Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
The existing Owenreagh I & II Wind farm site:- (i) The existing Owenreagh I & II Wind farm site, (ii) lands located north of Glenmornan Road, and (iii) lands located south-east of the Glenmornan Rd/ Napple Rd road junction, approximatley 6km south-east of Artigarvan village, Co. Tyrone.
The existing Owenreagh I & II Wind farm site:- (i) The existing Owenreagh I & II Wind farm site, (ii) lands located north of Glenmornan Road, and (iii) lands located south-east of the Glenmornan Rd/ Napple Rd road junction, approximatley 6km south-east of Artigarvan village, Co. Tyrone.
This record has no verified map location.
The Owenreagh Craignagapple Wind Farm Development comprises the decommissioning and repowering of the Operational Owenreagh and II Wind Farms. The Development will comprise of the following main components: • Decommissioning and removal of the existing turbines (Owenreagh I & II); • The erection of 14 three bladed horizontal axis wind turbines of up to 156.5 m tip height with capacity output of up to 67.2MW; • 2 temporary construction compound/laydown areas; • Removal and restoration of the existing crane hardstandings, access tracks and any other above-ground infrastructure in accordance with the Outline DCEMP and Draft HMP; • Construction and/or upgrading of seven Site access points onto the public highway; • Construction of approximately 3,947m of new access tracks; • Upgrade of approximately 382m of existing access tracks; • Construction of turning heads and passing places on the access tracks; • Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and internal or external transformers and/or switchgear; • Construction of turbine foundations; • Two water crossings; • Installation of buried underground electrical and communication cables; • Construction of a substation and control building, and associated compound, • Road widening & provision of passing bays: and • All associated ancillary works.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Application FormApplication Form | 29 Mar 2024 | View |
| P1W FormApplication Form | 12 Jun 2024 | View |
| NIEA RESPONSEConsultation Responses | 29 Sept 2025 | View |
| Derry City and Strabane District Council EHO Response Spd 2023 0981 FConsultation Responses | 8 Jan 2026 | View |
| Belfast International Airport responseConsultation Responses | 8 Apr 2026 | View |
| PSNI Information And Communications Services responseConsultation Responses | 8 Apr 2026 | View |
| The Joint Radio Company responseConsultation Responses | 13 Apr 2026 | View |
| Belfast City Airport responseConsultation Responses | 15 Apr 2026 | View |
| City of Derry Airport responseConsultation Responses | 15 Apr 2026 | View |
| System Operator Northern Ireland SONI responseConsultation Responses | 15 Apr 2026 | View |
| National Air Traffic Services responseConsultation Responses | 15 Apr 2026 | View |
| Northern Ireland Tourist Board responseConsultation Responses | 15 Apr 2026 | View |
| NI Water - Windfarms responseConsultation Responses | 15 Apr 2026 | View |
| Foyle Carlingford & Irish Lights Commission responseConsultation Responses | 15 Apr 2026 | View |
| Health & Safety Executive for NI responseConsultation Responses | 15 Apr 2026 | View |
| Renewable Electricity Team responseConsultation Responses | 15 Apr 2026 | View |
| NIEA responseConsultation Responses | 15 Apr 2026 | View |
| DHSSPS - NI Fire and Rescue Service Headquarters responseConsultation Responses | 15 Apr 2026 | View |
| Mll Telecom Ltd - Windfarms responseConsultation Responses | 15 Apr 2026 | View |
| NIE - Belfast responseConsultation Responses | 15 Apr 2026 | View |
| Royal Society for the Protection of Birds - Headqu responseConsultation Responses | 15 Apr 2026 | View |
| Shared Environmental Services responseConsultation Responses | 15 Apr 2026 | View |
| Civil Aviation Authority responseConsultation Responses | 15 Apr 2026 | View |
| DfE - Geological Survey (NI) responseConsultation Responses | 15 Apr 2026 | View |
| DfI Rivers responseConsultation Responses | 15 Apr 2026 | View |
| DFI Roads - Derry City & Strabane Office responseConsultation Responses | 15 Apr 2026 | View |
| DFI Roads - Derry City & Strabane Office responseConsultation Responses | 15 Apr 2026 | View |
| Foyle Carlingford & Irish Lights Commission responseConsultation Responses | 15 Apr 2026 | View |
| Historic Environment Division (HED) responseConsultation Responses | 15 Apr 2026 | View |
| Royal Society for the Protection of Birds - Headqu responseConsultation Responses | 15 Apr 2026 | View |
| Northern Ireland Tourist Board responseConsultation Responses | 15 Apr 2026 | View |
| Historic Environment Division (HED) responseConsultation Responses | 15 Apr 2026 | View |
| Royal Society for the Protection of Birds - Headqu responseConsultation Responses | 15 Apr 2026 | View |
| Arqiva Limited responseConsultation Responses | 10 Jun 2026 | View |
| Response To Dfi Consultation To Dcsdc.docxConsultation Responses | 11 Jun 2026 | View |
| Dfi Roads ResponseConsultation Responses | 18 Aug 2026 | View |
| Department’s Request For Further InformationCorrespondence with Applicant/Agent/Solicitor | 2 Oct 2026 | View |
| Cover Letter (2) July 2024Correspondence with Applicant/Agent/Solicitor | 11 Sept 2024 | View |
