdf ( kb)27 Apr 2017View
8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf8.41 APP-U1050-W-16-3166227 20162016 11 30 LLFA - CO update Reg 22.pdf ( kb)27 Apr 2017View
8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.42 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)27 Apr 2017View
8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf8.43 APP-U1050-W-16-3166227 2016 01 21 APP - CO re letter from HoPS.pdf ( kb)27 Apr 2017View
8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf8.44 APP-U1050-W-16-3166227 2016 03 11 APP-CO re Highway comments.pdf ( kb)27 Apr 2017View
8.45 APP-U1050-W-16-3166227 2016 04 08.pdf8.45 APP-U1050-W-16-3166227 2016 04 08.pdf ( kb)27 Apr 2017View
8.46 APP-U1050-W-16-3166227.pdf8.46 APP-U1050-W-16-3166227.pdf ( kb)27 Apr 2017View
8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf8.47 APP-U1050-W-16-3166227 2016 04 27 File note & Meeting Agenda.pdf ( kb)27 Apr 2017View
8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf8.48 APP-U1050-W-16-3166227 2016 07 28 CO - AGT re Network Rail.pdf ( kb)27 Apr 2017View
8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf8.49 APP-U1050-W-16-3166227 2016 08 01 Add info covering email.pdf ( kb)27 Apr 2017View
8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf8.5 APP-U1050-W-16-3166227 2016 01 06 APP - CO re site office location.pdf ( kb)27 Apr 2017View
8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf8.6 APP-U1050-W-16-3166227 2016 01 20 APP CO Incorrect Numbering.pdf ( kb)27 Apr 2017View
8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf8.7 APP-U105-W-16-3166227 2016 04 20 CO - APP LLFA comments meeting.pdf ( kb)27 Apr 2017View
8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf8.8 APP-U1050-W-16-316622 2016 06 24 Email CO - APP agree ext of time.pdf ( kb)27 Apr 2017View
8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf8.9 APP-U1050-W-16-3166227 2016 04 25 APP - CO Add Info.pdf ( kb)27 Apr 2017View
9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf9.1 APP-U1050-W-16-3166227 2017.03.17 Committee report.pdf ( kb)27 Apr 2017View
APPELLANT 01 APPEAL FORM - 161965.pdfAPPELLANT 01 APPEAL FORM - 161965.pdf ( kb)27 Apr 2017View
APPELLANT Appendix A to Statement of Case - Oct 2016 Reg 22.pdfAPPELLANT Appendix A to Statement of Case - Oct 2016 Reg 22.pdf ( kb)27 Apr 2017View
APPELLANT Appendix B to Statement of Case - SHLAA Plan A4.pdfAPPELLANT Appendix B to Statement of Case - SHLAA Plan A4.pdf ( kb)27 Apr 2017View
APPELLANT Appendix C to Statement of Case-Regeneration impact.pdfAPPELLANT Appendix C to Statement of Case-Regeneration impact.pdf ( kb)27 Apr 2017View
APPELLANT Appendix D to Statement of case-3rd party objection.pdfAPPELLANT Appendix D to Statement of case-3rd party objection.pdf ( kb)27 Apr 2017View
APPELLANT Appendix E to Statement of Case-response Oct Reg 22.pdfAPPELLANT Appendix E to Statement of Case-response Oct Reg 22.pdf ( kb)27 Apr 2017View
APPELLANT Appendix F to Statement of Case - Dec Reg 22 info.pdfAPPELLANT Appendix F to Statement of Case - Dec Reg 22 info.pdf ( kb)27 Apr 2017View
APPELLANT Appendix G to Statement of Case Flood Risk clarification.pdfAPPELLANT Appendix G to Statement of Case Flood Risk clarification.pdf ( kb)27 Apr 2017View
APPELLANT Appendix H to Statement of Case Flood Team response.pdfAPPELLANT Appendix H to Statement of Case Flood Team response.pdf ( kb)27 Apr 2017View
APPELLANT Appendix I to Statement of Case-Planning Conditions.pdfAPPELLANT Appendix I to Statement of Case-Planning Conditions.pdf ( kb)27 Apr 2017View
APPELLANT List of Appendices to Statement of Case.pdfAPPELLANT List of Appendices to Statement of Case.pdf ( kb)27 Apr 2017View
APPELLANT List of documents.pdfAPPELLANT List of documents.pdf ( kb)27 Apr 2017View
APPELLANT Statement of Case.pdfAPPELLANT Statement of Case.pdf ( kb)27 Apr 2017View
5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf5.1 APP-U1050-W-16-3166227 2016 04 28 REG 22 Letter.pdf ( kb)27 Apr 2017View
5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf5.2 APP-U1050-W-16-3166227 2016 10 12 Email Regulation 22 request.pdf ( kb)27 Apr 2017View
5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf5.3 APP-U1050-W-16-3166227 2016 10 12 Regulation 22 letter.pdf ( kb)27 Apr 2017View
5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf5.4 APP-U1050-W-16-3166227 2016 10 25 AGT-CO Advised supply Reg 22.pdf ( kb)27 Apr 2017View
5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf5.5 APP-U1050-W-16-3166227 2016 12 08 CO - APP re Reg 22 request.pdf ( kb)27 Apr 2017View
7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf7.1 APP-U1050-W-16-3166227 LRES CM4-1215-125 redacted.pdf ( kb)27 Apr 2017View
7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf7.2 APP-U1050-W-16-3166227 LRESCM4-1014-79 redacted.pdf ( kb)27 Apr 2017View
sup 2016 07 01 Hilltop Farm FRA Final Report.pdfsup 2016 07 01 Hilltop Farm FRA Final Report.pdf ( kb)4 Jan 2017View
DCC Figure 1 - Cuts 1 to 3.pdfDCC Figure 1 - Cuts 1 to 3.pdf ( kb)27 Nov 2017View
DCCresponsepdf.pdfDCCresponsepdf.pdf ( kb)27 Nov 2017View
2017 11 01 APP-U1050-W-16-3166227 Statement of Common Ground - Noise.pdf2017 11 01 APP-U1050-W-16-3166227 Statement of Common Ground - Noise.pdf ( kb)3 Nov 2017View
2017 11 02 APP-U1050-W-16-3166227 DCC POE Kieran Gayler.pdf2017 11 02 APP-U1050-W-16-3166227 DCC POE Kieran Gayler.pdf ( kb)3 Nov 2017View
