Council planning record

Application under Section 54 to remove Condition 5 (restricting the number of daily Belfast to Dublin train services) on planning permission Ref: LA04/2017/1388/F for a New Integrated Public Transport Interchange (the Belfast Transport Hub)

See Application Form for Full Description of Location: Lands to the East of the Westlink (A12); South of (Nos.127-9) and including Grosvenor Road; at Intersection of Grosvenor Road and Stanley Street; at the intersection of Durham Street and Grosvenor Road; at the intersection of Fisherwick Place and Howard Street; at Great Victoria Street (between Nos. 1-3 to 27-45); at Glengall Street (between Nos. 3-21); at the Junction of Hope Street, Bruce Street and Great Victoria Street; at The Junction of Durham Street, Linfield Road, Sandy Row and Hope Street; at Sandy Row from 2 Hurst Park to 85-87 Sandy Row, Gilpins Site; to North of Former Whitehall Tobacco Works at Linfield Road, Weavers Court Business Park/ Linfield Industrial Estate, Blythefield Primary School and Charter Youth Club; at Weavers Court Business Park and Railway Track; Lands Surrounding Arellian Nursery and bounded by Utility Street/Bentham Drive/Egmont Gardens/ Felt Street (to North); Belfast

DeterminedReference: SPD/2023/0991/FDepartment for Infrastructure

Application location

See Application Form for Full Description of Location: Lands to the East of the Westlink (A12); South of (Nos.127-9) and including Grosvenor Road; at Intersection of Grosvenor Road and Stanley Street; at the intersection of Durham Street and Grosvenor Road; at the intersection of Fisherwick Place and Howard Street; at Great Victoria Street (between Nos. 1-3 to 27-45); at Glengall Street (between Nos. 3-21); at the Junction of Hope Street, Bruce Street and Great Victoria Street; at The Junction of Durham Street, Linfield Road, Sandy Row and Hope Street; at Sandy Row from 2 Hurst Park to 85-87 Sandy Row, Gilpins Site; to North of Former Whitehall Tobacco Works at Linfield Road, Weavers Court Business Park/ Linfield Industrial Estate, Blythefield Primary School and Charter Youth Club; at Weavers Court Business Park and Railway Track; Lands Surrounding Arellian Nursery and bounded by Utility Street/Bentham Drive/Egmont Gardens/ Felt Street (to North); Belfast

This record has no verified map location.

Application summary

Status
Determined
Application type
Full
Received
27 Nov 2023
Validated
27 Nov 2023
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

Application under Section 54 to remove Condition 5 (restricting the number of daily Belfast to Dublin train services) on planning permission Ref: LA04/2017/1388/F for a New Integrated Public Transport Interchange (the Belfast Transport Hub)

Proposal details

Reference
SPD/2023/0991/F
Alternative references
PP-12406032
Ward
Central
Agent
Helen Harison