| Non Technical SummaryImpact Assessments and Statements | 13 May 2024 | View |
| Technical Appendix 3.2 Draft Habitat Management And Enhancement Plan (hmep)Impact Assessments and Statements | 13 May 2024 | View |
| Drawing No. 1 Figure 1.1 Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 2 Figure 1.1a Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 3 Figure 1.1b Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 4 Figure 1.1c Site LocationplanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 5 Figure 1.1d Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 6 Figure 1.1e Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 7 Figure 1.1f Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 8 Figure 1.1g Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 9 Figure 1.1h Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 10 Figure 1.1i Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 11 Figure 1.1j Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 12 Figure 1.1k Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 13 Figure 1.1l Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 14 Figure 1.1m Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 15 Figure 1.1n Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 16 Figure 1.1o Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 17 Figure 1.1p Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 18 Figure 1.1q Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 19 Figure 1.1r Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 20 Figure 1.1s Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 21 Figure 1.1t Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 22 Figure 1.1u Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 23 Figure 1.1v Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 24 Figure 1.1w Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 25 Figure 1.1x Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 26 Figure 1.1y Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 27 Figure 1.1z Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 28 Figure 1.1aa Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 29 Figure 1.1ab Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 30 Figure 1.1ac Site Location PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 31 Figure 2 Site Boundary PlanPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 32 Figure 2a Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 33 Figure 2b Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 34 Figure 2c Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 35 Figure 2d Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 41 Figure 2j Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 42 Figure 2k Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 43 Figure 2l Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 44 Figure 2m Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 45 Figure 2n Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 36 Figure 2e Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 37 Figure 2f Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 38 Figure 2g Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 39 Figure 2h Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 40 Figure 2i Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 46 Figure 2o Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 47 Figure 2p Site BoundaryPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 48 Figure 3 Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 49 Figure 3a Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 50 Figure 3b Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 51 Figure 3c Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 52 Figure 3d Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 53 Figure 3e Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 54 Figure 3f Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 55 Figure 3g Development LayoutPlans, Maps and Drawings | 28 Mar 2024 | View |
| Drawing No. 56 Figure 3h Development LayoutPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 57 Figure 3i Development LayoutPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 58 Figure 3j Development LayoutPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 59 Figure 3k Development LayoutPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 60 Figure 4a Turbines 1 And 2 Access Junction General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 61 Figure 4b Turbines 3, 4 And 5 Access Junction General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 62 Figure 4c Turbines 6 And 7 Access Juntions General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 63 Figure 4d Turbines 8, 9, 10, 11 And 12 Access Junction General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 64 Figure 4e Turbine 13 Access Junction General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 65 Figure 4f Turbine 14 Access Junction General ArrangementPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 66 Figure 5a Turbine ElevationPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 67 Figure 5b Turbine ElevationPlans, Maps and Drawings | 29 Mar 2024 | View |