2017 11 02 APP-U1050-W-16-3166227 DCC POE Summary Kieran Gayler.pdf2017 11 02 APP-U1050-W-16-3166227 DCC POE Summary Kieran Gayler.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Allison Westray-Chapman.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Allison Westray-Chapman.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Gary Ellis.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Gary Ellis.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 1.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 1.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 2.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 2.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 3.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler Appendix 3.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Justine Proudler.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Allison Westray-Chapman.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Allison Westray-Chapman.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Gary Ellis.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Gary Ellis.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Justine Proudler.pdf2017 11 03 APP-U1050-W-16-3166227 DCC POE Summary Justine Proudler.pdf ( kb)3 Nov 2017View
2017 11 03 APP-U1050-W-16-3166227 Statement of Common Ground.pdf2017 11 03 APP-U1050-W-16-3166227 Statement of Common Ground.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 1.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 1.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 2.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 2.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 3.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 3.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 4.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 4.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 5.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figure 5.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figures Cover Page.pdfAPP-U1050-W-16-3166227 DCC Figures appended to POE Gary Ellis Figures Cover Page.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 1 Agenda for Meeting 18 Oct 17.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 1 Agenda for Meeting 18 Oct 17.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 2 Change for A61 Road Traffic Noise.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 2 Change for A61 Road Traffic Noise.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 3 08 01085OL Masterplan.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 3 08 01085OL Masterplan.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 4 08 01085OL Masterplan 1A.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 4 08 01085OL Masterplan 1A.pdf ( kb)3 Nov 2017View
APP-U1050-W-16-3166227 SoCG Noise Appendix 5 Biwater Dwellings Table J.9a J.19a.pdfAPP-U1050-W-16-3166227 SoCG Noise Appendix 5 Biwater Dwellings Table J.9a J.19a.pdf ( kb)3 Nov 2017View
Appendix 1 to Planning Proof letter from Fuel express.pdfAppendix 1 to Planning Proof letter from Fuel express.pdf ( kb)6 Nov 2017View
Appendix 10 to Planning Proof - excerpt from St Mod annual accounts 2016.pdfAppendix 10 to Planning Proof - excerpt from St Mod annual accounts 2016.pdf ( kb)6 Nov 2017View
Appendix 2 to Planning Proof Biwaters Planning Statement.pdfAppendix 2 to Planning Proof Biwaters Planning Statement.pdf ( kb)6 Nov 2017View
Appendix 3 to planing Proof - Field House decision.pdfAppendix 3 to planing Proof - Field House decision.pdf ( kb)6 Nov 2017View
Appendix 4 to Planning Proof Bradley Appeal Decision.pdfAppendix 4 to Planning Proof Bradley Appeal Decision.pdf ( kb)6 Nov 2017View
Appendix 5 to Planning Proof - Highthorn Planning Proof of Evidence.pdfAppendix 5 to Planning Proof - Highthorn Planning Proof of Evidence.pdf ( kb)6 Nov 2017View
Appendix 6 to Planning Proof - Halton Lea Gate decision.pdfAppendix 6 to Planning Proof - Halton Lea Gate decision.pdf ( kb)6 Nov 2017View
Appendix 7 to Planning proof- Details of White Noise alarms.pdfAppendix 7 to Planning proof- Details of White Noise alarms.pdf ( kb)6 Nov 2017View
Appendix 8 to Planning Proof - Excerpt from ES - 08-01805-OL.pdfAppendix 8 to Planning Proof - Excerpt from ES - 08-01805-OL.pdf ( kb)6 Nov 2017View
Appendix 9 to Planning proof - Construction noise limits.pdfAppendix 9 to Planning proof - Construction noise limits.pdf ( kb)6 Nov 2017View
Dust Proof of Evidence.pdfDust Proof of Evidence.pdf ( kb)6 Nov 2017View
Figure JM1.pdfFigure JM1.pdf ( kb)6 Nov 2017View
Figure JM2.pdfFigure JM2.pdf ( kb)6 Nov 2017View
Figure JM3a Footpath 23 Images.pdfFigure JM3a Footpath 23 Images.pdf ( kb)6 Nov 2017View
Figure JM3b Footpath 26 Images.pdfFigure JM3b Footpath 26 Images.pdf ( kb)6 Nov 2017View
Figure JM4 Grass Establishment on Embankments.pdfFigure JM4 Grass Establishment on Embankments.pdf ( kb)6 Nov 2017View
Figure JM5.pdfFigure JM5.pdf ( kb)6 Nov 2017View
Figure JM6 Contextual Photographs.pdfFigure JM6 Contextual Photographs.pdf ( kb)6 Nov 2017View
Figure JM7a Biwater Site Images.pdfFigure JM7a Biwater Site Images.pdf ( kb)6 Nov 2017View
Figure JM7b Biwater Site Images.pdfFigure JM7b Biwater Site Images.pdf ( kb)6 Nov 2017View
Figure JM8a Off-Site Vegetation.pdfFigure JM8a Off-Site Vegetation.pdf ( kb)6 Nov 2017View
Figure JM8b Off-Site Vegetation.pdfFigure JM8b Off-Site Vegetation.pdf ( kb)6 Nov 2017View
Figure JM8c Off-Site Vegetation.pdfFigure JM8c Off-Site Vegetation.pdf ( kb)6 Nov 2017View
Hilltop Farm Landscape -Visual Summary Proof.pdfHilltop Farm Landscape -Visual Summary Proof.pdf ( kb)6 Nov 2017View
Hilltop Farm Landscape-Visual Proof.pdfHilltop Farm Landscape-Visual Proof.pdf ( kb)6 Nov 2017View
