The proposed development incorporates a new secure lobby and school office through new main entrance aluminium framed double doors. In addition, new 1.5m weld mesh fencing and two matching gates are to be installed to the east side of the building. Due to the relocation of the office, the line of sight for the existing school gates is limited. Therefore, the units on the existing gates, including camera, control panel and buzzer will be replaced on both sides and reflects a sensible height for visitors to the school.
Westfield Infant School, Vincent Crescent, Chesterfield,S40 3NW
The proposed development incorporates a new secure lobby and school office through new main entrance aluminium framed double doors. In addition, new 1.5m weld mesh fencing and two matching gates are to be installed to the east side of the building. Due to the relocation of the office, the line of sight for the existing school gates is limited. Therefore, the units on the existing gates, including camera, control panel and buzzer will be replaced on both sides and reflects a sensible height for visitors to the school.
Reference
CD2/0518/12
Agent
D Massingham
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.