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 143 of 143

DocumentPublishedAction
Application FormApplication Form14 Feb 2024View
How the fee was calculatedApplication Form14 Feb 2024View
Env Health Belfast City Council responseConsultation Responses14 Aug 2024View
Belfast City Council – Consultation ResponseConsultation Responses8 Oct 2024View
Env Health Belfast City Council responseConsultation Responses17 Oct 2024View
Letter to Agent seeking Information in Response to Environmental Health CommentsCorrespondence with Applicant/Agent/Solicitor27 Aug 2024View
Letter to Agent Requesting InformationCorrespondence with Applicant/Agent/Solicitor4 Mar 2025View
Letter to Applicant with Notice of OpinionCorrespondence with Applicant/Agent/Solicitor29 Apr 2026View
S54 Application For The Removal Of Planning Condition 5 Of Planning Application La04 2017 1388 FCorrespondence with Applicant/Agent/Solicitor21 Feb 2024View
Agent Letter to Department re Notice of OpinionCorrespondence with Department25 Jun 2026View
Submission of Private Streets Drawings - Cover EmailCorrespondence with Department9 Apr 2026View
Cover Email - Submission of InformationCorrespondence with Department3 Sept 2024View
Cover Letter - Submission of InformationCorrespondence with Department3 Sept 2024View
Letter From Agent Re Eia Determination – 11 March 2024Correspondence with Department26 Apr 2024View
Bth Section 54 Eia Screening Letter Issue 31.10.23(1)Correspondence with Department19 Feb 2024View
Bth Section 54 Env Report Final 31.10.2023(1)Correspondence with Department19 Feb 2024View
Letter to Council with Notice of OpinionCorrespondence with council29 Apr 2026View
Notice of OpinionPlanning decisions and reports29 Apr 2026View
Council Response to Notice of OpinionPlanning decisions and reports25 Jun 2026View
Decision NoticePlanning decisions and reports25 Jun 2026View
Applicant Response to Notice of OpinionPlanning decisions and reports25 Jun 2026View
EIA Determination LetterPlanning decisions and reports19 Feb 2024View
EIA Determination ReportPlanning decisions and reports19 Feb 2024View
Development Management ReportPlanning decisions and reports29 Apr 2026View
Addendum to Development Management ReportPlanning decisions and reports29 Apr 2026View
Belfast Grand Central Station - Road Drawings Position PaperPlanning decisions and reports9 Apr 2026View
Travel PlanImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix A Development ProposalsImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix B Ecology And Nature Conservation Compressed RedactedImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix C Air QualityImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix E Ground ConditionsImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix F Historic EnvironmentImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix G Townscape and Visual Impact AssessmentImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 1Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 2Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 4Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 5Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 6Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix I Socio EconomicImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix H Water Environment Part 3Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 2Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 3Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 4Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix K WasteImpact Assessments and Statements23 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 1Impact Assessments and Statements23 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 6Impact Assessments and Statements24 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 7Impact Assessments and Statements24 Apr 2024View
ES Vol II Appendix J Transport Assessment Part 5Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 1Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 4Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 3Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 2bImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 2aImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 5Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 6Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 7Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 8Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 9Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix B EcologyImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix C Air Quality Compressed Part 1Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part10aImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 10bImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix A Development Proposals Part 11Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix D Noise And Vibration Part 1Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix D Noise And Vibration Part 2Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix D Noise And Vibration Part 3Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix D Noise And Vibration Part 4Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix C Air Quality Compressed Part 2Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix E Ground Conditions Compressed Part 3Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix E Ground Conditions Compressed Part 4Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix E Ground Conditions Compressed Part 5Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix E Ground Conditions Compressed Part 1Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix E Ground Conditions Compressed Part 2Impact Assessments and Statements24 Apr 2024View
ES Vol III Appendix F Historic Environment CompressedImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix G Townscape and Visual Impact Assessment CompressedImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix H Water EnvironmentImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix I Socio EconomicImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix J TransportImpact Assessments and Statements24 Apr 2024View
ES Vol III Appendix K WasteImpact Assessments and Statements24 Apr 2024View
Environmental Statement Vol I Main TextImpact Assessments and Statements24 Apr 2024View
ES Non Technical SummaryImpact Assessments and Statements24 Apr 2024View
Section 54 Application ES Addendum Issue 25.03.2024Impact Assessments and Statements24 Apr 2024View
Section 54 Application ES Addendum Non Technical Summary Issue 25.03.2024Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix B Part 1Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix DImpact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix CImpact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix B Part 3Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix B Part 2Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix E1 Part 2Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix E1 Part 1Impact Assessments and Statements24 Apr 2024View
ES FEI 1 Appendix E1 Part 4Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 3Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 6Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 5Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 9Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 8Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E1 Part 7Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E2 Part 1Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E2 Part 2Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Appendix E2 Part 3Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D3Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D1Impact Assessments and Statements25 Apr 2024View
ES FEI 1 Report Inc Appendix AImpact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D4Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D2Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D9Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D6Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D5Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D7Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D8Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix D10Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix B2Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Addendum Appendix AImpact Assessments and Statements25 Apr 2024View
ES FEI 2 Addendum Appendix BImpact Assessments and Statements25 Apr 2024View
ES FEI 2 Report Inc Appendix AImpact Assessments and Statements25 Apr 2024View
ES FEI 2 AddendumImpact Assessments and Statements25 Apr 2024View
ES FEI 2 Addendum Appendix CImpact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix B1Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix C2Impact Assessments and Statements25 Apr 2024View
ES FEI 2 Appendix C1Impact Assessments and Statements25 Apr 2024View
ES Vol II Appendix D Noise and VibrationImpact Assessments and Statements25 Apr 2024View
Neighbours Notifications 16 05 2024Neighbour Notifications31 May 2024View
Drawing C0423-ARP-XX-00-DR-CH-0033 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0034 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0035 P06Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0041 P05Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX00-DR-CH-0042 P05Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0029 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0030 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0031 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0032 P04Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0043 P03Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP- XX-00-DR-CH-0044 P05Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0046 P03Plans, Maps and Drawings9 Apr 2026View
Drawing C0423-ARP-XX-00-DR-CH-0047 P03Plans, Maps and Drawings9 Apr 2026View
Letter To DfI Planning 03.03.25Other Supporting Information10 Mar 2025View
Cover Email - Letter to DfI Planning 03.03.25Other Supporting Information10 Mar 2025View
Planning StatementOther Supporting Information14 Feb 2024View
Revised Response To Bcc Environmental Health Department's Request For Clarification – Received 30.09.24Other Supporting Information4 Oct 2024View
Cover Email – Submission Of Information Received 30.09.24Other Supporting Information4 Oct 2024View
Email from Arup to Environmental HealthOther Supporting Information18 Oct 2024View
Response to BCC Environmental Health Department's Request for ClarificationOther Supporting Information3 Sept 2024View
Response to Department’s Queries regarding ES AddendumOther Supporting Information27 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision date

    Published milestoneCouncil source

Decision & conditions

Granted
Notice of Opinion Council Response to Notice of Opinion Decision Notice Applicant Response to Notice of Opinion EIA Determination Letter EIA Determination Report Development Management Report Addendum to Development Management Report Belfast Grand Central Station - Road Drawings Position Paper
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.