Landscape - Visual Appendix _1.pdfLandscape - Visual Appendix _1.pdf ( kb)6 Nov 2017View
Noise Evidence for Appellant 03.11.17.pdfNoise Evidence for Appellant 03.11.17.pdf ( kb)6 Nov 2017View
Planning PoE R Hunt.pdfPlanning PoE R Hunt.pdf ( kb)6 Nov 2017View
Regeneration Proof Final 03.11.17.pdfRegeneration Proof Final 03.11.17.pdf ( kb)6 Nov 2017View
Summary of Planning Proof (Final).pdfSummary of Planning Proof (Final).pdf ( kb)6 Nov 2017View
HILLTOP FARM - PROPOSED SURFACE COAL MINING SCHEME - CBRE - PROOF OF EVI....pdfHILLTOP FARM - PROPOSED SURFACE COAL MINING SCHEME - CBRE - PROOF OF EVI....pdf ( kb)6 Nov 2017View
Proof of evidence - M Walton - FINAL.PDFProof of evidence - M Walton - FINAL.PDF ( kb)6 Nov 2017View
Proof of evidence - SUMMARY - M Walton - FINAL.PDFProof of evidence - SUMMARY - M Walton - FINAL.PDF ( kb)6 Nov 2017View
SUMMARY OF CBRE PROOF OF EVIDENCE.AW.PDFSUMMARY OF CBRE PROOF OF EVIDENCE.AW.PDF ( kb)6 Nov 2017View
2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)16 Oct 2017View
2016 02 24 Add Info Markets 02 CM4-1215-125.pdf2016 02 24 Add Info Markets 02 CM4-1215-125.pdf ( kb)17 Mar 2016View
2016 03 16 Add Info Site Offices 02 CM4-1215-125.pdf2016 03 16 Add Info Site Offices 02 CM4-1215-125.pdf ( kb)17 Mar 2016View
2016 04 25 Add Info Addendum Transport Assessment 02 CM4-1215-125.PDF2016 04 25 Add Info Addendum Transport Assessment 02 CM4-1215-125.PDF ( kb)27 Apr 2016View
2017 02 13 Flood Risk clarification.pdf2017 02 13 Flood Risk clarification.pdf ( kb)13 Feb 2017View
frm-Certificates Updated.pdffrm-Certificates Updated.pdf ( kb)25 Jan 2016View
frm-Minerals Application Form v2-0_tcm44- 151221 j Updated.pdffrm-Minerals Application Form v2-0_tcm44- 151221 j Updated.pdf ( kb)25 Jan 2016View
pla-17929-309-001B.pdfpla-17929-309-001B.pdf ( kb)18 Jan 2016View
pla-17929-309-002B.pdfpla-17929-309-002B.pdf ( kb)18 Jan 2016View
pla-17929-309-003B.pdfpla-17929-309-003B.pdf ( kb)18 Jan 2016View
pla-17929-SK-002 rev B.pdfpla-17929-SK-002 rev B.pdf ( kb)18 Jan 2016View
pla-17929-SK-004 rev a.pdfpla-17929-SK-004 rev a.pdf ( kb)18 Jan 2016View
pla-17929-SK-101 Rev D.pdfpla-17929-SK-101 Rev D.pdf ( kb)18 Jan 2016View
pla-17929-SK-102 Rev E.pdfpla-17929-SK-102 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-103 Rev E.pdfpla-17929-SK-103 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-104 Rev E.pdfpla-17929-SK-104 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-105 Rev E.pdfpla-17929-SK-105 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-106 Rev E.pdfpla-17929-SK-106 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-107 Rev E.pdfpla-17929-SK-107 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-108 Rev E.pdfpla-17929-SK-108 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-109 Rev E.pdfpla-17929-SK-109 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-110 Rev E.pdfpla-17929-SK-110 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-111 Rev E.pdfpla-17929-SK-111 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-112 Rev E.pdfpla-17929-SK-112 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-113 Rev E.pdfpla-17929-SK-113 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-114 Rev E.pdfpla-17929-SK-114 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-115 Rev E.pdfpla-17929-SK-115 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-116 Rev E.pdfpla-17929-SK-116 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-117 Rev D.pdfpla-17929-SK-117 Rev D.pdf ( kb)18 Jan 2016View
pla-17929-SK-118 Rev E.pdfpla-17929-SK-118 Rev E.pdf ( kb)18 Jan 2016View
pla-17929-SK-119 Rev C.pdfpla-17929-SK-119 Rev C.pdf ( kb)18 Jan 2016View
pla-17929-SK-201 Rev B.pdfpla-17929-SK-201 Rev B.pdf ( kb)18 Jan 2016View
pla-5171-L-01 Landscape Restoration Plan E.pdfpla-5171-L-01 Landscape Restoration Plan E.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-02 v4 Site Plan.pdfpla-GPP-P-HF-14-02 v4 Site Plan.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-04 v4 Existing Site Plan.pdfpla-GPP-P-HF-14-04 v4 Existing Site Plan.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-05 v4 Site Context Plan.pdfpla-GPP-P-HF-14-05 v4 Site Context Plan.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-07 HGV Routing Plan.pdfpla-GPP-P-HF-14-07 HGV Routing Plan.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-17 v4 Processing Area.pdfpla-GPP-P-HF-14-17 v4 Processing Area.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdfpla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdfpla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdfpla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdf ( kb)18 Jan 2016View
pla-GPP-P-HF-15-20 Proposed Site Office_16122015_A4.pdfpla-GPP-P-HF-15-20 Proposed Site Office_16122015_A4.pdf ( kb)18 Jan 2016View
pla-MER00290-002-001 to 003 REVA-1.pdfpla-MER00290-002-001 to 003 REVA-1.pdf ( kb)18 Jan 2016View
pla-MER00290-307-101 rev C.pdfpla-MER00290-307-101 rev C.pdf ( kb)18 Jan 2016View
pla-MER00290-307-102.pdfpla-MER00290-307-102.pdf ( kb)18 Jan 2016View
pla-MER00290-307-103.pdfpla-MER00290-307-103.pdf ( kb)18 Jan 2016View
pla-P009-01 Site Location Plan v2.pdfpla-P009-01 Site Location Plan v2.pdf ( kb)18 Jan 2016View
sup 2016 06 29 Regeneration Response v2 02 CM4-1215-125.pdfsup 2016 06 29 Regeneration Response v2 02 CM4-1215-125.pdf ( kb)1 Aug 2016View
sup 2016 07 01 Hilltop Farm FRA Final Report.pdfsup 2016 07 01 Hilltop Farm FRA Final Report.pdf ( kb)1 Aug 2016View
sup 2016 07 26 Network Rail - cons response CM4-1215-125.pdfsup 2016 07 26 Network Rail - cons response CM4-1215-125.pdf ( kb)1 Aug 2016View
