Council planning record

Construction of an all-purpose single carriageway complete with verges, cycleways and footways (including three new roundabout junctions), connecting between the existing roundabout spur at Occupation Lane, Woodville, and the A514 Derby Road, Swadlincote.

Land between A514 Derby Road and Occupation Lane

Application approvedReference: CD9/0519/20Derbyshire County Council

Last published check: 28 Sept 2026, 06:24. Check the council record for more recent changes.

Application location

Land between A514 Derby Road and Occupation Lane

This record has no verified map location.

Application summary

Status
Application approved
Application type
Major (County Council)
Received
29 May 2019
Validated
31 May 2019
Determination deadline
Not published
Local authority
Derbyshire County Council

Application overview

Construction of an all-purpose single carriageway complete with verges, cycleways and footways (including three new roundabout junctions), connecting between the existing roundabout spur at Occupation Lane, Woodville, and the A514 Derby Road, Swadlincote.

Proposal details

Reference
CD9/0519/20
Agent
D Massingham

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 100 of 100

DocumentPublishedAction
frm-Application Form.pdffrm-Application Form.pdf ( kb)29 May 2019View
pla-autotrack-exhibit 4 Derby Road.pdfpla-autotrack-exhibit 4 Derby Road.pdf ( kb)29 May 2019View
pla-Detailed General Arrangement 1 of 3.pdfpla-Detailed General Arrangement 1 of 3.pdf ( kb)29 May 2019View
pla-Detailed General Arrangement 2 of 3.pdfpla-Detailed General Arrangement 2 of 3.pdf ( kb)29 May 2019View
pla-Detailed General Arrangement 3 of 3.pdfpla-Detailed General Arrangement 3 of 3.pdf ( kb)29 May 2019View
pla-drainage site plan.pdfpla-drainage site plan.pdf ( kb)15 Jul 2019View
pla-Existing Public Rights of Way.pdfpla-Existing Public Rights of Way.pdf ( kb)29 May 2019View
pla-Figure 1 Noise Location Plan.pdfpla-Figure 1 Noise Location Plan.pdf ( kb)29 May 2019View
pla-General Arrangement (2).pdfpla-General Arrangement (2).pdf ( kb)29 May 2019View
pla-general arrangement sheet 1 of 3.pdfpla-general arrangement sheet 1 of 3.pdf ( kb)15 Jul 2019View
pla-general arrangement sheet 2 of 3.pdfpla-general arrangement sheet 2 of 3.pdf ( kb)15 Jul 2019View
pla-general arrangement sheet 3 of 3.pdfpla-general arrangement sheet 3 of 3.pdf ( kb)15 Jul 2019View
pla-General Arrangement.pdfpla-General Arrangement.pdf ( kb)29 May 2019View
pla-Landscape Master Plan 2.pdfpla-Landscape Master Plan 2.pdf ( kb)29 May 2019View
pla-Landscape Master Plan.pdfpla-Landscape Master Plan.pdf ( kb)29 May 2019View
pla-Location Plan.pdfpla-Location Plan.pdf ( kb)3 Jun 2019View
pla-Long Sections 1 of 2.pdfpla-Long Sections 1 of 2.pdf ( kb)29 May 2019View
pla-Long Sections 2 of 2.pdfpla-Long Sections 2 of 2.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 2 2020 Do-Minimum Traffic Noise Levels.pdfpla-Noise Assessment Figure 2 2020 Do-Minimum Traffic Noise Levels.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 3 2035 Do-Minimum Traffic Noise Levels.pdfpla-Noise Assessment Figure 3 2035 Do-Minimum Traffic Noise Levels.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 4 Do-Minimum Long Term Change.pdfpla-Noise Assessment Figure 4 Do-Minimum Long Term Change.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 5 2020 Do-Something Traffic Noise Levels.pdfpla-Noise Assessment Figure 5 2020 Do-Something Traffic Noise Levels.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 6 2035 Do-Something Traffic Noise Levels.pdfpla-Noise Assessment Figure 6 2035 Do-Something Traffic Noise Levels.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 7 Do-Something Short Term Change.pdfpla-Noise Assessment Figure 7 Do-Something Short Term Change.pdf ( kb)29 May 2019View
pla-Noise Assessment Figure 8 Do-Something Long Term Change.pdfpla-Noise Assessment Figure 8 Do-Something Long Term Change.pdf ( kb)29 May 2019View