| Drawing No. 68 Figure 6 Foundation DesignPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 69 Figure 3.7 Crane HardstandingPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 70 Figure 8 Cable Trench DetailPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 71 Figure 9 Typical Transformer ElevationPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 72 Figure 10 Typical Substation CompoundPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 73 Figure 11 Typical Substation Compound ElevationsPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 74 Figure 12 Typical Substation Floor PlansPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 75 Figure 13a Typical Primary Temporary Construction CompoundPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 76 Figure 13b Typical Secondary Temporary Construction CompoundPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 77 Figure 14a Typical Cut Track DesignPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 78 Figure 14b Typical Floating Track DesignPlans, Maps and Drawings | 12 Apr 2024 | View |
| Drawing No. 79 Figure 15 Typical Culvert DetailPlans, Maps and Drawings | 12 Apr 2024 | View |
| Environmental Statement Techincal Appendix A7.3 Assessment Of Indirect Effects For Designated Assets With 5kmOther Supporting Information | 12 Apr 2024 | View |
| Pacc Report August 2023Other Supporting Information | 12 Apr 2024 | View |
| Indicative Secondary Tcc Fig 3.12b (1)Other Supporting Information | 1 May 2024 | View |
| Indicative Secondary Tcc Fig 3.12aOther Supporting Information | 1 May 2024 | View |
| Indicative Substation Compound Floor Plans Fig 3.11Other Supporting Information | 1 May 2024 | View |
| Cut Track Access Track Design Fig 3.14(2)Other Supporting Information | 1 May 2024 | View |
| Floating Track Access Track Design Fig 3.15Other Supporting Information | 1 May 2024 | View |
| Indicative Culvert Detail Fig 3.13Other Supporting Information | 1 May 2024 | View |
| Technical Appendix 3.1 ODCEMPOther Supporting Information | 1 May 2024 | View |
| Technical Appendix 3.3 OPMPOther Supporting Information | 1 May 2024 | View |
| Indicative N133 Turbine Elevation Fig 3.4bOther Supporting Information | 1 May 2024 | View |
| Indicative Secondary Tcc Fig 3.12b (1)(1)Other Supporting Information | 1 May 2024 | View |
| Indicative Secondary Tcc Fig 3.12a(1)Other Supporting Information | 1 May 2024 | View |
| Indicative Substation Compound Fig 3.9Other Supporting Information | 1 May 2024 | View |
| Indicative Substation Compound Floor Plans Fig 3.11(1)Other Supporting Information | 1 May 2024 | View |
| Indicative Substation Elevations Fig 3.10Other Supporting Information | 1 May 2024 | View |
| Indicative Turbine Foundation Fig 3.5Other Supporting Information | 1 May 2024 | View |
| Indicative V136 Turbine Elevation Fig 3.4aOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A 3.1 Outline Decommisioning And Construction Environmental PlanOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A 3.3 Outline Peat Management PlanOther Supporting Information | 1 May 2024 | View |
| Cut Track Access Track Design Fig 3.14(3)Other Supporting Information | 1 May 2024 | View |
| Fig3.1 Development LayoutOther Supporting Information | 1 May 2024 | View |
| Fig3.2 Comparison Of The Development Operational Wind Farms And The Consented WindfarmOther Supporting Information | 1 May 2024 | View |
| Fig3.3 Micrositing AreaOther Supporting Information | 1 May 2024 | View |
| Floating Track Access Track Design Fig 3.15(1)Other Supporting Information | 1 May 2024 | View |
| Indicative Cable Trench Detail Fig 3.8Other Supporting Information | 1 May 2024 | View |
| Indicative Crane Hardstanding Fig 3.6Other Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.4 Cumulative DevelopmentsOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.1 Scoping Request Part 1Other Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.1 Scoping Request Part 2Other Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.1 Scoping Request Part 3Other Supporting Information | 1 May 2024 | View |
| Fig6 18 Cztv Churchhill Seegronan Gronan AltgolanOther Supporting Information | 1 May 2024 | View |
| Fig6 19 Cztv Pollnalaght PigeontopOther Supporting Information | 1 May 2024 | View |
| Fig6 20 Cztv CrockdunOther Supporting Information | 1 May 2024 | View |
| Fig6 21 Comparative Ztv CraignagappleOther Supporting Information | 1 May 2024 | View |
| Fig6 22 Cztv Barrcregg BallyhanedinOther Supporting Information | 1 May 2024 | View |
| Fig6 23 Lightpollution A1Other Supporting Information | 1 May 2024 | View |
| Indicative Culvert Detail Fig 3.13(1)Other Supporting Information | 1 May 2024 | View |
| Indicative External Transformer Fig 3.7Other Supporting Information | 1 May 2024 | View |
| Fig 4.1 Layout Evolutions And Comparison FinalOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.2 Scoping OpinionOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A2.3 Abnormal Load Route WorksOther Supporting Information | 1 May 2024 | View |
| Fig6 24 Ztv Hublighting A1 ReducedOther Supporting Information | 1 May 2024 | View |
| Fig6 25 Lightintensity 20km A1 ReducedOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A6.1 Landscape And Visual Impact Assessment MethodologyOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A6.2 Rvaa WirelinesOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A6.2 Rvva FinalOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A6.3 AviationOther Supporting Information | 1 May 2024 | View |