sup 2016 07 27 Further Info Letter 02 CM4-1215-125.pdfsup 2016 07 27 Further Info Letter 02 CM4-1215-125.pdf ( kb)1 Aug 2016View
sup Statement of Community Involvement.pdfsup Statement of Community Involvement.pdf ( kb)25 Apr 2017View
sup-2015 01 15 Covering Letter.pdfsup-2015 01 15 Covering Letter.pdf ( kb)18 Jan 2016View
sup-APPENDIX 1 SCOPING OPINION DCC Scoping Opinion 28.1.15.pdfsup-APPENDIX 1 SCOPING OPINION DCC Scoping Opinion 28.1.15.pdf ( kb)18 Jan 2016View
sup-APPENDIX 1 SCOPING OPINION ES App 1 Scoping Opinion.pdfsup-APPENDIX 1 SCOPING OPINION ES App 1 Scoping Opinion.pdf ( kb)18 Jan 2016View
sup-APPENDIX 10 FLOOD RISK EA's No objection letter.pdfsup-APPENDIX 10 FLOOD RISK EA's No objection letter.pdf ( kb)18 Jan 2016View
sup-APPENDIX 10 FLOOD RISK EA's Objection.pdfsup-APPENDIX 10 FLOOD RISK EA's Objection.pdf ( kb)18 Jan 2016View
sup-APPENDIX 10 FLOOD RISK ES App 10 FRA-1.pdfsup-APPENDIX 10 FLOOD RISK ES App 10 FRA-1.pdf ( kb)18 Jan 2016View
sup-APPENDIX 10 FLOOD RISK FRA - EA response.pdfsup-APPENDIX 10 FLOOD RISK FRA - EA response.pdf ( kb)18 Jan 2016View
sup-APPENDIX 11 SOIL RESOURCE AND LANDUSE ES App 11 Soil report v2.pdfsup-APPENDIX 11 SOIL RESOURCE AND LANDUSE ES App 11 Soil report v2.pdf ( kb)18 Jan 2016View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-101 rev C.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-101 rev C.pdf ( kb)18 Jan 2016View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-102.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-102.pdf ( kb)18 Jan 2016View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-103.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-103.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-101 Rev D.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-101 Rev D.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-102 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-102 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-103 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-103 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-105 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-105 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-106 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-106 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-107 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-107 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-108 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-108 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-110 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-110 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-111 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-111 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-112 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-112 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-113 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-113 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-115 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-115 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-116 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-116 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-117 Rev D.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-117 Rev D.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-118 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-118 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-119 Rev C.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-119 Rev C.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-104 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-104 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-109 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-109 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-114 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS17929-SK-114 Rev E.pdf ( kb)18 Jan 2016View
sup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 1 Geo Plan.pdfsup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 1 Geo Plan.pdf ( kb)18 Jan 2016View
sup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 2 Geo Plan.pdfsup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 2 Geo Plan.pdf ( kb)18 Jan 2016View
sup-APPENDIX 15 PROCESSING AREA (DRAWING GPP-P-HF-14-17) GPP-P-HF-14-17 v4 Processing Area.pdfsup-APPENDIX 15 PROCESSING AREA (DRAWING GPP-P-HF-14-17) GPP-P-HF-14-17 v4 Processing Area.pdf ( kb)18 Jan 2016View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-001B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-001B.pdf ( kb)18 Jan 2016View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-002B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-002B.pdf ( kb)18 Jan 2016View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-003B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-003B.pdf ( kb)18 Jan 2016View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-SK-002 rev B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-SK-002 rev B.pdf ( kb)18 Jan 2016View
sup-APPENDIX 17 DRAFT HEADS OF TERMS DRAFT HEADS OF TERMS.pdfsup-APPENDIX 17 DRAFT HEADS OF TERMS DRAFT HEADS OF TERMS.pdf ( kb)18 Jan 2016View
sup-APPENDIX 17 DRAFT HEADS OF TERMS MUGA Documentation.pdfsup-APPENDIX 17 DRAFT HEADS OF TERMS MUGA Documentation.pdf ( kb)18 Jan 2016View
sup-APPENDIX 18 PUBLIC HEALTH ENGLAND 2015 06 18 RES Public Health England 05 CM4-1014-79.pdfsup-APPENDIX 18 PUBLIC HEALTH ENGLAND 2015 06 18 RES Public Health England 05 CM4-1014-79.pdf ( kb)18 Jan 2016View
