Council planning record

Partial Discharge of Condition 11 (Construction Vibration Monitoring Methodology) of Planning Permission Ref: O/2013/0214/F for the carrying out of associated works required for the erection of a single circuit 400kV overhead line (North South Interconnector)

Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

DeterminedReference: SPD/2024/0073/DCDepartment for Infrastructure

Application location

Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

This record has no verified map location.

Application summary

Status
Determined
Application type
Discharge of Condition
Received
26 Sept 2024
Validated
26 Sept 2024
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

Partial Discharge of Condition 11 (Construction Vibration Monitoring Methodology) of Planning Permission Ref: O/2013/0214/F for the carrying out of associated works required for the erection of a single circuit 400kV overhead line (North South Interconnector)

Proposal details

Reference
SPD/2024/0073/DC
Ward
Keady
Agent
Alistair McKinley

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
Discharge of Condition Application - Cover LetterApplication Form1 Oct 2024View
Environmental Health Department Mid Ulster District CouncilConsultation Responses10 Oct 2024View
Environ Health Arm BBridge And Craig responseConsultation Responses20 Nov 2024View
Discharge of Condition Application - Cover EmailCorrespondence with Department1 Oct 2024View
Decision LetterPlanning decisions and reports9 Dec 2024View
Assessment & EIA StatementPlanning decisions and reports9 Dec 2024View
Construction Vibration Monitoring MethodologyOther Supporting Information1 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source
  5. Permission expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Condition Discharged
Decision Letter Assessment & EIA Statement
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.