pla-Noise Assessment SK.1a Short Term Change (North).pdfpla-Noise Assessment SK.1a Short Term Change (North).pdf ( kb)29 May 2019View
pla-Noise Assessment SK.1b Short Term Change (South).pdfpla-Noise Assessment SK.1b Short Term Change (South).pdf ( kb)29 May 2019View
pla-Noise Assessment SK.1c Short Term Change (East).pdfpla-Noise Assessment SK.1c Short Term Change (East).pdf ( kb)29 May 2019View
pla-Noise Assessment SK.2a Noise Insulation (North).pdfpla-Noise Assessment SK.2a Noise Insulation (North).pdf ( kb)29 May 2019View
pla-Noise Assessment SK.2b Noise Insulation (South).pdfpla-Noise Assessment SK.2b Noise Insulation (South).pdf ( kb)29 May 2019View
pla-Phase 1 Habitat Survey.pdfpla-Phase 1 Habitat Survey.pdf ( kb)29 May 2019View
pla-Post-Development Public Rights of Way 2.pdfpla-Post-Development Public Rights of Way 2.pdf ( kb)29 May 2019View
pla-Post-Development Public Rights of Way.pdfpla-Post-Development Public Rights of Way.pdf ( kb)29 May 2019View
pla-Turning Movement.pdfpla-Turning Movement.pdf ( kb)29 May 2019View
pla-Turning Movements 2.pdfpla-Turning Movements 2.pdf ( kb)29 May 2019View
pla-Turning Movements 3.pdfpla-Turning Movements 3.pdf ( kb)29 May 2019View
pla-Turning Movements.pdfpla-Turning Movements.pdf ( kb)29 May 2019View
pla-Typical Cross Sections.pdfpla-Typical Cross Sections.pdf ( kb)29 May 2019View
pla-Vehicle Tracking Junctions.pdfpla-Vehicle Tracking Junctions.pdf ( kb)29 May 2019View
pla-Vehicle Tracking Roundabouts 1 of 2.pdfpla-Vehicle Tracking Roundabouts 1 of 2.pdf ( kb)29 May 2019View
pla-Vehicle Tracking Roundabouts 2 of 2.pdfpla-Vehicle Tracking Roundabouts 2 of 2.pdf ( kb)29 May 2019View
sup-Arboricultural Impact Assessment.pdfsup-Arboricultural Impact Assessment.pdf ( kb)3 Jul 2019View
sup-Coal Mining Risk Assessment Part 1.pdfsup-Coal Mining Risk Assessment Part 1.pdf ( kb)6 Jun 2019View
sup-Coal Mining Risk Assessment Part 2.pdfsup-Coal Mining Risk Assessment Part 2.pdf ( kb)6 Jun 2019View
sup-Coal Mining Risk Assessment Part 3.pdfsup-Coal Mining Risk Assessment Part 3.pdf ( kb)3 Jun 2019View
sup-Coal Mining Risk Assessment Part 4.pdfsup-Coal Mining Risk Assessment Part 4.pdf ( kb)3 Jun 2019View
sup-Coal Mining Risk Assessment Part 5.pdfsup-Coal Mining Risk Assessment Part 5.pdf ( kb)6 Jun 2019View
sup-Coal Mining Risk Assessment Part 6.pdfsup-Coal Mining Risk Assessment Part 6.pdf ( kb)3 Jun 2019View
sup-Consultation Report Part 1.pdfsup-Consultation Report Part 1.pdf ( kb)6 Jun 2019View
sup-Consultation Report Part 2.pdfsup-Consultation Report Part 2.pdf ( kb)29 May 2019View
sup-Consultation Report Part 27 - Cultural Heritage Assessment.pdfsup-Consultation Report Part 27 - Cultural Heritage Assessment.pdf ( kb)29 May 2019View
sup-Cultural Heritage Desk Based Assessment.pdfsup-Cultural Heritage Desk Based Assessment.pdf ( kb)29 May 2019View
sup-detailed drainage design technical note.pdfsup-detailed drainage design technical note.pdf ( kb)15 Jul 2019View
sup-Detailed Drainage Design.pdfsup-Detailed Drainage Design.pdf ( kb)31 May 2019View
sup-Doc Issue Register 2019-07-11.pdfsup-Doc Issue Register 2019-07-11.pdf ( kb)15 Jul 2019View
sup-FRA+SuDS Strategy 2.pdfsup-FRA+SuDS Strategy 2.pdf ( kb)31 May 2019View
sup-FRA+SuDS Strategy.pdfsup-FRA+SuDS Strategy.pdf ( kb)31 May 2019View
sup-Great Crested Newt eDNA Survey.pdfsup-Great Crested Newt eDNA Survey.pdf ( kb)31 May 2019View
sup-Highways Design Statement.pdfsup-Highways Design Statement.pdf ( kb)6 Jun 2019View
sup-Landscape and Visual Appraisal.pdfsup-Landscape and Visual Appraisal.pdf ( kb)31 May 2019View
sup-Landscape Rationale.pdfsup-Landscape Rationale.pdf ( kb)31 May 2019View
sup-Noise Discussion Notes from Aecompdf.pdfsup-Noise Discussion Notes from Aecompdf.pdf ( kb)6 Jun 2019View
sup-Noise Impact Assessment.pdfsup-Noise Impact Assessment.pdf ( kb)31 May 2019View