sup-APPENDIX 18 PUBLIC HEALTH ENGLAND L-17929-2.4.2-15-S271-KRJ.pdfsup-APPENDIX 18 PUBLIC HEALTH ENGLAND L-17929-2.4.2-15-S271-KRJ.pdf ( kb)18 Jan 2016View
sup-APPENDIX 19 Appendix 19.pdfsup-APPENDIX 19 Appendix 19.pdf ( kb)18 Jan 2016View
sup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 pre-app response.pdfsup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 pre-app response.pdf ( kb)18 Jan 2016View
sup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 SCI.pdfsup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 SCI.pdf ( kb)18 Jan 2016View
sup-Appendix 21.pdfsup-Appendix 21.pdf ( kb)18 Jan 2016View
Sup-Appendix 22.pdfSup-Appendix 22.pdf ( kb)3 Feb 2016View
sup-APPENDIX 3 NOISE AND VIBRATION ES App 3 Noise Report.pdfsup-APPENDIX 3 NOISE AND VIBRATION ES App 3 Noise Report.pdf ( kb)18 Jan 2016View
sup-APPENDIX 3 NOISE AND VIBRATION Noise Monitoring Scheme Report.pdfsup-APPENDIX 3 NOISE AND VIBRATION Noise Monitoring Scheme Report.pdf ( kb)18 Jan 2016View
sup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLAN Dust Management Scheme Report (2).pdfsup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLAN Dust Management Scheme Report (2).pdf ( kb)18 Jan 2016View
sup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLANES App 4 Air Quality.pdfsup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLANES App 4 Air Quality.pdf ( kb)18 Jan 2016View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY 5171 LVIA_Addendum_B full document FINAL.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY 5171 LVIA_Addendum_B full document FINAL.pdf ( kb)18 Jan 2016View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY ES App 5 LVIA.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY ES App 5 LVIA.pdf ( kb)18 Jan 2016View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY LVIA_Addendum.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY LVIA_Addendum.pdf ( kb)18 Jan 2016View
sup-APPENDIX 6 ECOLOGY 5171 Ecology_Addendum11.05.15full (2).pdfsup-APPENDIX 6 ECOLOGY 5171 Ecology_Addendum11.05.15full (2).pdf ( kb)18 Jan 2016View
sup-APPENDIX 6 ECOLOGY ES App 6 Ecology.pdfsup-APPENDIX 6 ECOLOGY ES App 6 Ecology.pdf ( kb)18 Jan 2016View
sup-APPENDIX 6 ECOLOGY Outline Biodiversity Management Plan.pdfsup-APPENDIX 6 ECOLOGY Outline Biodiversity Management Plan.pdf ( kb)18 Jan 2016View
sup-APPENDIX 7 TRAFFIC AND TRANSPORT 15124-04.pdfsup-APPENDIX 7 TRAFFIC AND TRANSPORT 15124-04.pdf ( kb)18 Jan 2016View
sup-APPENDIX 7 TRAFFIC AND TRANSPORT ES App 7 Traffic Statement.pdfsup-APPENDIX 7 TRAFFIC AND TRANSPORT ES App 7 Traffic Statement.pdf ( kb)18 Jan 2016View
sup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE ES App 8 Cultural Heritage.pdfsup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE ES App 8 Cultural Heritage.pdf ( kb)18 Jan 2016View
sup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE Trial Trenching Specification.pdfsup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE Trial Trenching Specification.pdf ( kb)18 Jan 2016View
sup-Non Technical Summary Final.pdfsup-Non Technical Summary Final.pdf ( kb)18 Jan 2016View
sup-Notice.pdfsup-Notice.pdf ( kb)25 Jan 2016View
sup-P009-01 MASTER Environmental Statement Final a 151221.pdfsup-P009-01 MASTER Environmental Statement Final a 151221.pdf ( kb)18 Jan 2016View
sup-P009-01 Planning Statement a - Resubmission FINAL.pdfsup-P009-01 Planning Statement a - Resubmission FINAL.pdf ( kb)18 Jan 2016View
Supp 2016 07 28 Reg 22 Response.pdfSupp 2016 07 28 Reg 22 Response.pdf ( kb)1 Aug 2016View
pla-17929-309-001B.pdfpla-17929-309-001B.pdf ( kb)24 Dec 2015View
pla-17929-309-002B.pdfpla-17929-309-002B.pdf ( kb)24 Dec 2015View
pla-17929-309-003B.pdfpla-17929-309-003B.pdf ( kb)24 Dec 2015View
pla-17929-SK-002 rev B.pdfpla-17929-SK-002 rev B.pdf ( kb)24 Dec 2015View
pla-17929-SK-004 rev a.pdfpla-17929-SK-004 rev a.pdf ( kb)24 Dec 2015View
pla-5171-L-01 Landscape Restoration Plan E.pdfpla-5171-L-01 Landscape Restoration Plan E.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-02 v4 Site Plan.pdfpla-GPP-P-HF-14-02 v4 Site Plan.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-04 v4 Existing Site Plan.pdfpla-GPP-P-HF-14-04 v4 Existing Site Plan.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-05 v4 Site Context Plan.pdfpla-GPP-P-HF-14-05 v4 Site Context Plan.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-07 HGV Routing Plan.pdfpla-GPP-P-HF-14-07 HGV Routing Plan.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-17 v4 Processing Area.pdfpla-GPP-P-HF-14-17 v4 Processing Area.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdfpla-GPP-P-HF-14-20 v2 Illustrative Strategic Restoration Plan.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdfpla-GPP-P-HF-15-18 Elevations_Floor Plan - Site Office_15122015_A3.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdfpla-GPP-P-HF-15-19 Elevations_Floor Plan - Canteen_Stores_16122015_A3.pdf ( kb)24 Dec 2015View
pla-GPP-P-HF-15-20 Proposed Site Office_16122015_A4.pdfpla-GPP-P-HF-15-20 Proposed Site Office_16122015_A4.pdf ( kb)24 Dec 2015View
pla-MER00290-002-001 to 003 REVA-1.pdfpla-MER00290-002-001 to 003 REVA-1.pdf ( kb)24 Dec 2015View
pla-MER00290-307-101 rev C.pdfpla-MER00290-307-101 rev C.pdf ( kb)24 Dec 2015View
pla-MER00290-307-102.pdfpla-MER00290-307-102.pdf ( kb)24 Dec 2015View
pla-MER00290-307-103.pdfpla-MER00290-307-103.pdf ( kb)24 Dec 2015View
pla-P009-01 Site Location Plan v2.pdfpla-P009-01 Site Location Plan v2.pdf ( kb)24 Dec 2015View