| Fig6 6 Hh Ztv VpOther Supporting Information | 1 May 2024 | View |
| Fig6 7 HztvOther Supporting Information | 1 May 2024 | View |
| Fig6 8 Ztv LcaOther Supporting Information | 1 May 2024 | View |
| Fig6 9 Ztv DesignationsOther Supporting Information | 1 May 2024 | View |
| Fig6 10 Ztv VrOther Supporting Information | 1 May 2024 | View |
| Fig6 11 Composite 20km A0 ReducedOther Supporting Information | 1 May 2024 | View |
| Fig6 12 CwfOther Supporting Information | 1 May 2024 | View |
| Fig6 13 Comparative Ztv Owenreagh I ExtnOther Supporting Information | 1 May 2024 | View |
| Fig6 14 Cztv Carrickatane Curryfree Slievekirk Extn EglishmountainOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A7.5 Cultural Heritage WirelinesOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A7.1 Archaeological Desk Based AssessmentOther Supporting Information | 1 May 2024 | View |
| Technical Appendix A7.2 Setting Sieving Exercise For Designated Assets Between 5 And 15 KmOther Supporting Information | 1 May 2024 | View |
| Technical Assessment A8.1 Hydrological Unit AsssessmentOther Supporting Information | 1 May 2024 | View |
| Technical Assessment A8.2 Private Water Supply RiskOther Supporting Information | 1 May 2024 | View |
| Technical Assessment A8.3 Indirect Effects GroundwaterOther Supporting Information | 1 May 2024 | View |
| Technical Assessment A8.4 Water Crossing InventoryOther Supporting Information | 1 May 2024 | View |
| Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 1Other Supporting Information | 1 May 2024 | View |
| Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 2Other Supporting Information | 1 May 2024 | View |
| Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 3Other Supporting Information | 1 May 2024 | View |
| Fig 8.2 Hydrological CatchmentsOther Supporting Information | 8 May 2024 | View |
| Fig 8.3 Hydrological FeaturesOther Supporting Information | 8 May 2024 | View |
| Fig 8.4 Watercourse CrossingsOther Supporting Information | 8 May 2024 | View |
| Fig 8.5 Wetland HabitatsOther Supporting Information | 8 May 2024 | View |
| Fig 8.1 Hydrological Study AreasOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A9.1 Peat Slide Risk Part 1Other Supporting Information | 8 May 2024 | View |
| Technical Appendix A9.1 Peat Slide Risk Part 2Other Supporting Information | 8 May 2024 | View |
| Technical Appendix A9.1 Peat Slide Risk Part 3Other Supporting Information | 8 May 2024 | View |
| Fig 9.1 Superficial GeologyOther Supporting Information | 8 May 2024 | View |
| Fig 9.2 Bedrock GeologyOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A12.2 Details Of Construction PlantOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A12.3 Metrological And Acoustic DataOther Supporting Information | 8 May 2024 | View |
| Fig 12.1 Construction Noise AssessmentOther Supporting Information | 8 May 2024 | View |
| Fig 12.2 Operational Noise AssessmentOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A15.2 Carbon Balance AssessmentOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A 14.1 Economic Impact Assessment Of Owenreagh Craignagapple Wind FarmOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A15.1 Shadow Flicker AssessmentOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A 13.3 Construction Development ProgrammeOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A 13.4 Access Junction Design And Visibility Splay AssessmentOther Supporting Information | 8 May 2024 | View |
| Technical Appendix A 13.5 Passing Bay Design Part 1Other Supporting Information | 8 May 2024 | View |
| Technical Appendix A 13.5 Passing Bay Design Part 2Other Supporting Information | 13 May 2024 | View |
| Technical Appendix A 13.5 Passing Bay Design Part 3Other Supporting Information | 13 May 2024 | View |
| Fig 13.1 Route To SiteOther Supporting Information | 13 May 2024 | View |
| Fig 13.2 Road Traffic Collision (rtc) AssessmentOther Supporting Information | 13 May 2024 | View |
| Technical Appendix A 13.1 Abnormal Load Route Assessment Part 1Other Supporting Information | 13 May 2024 | View |
| Technical Appendix A 13.1 Abnormal Load Route Assessment Part 2Other Supporting Information | 13 May 2024 | View |
| Technical Appendix A 13.2 Traffic Count DataOther Supporting Information | 13 May 2024 | View |
| Volume 3c Figure 6.26eOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.26fOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27aOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27bOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27cOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27dOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27eOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.27fOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.26aOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.26bOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.26cOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.26dOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.28aOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.28bOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.28cOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.28dOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.28eOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.29aOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.29bOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.29cOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.29dOther Supporting Information | 29 Mar 2024 | View |