sup-Photo Montage.pdfsup-Photo Montage.pdf ( kb)10 Jun 2019View
sup-Preliminary Ecological Assessment.pdfsup-Preliminary Ecological Assessment.pdf ( kb)31 May 2019View
sup-Supporting Statement.pdfsup-Supporting Statement.pdf ( kb)6 Jun 2019View
sup-Transport Assessment.pdfsup-Transport Assessment.pdf ( kb)31 May 2019View
sup-Woodville Road Phase II Investigation Report_Optimized.pdfsup-Woodville Road Phase II Investigation Report_Optimized.pdf ( kb)5 Jun 2019View
sup-Written Statement of Investigation for Archaeological Evaluation.pdfsup-Written Statement of Investigation for Archaeological Evaluation.pdf ( kb)31 May 2019View
Woodville Road Phase II Investigation Report clean.docxWoodville Road Phase II Investigation Report clean.docx ( kb)30 May 2019View
pla-drainage site plan.pdfpla-drainage site plan.pdf ( kb)15 Jul 2019View
pla-Existing Public Rights of Way.pdfpla-Existing Public Rights of Way.pdf ( kb)29 May 2019View
pla-Figure 1 Noise Location Plan.pdfpla-Figure 1 Noise Location Plan.pdf ( kb)29 May 2019View
sup-Derbyshire Wildlife Trust.pdfsup-Derbyshire Wildlife Trust.pdf ( kb)29 May 2019View
sup-Design Statement.pdfsup-Design Statement.pdf ( kb)29 May 2019View
sup-Ecological Addendum.pdfsup-Ecological Addendum.pdf ( kb)31 May 2019View
sup-Ecological Appraisal.pdfsup-Ecological Appraisal.pdf ( kb)31 May 2019View
sup-HA response appendix HA1.pdfsup-HA response appendix HA1.pdf ( kb)29 May 2019View
sup-Phase 1 ecology survey report.pdfsup-Phase 1 ecology survey report.pdf ( kb)31 May 2019View
sup-PRoW Response.pdfsup-PRoW Response.pdf ( kb)31 May 2019View
sup-Regeneration Route.pdfsup-Regeneration Route.pdf ( kb)31 May 2019View
sup-Report cover.pdfsup-Report cover.pdf ( kb)29 May 2019View
Committee Report CD9-0519-20.pdfCommittee Report CD9-0519-20.pdf ( kb)24 Sept 2019View
2019 06 12 RES HE 05 CD9-0519-20.pdf2019 06 12 RES HE 05 CD9-0519-20.pdf ( kb)12 Jun 2019View
2019 06 14 RES Cadent Gas 05 CD9-0519-20.pdf2019 06 14 RES Cadent Gas 05 CD9-0519-20.pdf ( kb)14 Jun 2019View
2019 06 14 RES NE 05 CD9-0519-20.pdf2019 06 14 RES NE 05 CD9-0519-20.pdf ( kb)14 Jun 2019View
2019 06 26 RES TCA 05 CD9-0519-20.pdf2019 06 26 RES TCA 05 CD9-0519-20.pdf ( kb)26 Jun 2019View
2019 06 27 RES EA 05 CD9-0519-20.pdf2019 06 27 RES EA 05 CD9-0519-20.pdf ( kb)27 Jun 2019View
2019 06 28 RES LLFA 05 CD9-0519-20.pdf2019 06 28 RES LLFA 05 CD9-0519-20.pdf ( kb)28 Jun 2019View
2019 07 09 RES LLFA 05 CD9-0519-20.pdf2019 07 09 RES LLFA 05 CD9-0519-20.pdf ( kb)9 Jul 2019View
2019 07 16 RES LLFA 05 CD9-0519-20_.pdf2019 07 16 RES LLFA 05 CD9-0519-20_.pdf ( kb)16 Jul 2019View
2019 07 17 RES SDDC 05 CD9-0519-20.pdf2019 07 17 RES SDDC 05 CD9-0519-20.pdf ( kb)17 Jul 2019View
2019 08 01 RES Highways 05 CD9-0519-20.pdf2019 08 01 RES Highways 05 CD9-0519-20.pdf ( kb)2 Aug 2019View
2019 08 27 RES Highways 05 CD9-0519-20.pdf2019 08 27 RES Highways 05 CD9-0519-20.pdf ( kb)27 Aug 2019View
2019 09 03 RES National Forest Company 05 CD9-0519-20.pdf2019 09 03 RES National Forest Company 05 CD9-0519-20.pdf ( kb)3 Sept 2019View
2019 09 04 RES Butterfly Conservation 05 CD9-0519-20.pdf2019 09 04 RES Butterfly Conservation 05 CD9-0519-20.pdf ( kb)5 Sept 2019View
2019 09 04 RES South Derbyshire DC EHO 05 CD9-0519-20.pdf2019 09 04 RES South Derbyshire DC EHO 05 CD9-0519-20.pdf ( kb)4 Sept 2019View
2019 06 14 RES NE 05 CD9-0519-20.pdf2019 06 14 RES NE 05 CD9-0519-20.pdf ( kb)14 Jun 2019View
2019 06 06 Press notice 03 CD9-0519-20.pdf2019 06 06 Press notice 03 CD9-0519-20.pdf ( kb)7 Jun 2019View
2019 09 24 TCP3 09 CD9-0519-20.pdf2019 09 24 TCP3 09 CD9-0519-20.pdf ( kb)24 Sept 2019View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Consultation Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Date

    Published milestoneCouncil source
  5. Notice Date

    Published milestoneCouncil source

Decision & conditions

Approved subject to conditions
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.