sup-APPENDIX 1 SCOPING OPINION DCC Scoping Opinion 28.1.15.pdfsup-APPENDIX 1 SCOPING OPINION DCC Scoping Opinion 28.1.15.pdf ( kb)24 Dec 2015View
sup-APPENDIX 1 SCOPING OPINION ES App 1 Scoping Opinion.pdfsup-APPENDIX 1 SCOPING OPINION ES App 1 Scoping Opinion.pdf ( kb)24 Dec 2015View
sup-APPENDIX 10 FLOOD RISK EA's No objection letter.pdfsup-APPENDIX 10 FLOOD RISK EA's No objection letter.pdf ( kb)24 Dec 2015View
sup-APPENDIX 10 FLOOD RISK EA's Objection.pdfsup-APPENDIX 10 FLOOD RISK EA's Objection.pdf ( kb)24 Dec 2015View
sup-APPENDIX 10 FLOOD RISK ES App 10 FRA-1.pdfsup-APPENDIX 10 FLOOD RISK ES App 10 FRA-1.pdf ( kb)24 Dec 2015View
sup-APPENDIX 10 FLOOD RISK FRA - EA response.pdfsup-APPENDIX 10 FLOOD RISK FRA - EA response.pdf ( kb)24 Dec 2015View
sup-APPENDIX 11 SOIL RESOURCE AND LANDUSE ES App 11 Soil report v2.pdfsup-APPENDIX 11 SOIL RESOURCE AND LANDUSE ES App 11 Soil report v2.pdf ( kb)24 Dec 2015View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-101 rev C.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-101 rev C.pdf ( kb)24 Dec 2015View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-102.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-102.pdf ( kb)24 Dec 2015View
sup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-103.pdfsup-APPENDIX 12 AMENDED RESTORATION SCHEME MER00290-307-103.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-101 Rev D.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-101 Rev D.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-102 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-102 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-103 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-103 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-105 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-105 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-106 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-106 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-107 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-107 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-108 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-108 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-110 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-110 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-111 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-111 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-112 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-112 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-113 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-113 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-115 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-115 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-116 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-116 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-117 Rev D.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-117 Rev D.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-118 Rev E.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-118 Rev E.pdf ( kb)24 Dec 2015View
sup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-119 Rev C.pdfsup-APPENDIX 13 EXISTING AND PROPOSED FINAL CONTOURS 17929-SK-119 Rev C.pdf ( kb)24 Dec 2015View
sup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 1 Geo Plan.pdfsup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 1 Geo Plan.pdf ( kb)24 Dec 2015View
sup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 2 Geo Plan.pdfsup-APPENDIX 14 NATIONAL GRID POWER LINE DIVERSION OPTIONS 2165939 Option 2 Geo Plan.pdf ( kb)24 Dec 2015View
sup-APPENDIX 15 PROCESSING AREA (DRAWING GPP-P-HF-14-17) GPP-P-HF-14-17 v4 Processing Area.pdfsup-APPENDIX 15 PROCESSING AREA (DRAWING GPP-P-HF-14-17) GPP-P-HF-14-17 v4 Processing Area.pdf ( kb)24 Dec 2015View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-001B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-001B.pdf ( kb)24 Dec 2015View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-002B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-002B.pdf ( kb)24 Dec 2015View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-003B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-309-003B.pdf ( kb)24 Dec 2015View
sup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-SK-002 rev B.pdfsup-APPENDIX 16 CROSS SECTIONS DRAWINGS 17929-SK-002 rev B.pdf ( kb)24 Dec 2015View
sup-APPENDIX 17 DRAFT HEADS OF TERMS DRAFT HEADS OF TERMS.pdfsup-APPENDIX 17 DRAFT HEADS OF TERMS DRAFT HEADS OF TERMS.pdf ( kb)24 Dec 2015View
sup-APPENDIX 17 DRAFT HEADS OF TERMS MUGA Documentation.pdfsup-APPENDIX 17 DRAFT HEADS OF TERMS MUGA Documentation.pdf ( kb)24 Dec 2015View
sup-APPENDIX 18 PUBLIC HEALTH ENGLAND 2015 06 18 RES Public Health England 05 CM4-1014-79.pdfsup-APPENDIX 18 PUBLIC HEALTH ENGLAND 2015 06 18 RES Public Health England 05 CM4-1014-79.pdf ( kb)24 Dec 2015View
sup-APPENDIX 18 PUBLIC HEALTH ENGLAND L-17929-2.4.2-15-S271-KRJ.pdfsup-APPENDIX 18 PUBLIC HEALTH ENGLAND L-17929-2.4.2-15-S271-KRJ.pdf ( kb)24 Dec 2015View
sup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 pre-app response.pdfsup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 pre-app response.pdf ( kb)24 Dec 2015View
sup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 SCI.pdfsup-APPENDIX 2 CONSULTATION DOCUMENTATION ES App 2 SCI.pdf ( kb)24 Dec 2015View
sup-APPENDIX 3 NOISE AND VIBRATION ES App 3 Noise Report.pdfsup-APPENDIX 3 NOISE AND VIBRATION ES App 3 Noise Report.pdf ( kb)24 Dec 2015View