| Volume 3c Figure 6.29eOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.29f(1)Other Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.29f(2)Other Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.29gOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.29hOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.29iOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30eOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30fOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.30gOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.31aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.31bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.31cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.31dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.32aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.32bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.32cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.32dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.33aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.33bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.33cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.33dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.33eOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34eOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34fOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.34gOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.35aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.35bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.35cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.35dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.36aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.36bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.36cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.36dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.37aOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.37bOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.37cOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.37dOther Supporting Information | 10 Apr 2024 | View |
| Volume 3c Figure 6.37eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.37fOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.38aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.38bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.38cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.38dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39fOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.39gOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.40aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.40bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.40cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.40dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.40eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.41aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.41bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.41cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.41dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.42cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.42dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.42eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43fOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.43gOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.44aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.44bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.44cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.44dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45cOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45fOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.45gOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.42aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.42bOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.48dOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.48eOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.48fOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.48gOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.49aOther Supporting Information | 11 Apr 2024 | View |
| Volume 3c Figure 6.49bOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.49cOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.49dOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.49eOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.50aOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.47cOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.47dOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.47eOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.47fOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.47gOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.48aOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.48bOther Supporting Information | 12 Apr 2024 | View |
| Volume 3c Figure 6.48cOther Supporting Information | 12 Apr 2024 | View |
| Environmental Statement Chapters 1 16Other Supporting Information | 12 Apr 2024 | View |
| Fig 3.10 Indicative Substation ElevationsOther Supporting Information | 12 Apr 2024 | View |
| Collision Risk Modelling (crm) ReportOther Supporting Information | 12 Apr 2024 | View |
| Cut Track Access Track Design Fig 3.14Other Supporting Information | 12 Apr 2024 | View |
| Design And Access Statement Aug 2023Other Supporting Information | 12 Apr 2024 | View |
| Draft Habitat Management And Enhancement Plan (hmep)Other Supporting Information | 12 Apr 2024 | View |
| Economic Impact Assessment Of Owenreagh Craignagapple Wind FarmOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.7 Indicative External TransformerOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.8 Indicative Cable Trench DetailOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.9 Indicative Substation CompoundOther Supporting Information | 12 Apr 2024 | View |
| Abnormal Load Route Assessment (alra)Other Supporting Information | 12 Apr 2024 | View |
| Active Peat AssessementOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.1 Development LayoutOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.4a Indicative V136 Turbine ElevationOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.4b Indicative N133 Turbine ElevationOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.5 Indicative Turbine FoundationOther Supporting Information | 12 Apr 2024 | View |
| Fig 3.6 Indicative Crane HardstandingOther Supporting Information | 12 Apr 2024 | View |
| ES Volume 4 Technical Appendix 7.4 RedactedOther Supporting Information | 12 Jun 2024 | View |
| ES Volume 4 Technical Appendix 10.3 Nvc QuadratsOther Supporting Information | 12 Jun 2024 | View |
| ES Volume 4 Technical Appendix 12.1 Baseline Data Analysis RedactedOther Supporting Information | 12 Jun 2024 | View |
| Information To Inform a Habitats Regulation Assessment Including HraOther Supporting Information | 12 Jun 2024 | View |
| Cover letterOther Supporting Information | 12 Jun 2024 | View |
| Planning StatementOther Supporting Information | 12 Jun 2024 | View |
| ES Volume 3 Figure 15.1 Links & Proposed NIE Overhead PowerlineOther Supporting Information | 12 Jun 2024 | View |
| ES Volume 4 Technical Appendix 7.3Other Supporting Information | 12 Jun 2024 | View |
| Fei July 2024Other Supporting Information | 11 Sept 2024 | View |
| Fei Submission Excluding FiguresOther Supporting Information | 11 Sept 2024 | View |
| Fei Submission FiguresOther Supporting Information | 11 Sept 2024 | View |
| Planning Drawings Figure 1 1o Znd 1 1pOther Supporting Information | 11 Sept 2024 | View |
| Planning FormOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.29a Vp4 Moor Lough Picnic AreaOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.30a Vp5 Holyhill Road, HolyhillOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.32a Vp7 Strathmourne Road, StrathbaneOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.35a Vp10 Slievbeg Road, SlievbegOther Supporting Information | 11 Sept 2024 | View |
| Viewpoin Plan Figure Fei.6.41a A5 Strule River ValleyOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.40a Vp15 Foreglen Road, KillalooOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.36a Vp11 BallynamallaghtOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.37a Vp12 B48 DunnamanaghOther Supporting Information | 11 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.38a Vp13 Lenamore Picnic Area, GortinOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.39a Vp14 Ulster Way At Bolaght MountainOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.44a Vp19 BallindraitOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.45a Vp20 Meendamph Road, CrockrourOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.46a Vp21 GlenmoranOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.47a Vp22 Aghafad RoadOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.42a Vp17 Bells Park, GlebeOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.48a Vp23 Bessy BellOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6.50a Vp25 RaphoeOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.626a Vp1 Koram Road, LigfordrumOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.631a Vp6 President Wilson's HouseOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei.6287a Vp2 Koram Road, Ligfordrum 2Other Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei6. 4a Vp9 Harry Averys CastleOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei6.28a Vp3 Napple Road, Ballykeery BridgeOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei6.33a Vp8 Victoria BridgeOther Supporting Information | 12 Sept 2024 | View |
| Viewpoint Plan Figure Fei6.49a Vp24 Silverhill RoadOther Supporting Information | 12 Sept 2024 | View |
| Viwpoint Plan Figure Fei.6.43a Vp18 Mullaghclogha, Sperrin MountainsOther Supporting Information | 12 Sept 2024 | View |
| RPP&C LETTER TO ENVIRONEMNET HEALTHMiscellaneous | 21 Nov 2025 | View |
| RPP&C LETTER TO NIEAMiscellaneous | 21 Nov 2025 | View |
| Letter To Niea Re Outstanding ConsultationsMiscellaneous | 2 Dec 2025 | View |
| Consultations Issued ReportConsultation Requests | 19 Jun 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.