sup-APPENDIX 3 NOISE AND VIBRATION Noise Monitoring Scheme Report.pdfsup-APPENDIX 3 NOISE AND VIBRATION Noise Monitoring Scheme Report.pdf ( kb)24 Dec 2015View
sup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLAN Dust Management Scheme Report (2).pdfsup-APPENDIX 4 AIR QUALITY AND DUST MANAGEMENT PLAN Dust Management Scheme Report (2).pdf ( kb)24 Dec 2015View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY 5171 LVIA_Addendum_B full document FINAL.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY 5171 LVIA_Addendum_B full document FINAL.pdf ( kb)24 Dec 2015View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY ES App 5 LVIA.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY ES App 5 LVIA.pdf ( kb)24 Dec 2015View
sup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY LVIA_Addendum.pdfsup-APPENDIX 5 LANDSCAPE AND VISUAL AMENITY LVIA_Addendum.pdf ( kb)24 Dec 2015View
sup-APPENDIX 6 ECOLOGY 5171 Ecology_Addendum11.05.15full (2).pdfsup-APPENDIX 6 ECOLOGY 5171 Ecology_Addendum11.05.15full (2).pdf ( kb)24 Dec 2015View
sup-APPENDIX 6 ECOLOGY Outline Biodiversity Management Plan.pdfsup-APPENDIX 6 ECOLOGY Outline Biodiversity Management Plan.pdf ( kb)24 Dec 2015View
sup-APPENDIX 7 TRAFFIC AND TRANSPORT 15124-04.pdfsup-APPENDIX 7 TRAFFIC AND TRANSPORT 15124-04.pdf ( kb)24 Dec 2015View
sup-APPENDIX 7 TRAFFIC AND TRANSPORT ES App 7 Traffic Statement.pdfsup-APPENDIX 7 TRAFFIC AND TRANSPORT ES App 7 Traffic Statement.pdf ( kb)24 Dec 2015View
sup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE ES App 8 Cultural Heritage.pdfsup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE ES App 8 Cultural Heritage.pdf ( kb)24 Dec 2015View
sup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE Trial Trenching Specification.pdfsup-APPENDIX 8 ARCHAEOLOGY AND CULTURAL HERITAGE Trial Trenching Specification.pdf ( kb)24 Dec 2015View
2015 02 16 RES Natural England 05 CM4-1215-125.pdf2015 02 16 RES Natural England 05 CM4-1215-125.pdf ( kb)16 Feb 2016View
2016 01 27 RES EA 05 CM4-1215-125.pdf2016 01 27 RES EA 05 CM4-1215-125.pdf ( kb)27 Jan 2016View
2016 02 08 RES Historic England 05 CM4-1215-125.pdf2016 02 08 RES Historic England 05 CM4-1215-125.pdf ( kb)8 Feb 2016View
2016 02 11 RES Coal Authority 05 CM4-1215-125.pdf2016 02 11 RES Coal Authority 05 CM4-1215-125.pdf ( kb)11 Feb 2016View
2016 02 12 RES PHE 05 CM4-1215-125.pdf2016 02 12 RES PHE 05 CM4-1215-125.pdf ( kb)12 Feb 2016View
2016 02 15 RES DCC Devcon 05 CM4-1215-125.pdf2016 02 15 RES DCC Devcon 05 CM4-1215-125.pdf ( kb)15 Feb 2016View
2016 02 16 RES Network Rail 05 CM4-1215-125.pdf2016 02 16 RES Network Rail 05 CM4-1215-125.pdf ( kb)16 Feb 2016View
2016 02 16 RES Network Rail Email 05 CM4-1215-125.pdf2016 02 16 RES Network Rail Email 05 CM4-1215-125.pdf ( kb)16 Feb 2016View
2016 02 17 RES Interim Clay Cross PC 05 CM4-1215-125.pdf2016 02 17 RES Interim Clay Cross PC 05 CM4-1215-125.pdf ( kb)17 Feb 2016View
2016 02 17 RES Interim NEDDC 05 CM4-1215-125.pdf2016 02 17 RES Interim NEDDC 05 CM4-1215-125.pdf ( kb)17 Feb 2016View
2016 02 17 RES NPCU 05 CM4-1215-125.pdf2016 02 17 RES NPCU 05 CM4-1215-125.pdf ( kb)17 Feb 2016View
2016 02 19 RES Tupton Parish Council 05 CM4-1215-125.pdf2016 02 19 RES Tupton Parish Council 05 CM4-1215-125.pdf ( kb)19 Feb 2016View
2016 02 24 RES Clay Cross PC 05 CM4-1215-125.pdf2016 02 24 RES Clay Cross PC 05 CM4-1215-125.pdf ( kb)24 Feb 2016View
2016 02 25 RES NG 05 CM4-1215-125.pdf2016 02 25 RES NG 05 CM4-1215-125.pdf ( kb)25 Feb 2016View
2016 02 25 RES NG Pt2 05 CM4-1215-125.pdf2016 02 25 RES NG Pt2 05 CM4-1215-125.pdf ( kb)26 Feb 2016View
2016 02 26 RES Interim NEDDC 05 CM4-1215-125.pdf2016 02 26 RES Interim NEDDC 05 CM4-1215-125.pdf ( kb)26 Feb 2016View
2016 03 04 RES DWT 05 CM4-1215-125.pdf2016 03 04 RES DWT 05 CM4-1215-125.pdf ( kb)8 Mar 2016View
2016 03 18 Res EHO 05 CM4-1215-125.pdf2016 03 18 Res EHO 05 CM4-1215-125.pdf ( kb)21 Mar 2016View
2016 03 31 RES Flood Team 05 CM4-1215-125.pdf2016 03 31 RES Flood Team 05 CM4-1215-125.pdf ( kb)7 Apr 2016View
2016 03 31 RES Flood Team Email 05 CM4-1215-125.pdf2016 03 31 RES Flood Team Email 05 CM4-1215-125.pdf ( kb)7 Apr 2016View
2016 04 05 NEDDC - TL 05 CM4-1215-125.pdf2016 04 05 NEDDC - TL 05 CM4-1215-125.pdf ( kb)11 May 2016View
2016 04 28 Res NEDDC 05 CM4-1215-125.pdf2016 04 28 Res NEDDC 05 CM4-1215-125.pdf ( kb)3 May 2016View
2016 05 12 RES Highways 05 CM4-1215-125.pdf2016 05 12 RES Highways 05 CM4-1215-125.pdf ( kb)12 May 2016View
2016 05 16 Res Cllr G Baxter NEDDC 05 CM4-1215-125.pdf2016 05 16 Res Cllr G Baxter NEDDC 05 CM4-1215-125.pdf ( kb)20 May 2016View
2016 07 01 Res Network Rail 05 CM4-1215-125.pdf2016 07 01 Res Network Rail 05 CM4-1215-125.pdf ( kb)27 Jul 2016View
2016 08 03 RES EA 05 CM4-1215-125.pdf2016 08 03 RES EA 05 CM4-1215-125.pdf ( kb)3 Aug 2016View
2016 08 11 Res Coal Authority 05 CM4-1215-125 (2).pdf2016 08 11 Res Coal Authority 05 CM4-1215-125 (2).pdf ( kb)13 Sept 2016View
2016 08 11 Res Coal Authority 05 CM4-1215-125.pdf2016 08 11 Res Coal Authority 05 CM4-1215-125.pdf ( kb)11 Aug 2016View
2016 08 15 Res Historic England 05 CM4-1215-125.pdf2016 08 15 Res Historic England 05 CM4-1215-125.pdf ( kb)15 Aug 2016View
2016 08 20 Add info RES Coal Auth 05 CM4 1215 125.pdf2016 08 20 Add info RES Coal Auth 05 CM4 1215 125.pdf ( kb)13 Sept 2016View
2016 08 2016 RES PHE 05 CM4-1215-125.pdf2016 08 2016 RES PHE 05 CM4-1215-125.pdf ( kb)2 Aug 2016View
2016 08 22 RES NE 05 CM4-1215-125.pdf2016 08 22 RES NE 05 CM4-1215-125.pdf ( kb)22 Aug 2016View
2016 09 06 RES further info Network Rail Mining 05 CM4-1215-125.pdf2016 09 06 RES further info Network Rail Mining 05 CM4-1215-125.pdf ( kb)6 Sept 2016View
2016 09 06 RES CX Parish Council 05 CM4 1215 125.pdf2016 09 06 RES CX Parish Council 05 CM4 1215 125.pdf ( kb)14 Sept 2016View
2016 09 07 RES NEDDC 05 CM4 1215 125.pdf2016 09 07 RES NEDDC 05 CM4 1215 125.pdf ( kb)14 Sept 2016View
2016 09 27 RES Yorkshire Water 05 CM4-1215-125.pdf2016 09 27 RES Yorkshire Water 05 CM4-1215-125.pdf ( kb)28 Sept 2016View
2016 10 12 RES Flood team 05 CM4-1215-125.pdf2016 10 12 RES Flood team 05 CM4-1215-125.pdf ( kb)12 Oct 2016View
2016 10 17 RES SevernTrent 05 CM4-1215-125.pdf2016 10 17 RES SevernTrent 05 CM4-1215-125.pdf ( kb)17 Oct 2016View
2016 11 01 RES NEDDC 05 CM4 1215 125.pdf2016 11 01 RES NEDDC 05 CM4 1215 125.pdf ( kb)4 Nov 2016View
2016 11 3 Res EHO 05 CM4-1215-125.pdf2016 11 3 Res EHO 05 CM4-1215-125.pdf ( kb)7 Nov 2016View
2017 02 13 RES add info EA 05 CM4-1215-125.pdf2017 02 13 RES add info EA 05 CM4-1215-125.pdf ( kb)13 Feb 2017View
2017 02 14 RES Archaeology Further info 05 CM4-1215-125.pdf2017 02 14 RES Archaeology Further info 05 CM4-1215-125.pdf ( kb)14 Feb 2017View
2017 02 14 RES EHO 05 CM4-1215-125.pdf2017 02 14 RES EHO 05 CM4-1215-125.pdf ( kb)17 Feb 2017View
2017 02 15 RES HE 05 CM4-1215-125..pdf2017 02 15 RES HE 05 CM4-1215-125..pdf ( kb)15 Feb 2017View
2017 02 17 RES CO 5 CM4-1215-125.pdf2017 02 17 RES CO 5 CM4-1215-125.pdf ( kb)17 Feb 2017View
2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)2 Mar 2017View
2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf ( kb)8 Mar 2017View
2017 04 10 RES DWT add info 05 CM4-1215-125.pdf2017 04 10 RES DWT add info 05 CM4-1215-125.pdf ( kb)12 Apr 2017View
2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf ( kb)2 Oct 2017View
2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf ( kb)2 Oct 2017View
2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf ( kb)5 Oct 2017View
2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf ( kb)9 Oct 2017View
2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)5 Oct 2017View
2017 10 12 Reg 22 LRES HE CM4-1215-125.pdf2017 10 12 Reg 22 LRES HE CM4-1215-125.pdf ( kb)16 Oct 2017View
2017 11 07 Res DWT 05 CM4-1215-125.pdf2017 11 07 Res DWT 05 CM4-1215-125.pdf ( kb)13 Nov 2017View
CM4-1215-125 Reg 22 EHO.pdfCM4-1215-125 Reg 22 EHO.pdf ( kb)16 Oct 2017View
PHE Response.pdfPHE Response.pdf ( kb)17 Feb 2017View
2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf2017 03 02 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf2017 03 07 Reg 22 RES Network Rail 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf2017 09 22 RES PHE Reg 22 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf2017 09 22RES EA Reg 22 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf2017 10 02 Network Rail Reg22 RES CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES HSE 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf2017 10 05 Reg 22 RES NE 05 CM4-1215-125.pdf ( kb)19 Oct 2017View
2016 01 26 Email PT re Press Advert - Derbyshire Times 4 February 2016.pdf2016 01 26 Email PT re Press Advert - Derbyshire Times 4 February 2016.pdf ( kb)26 Jan 2016View
2016 02 03 Map 1 Site notices and Neighbour notification locations 03 CW4-1215-125.pdf2016 02 03 Map 1 Site notices and Neighbour notification locations 03 CW4-1215-125.pdf ( kb)4 Feb 2016View
2016 02 03 Map 2 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf2016 02 03 Map 2 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf ( kb)4 Feb 2016View
2016 02 03 Map 3 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf2016 02 03 Map 3 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf ( kb)4 Feb 2016View
2016 02 03 Map 4 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf2016 02 03 Map 4 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf ( kb)4 Feb 2016View
2016 02 03 Map 5 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf2016 02 03 Map 5 Site notice and Neighbour Notifications locations 03 CM4-1215-125.pdf ( kb)4 Feb 2016View
2016 02 03 neighbour notiification 03 CM4-1215-125.pdf2016 02 03 neighbour notiification 03 CM4-1215-125.pdf ( kb)2 Feb 2016View
2016 02 03 Site Notice 03 CM4-1215-125.pdf2016 02 03 Site Notice 03 CM4-1215-125.pdf ( kb)2 Feb 2016View
2016 02 11 Derbyshire Times 03 CM4-1215-125.pdf2016 02 11 Derbyshire Times 03 CM4-1215-125.pdf ( kb)12 Feb 2016View
2016 08 11 Press Ad Reg 22 03 CM4-1215-125.pdf2016 08 11 Press Ad Reg 22 03 CM4-1215-125.pdf ( kb)5 Aug 2016View
2016 08 11 Site Notice Locations Reg 22 03 CM4-1215-125.pdf2016 08 11 Site Notice Locations Reg 22 03 CM4-1215-125.pdf ( kb)17 Aug 2016View
2016 08 11 Site notice Reg 22 03 CM4-1215-125.pdf2016 08 11 Site notice Reg 22 03 CM4-1215-125.pdf ( kb)15 Aug 2016View
APPEAL DECISION NOTICE.pdfAPPEAL DECISION NOTICE.pdf ( kb)13 Apr 2018View
Clay Cross Coal Mining Calcs Table J.2a & J.12a.pdfClay Cross Coal Mining Calcs Table J.2a & J.12a.pdf ( kb)30 Nov 2017View
DCC Figure 1 - Cuts 1 to 3.pdfDCC Figure 1 - Cuts 1 to 3.pdf ( kb)30 Nov 2017View
DCCresponsepdf.pdfDCCresponsepdf.pdf ( kb)30 Nov 2017View
DECISION NOTICE.pdfDECISION NOTICE.pdf ( kb)11 Apr 2018View
Response to Pre-Inquiry Note 01 (Part 1) 27.11.17.pdfResponse to Pre-Inquiry Note 01 (Part 1) 27.11.17.pdf ( kb)30 Nov 2017View
Response to Pre-inquiry Note 01 (Part 2) 27.11.17.pdfResponse to Pre-inquiry Note 01 (Part 2) 27.11.17.pdf ( kb)30 Nov 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Notice Date

    Published milestoneCouncil source

Decision & conditions

Appeal Dismissed
DECISION NOTICE.pdf APPEAL DECISION NOTICE.pdf DECISION NOTICE.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.