Council planning record

The Owenreagh Craignagapple Wind Farm Development comprises the decommissioning and repowering of the Operational Owenreagh and II Wind Farms. The Development will comprise of the following main components: • Decommissioning and removal of the existing turbines (Owenreagh I & II); • The erection of 14 three bladed horizontal axis wind turbines of up to 156.5 m tip height with capacity output of up to 67.2MW; • 2 temporary construction compound/laydown areas; • Removal and restoration of the existing crane hardstandings, access tracks and any other above-ground infrastructure in accordance with the Outline DCEMP and Draft HMP; • Construction and/or upgrading of seven Site access points onto the public highway; • Construction of approximately 3,947m of new access tracks; • Upgrade of approximately 382m of existing access tracks; • Construction of turning heads and passing places on the access tracks; • Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and internal or external transformers and/or switchgear; • Construction of turbine foundations; • Two water crossings; • Installation of buried underground electrical and communication cables; • Construction of a substation and control building, and associated compound, • Road widening & provision of passing bays: and • All associated ancillary works.

The existing Owenreagh I & II Wind farm site:- (i) The existing Owenreagh I & II Wind farm site, (ii) lands located north of Glenmornan Road, and (iii) lands located south-east of the Glenmornan Rd/ Napple Rd road junction, approximatley 6km south-east of Artigarvan village, Co. Tyrone.

Consultation OpenReference: SPD/2023/0981/FDepartment for Infrastructure

Application location

The existing Owenreagh I & II Wind farm site:- (i) The existing Owenreagh I & II Wind farm site, (ii) lands located north of Glenmornan Road, and (iii) lands located south-east of the Glenmornan Rd/ Napple Rd road junction, approximatley 6km south-east of Artigarvan village, Co. Tyrone.

This record has no verified map location.

Application summary

Status
Consultation Open
Application type
Full
Received
21 Sept 2023
Validated
21 Sept 2023
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

The Owenreagh Craignagapple Wind Farm Development comprises the decommissioning and repowering of the Operational Owenreagh and II Wind Farms. The Development will comprise of the following main components: • Decommissioning and removal of the existing turbines (Owenreagh I & II); • The erection of 14 three bladed horizontal axis wind turbines of up to 156.5 m tip height with capacity output of up to 67.2MW; • 2 temporary construction compound/laydown areas; • Removal and restoration of the existing crane hardstandings, access tracks and any other above-ground infrastructure in accordance with the Outline DCEMP and Draft HMP; • Construction and/or upgrading of seven Site access points onto the public highway; • Construction of approximately 3,947m of new access tracks; • Upgrade of approximately 382m of existing access tracks; • Construction of turning heads and passing places on the access tracks; • Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and internal or external transformers and/or switchgear; • Construction of turbine foundations; • Two water crossings; • Installation of buried underground electrical and communication cables; • Construction of a substation and control building, and associated compound, • Road widening & provision of passing bays: and • All associated ancillary works.

Proposal details

Reference
SPD/2023/0981/F
Ward
Kilfennan

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 401 of 401

DocumentPublishedAction
Application FormApplication Form29 Mar 2024View
P1W FormApplication Form12 Jun 2024View
NIEA RESPONSEConsultation Responses29 Sept 2025View
Derry City and Strabane District Council EHO Response Spd 2023 0981 FConsultation Responses8 Jan 2026View
Belfast International Airport responseConsultation Responses8 Apr 2026View
PSNI Information And Communications Services responseConsultation Responses8 Apr 2026View
The Joint Radio Company responseConsultation Responses13 Apr 2026View
Belfast City Airport responseConsultation Responses15 Apr 2026View
City of Derry Airport responseConsultation Responses15 Apr 2026View
System Operator Northern Ireland SONI responseConsultation Responses15 Apr 2026View
National Air Traffic Services responseConsultation Responses15 Apr 2026View
Northern Ireland Tourist Board responseConsultation Responses15 Apr 2026View
NI Water - Windfarms responseConsultation Responses15 Apr 2026View
Foyle Carlingford & Irish Lights Commission responseConsultation Responses15 Apr 2026View
Health & Safety Executive for NI responseConsultation Responses15 Apr 2026View
Renewable Electricity Team responseConsultation Responses15 Apr 2026View
NIEA responseConsultation Responses15 Apr 2026View
DHSSPS - NI Fire and Rescue Service Headquarters responseConsultation Responses15 Apr 2026View
Mll Telecom Ltd - Windfarms responseConsultation Responses15 Apr 2026View
NIE - Belfast responseConsultation Responses15 Apr 2026View
Royal Society for the Protection of Birds - Headqu responseConsultation Responses15 Apr 2026View
Shared Environmental Services responseConsultation Responses15 Apr 2026View
Civil Aviation Authority responseConsultation Responses15 Apr 2026View
DfE - Geological Survey (NI) responseConsultation Responses15 Apr 2026View
DfI Rivers responseConsultation Responses15 Apr 2026View
DFI Roads - Derry City & Strabane Office responseConsultation Responses15 Apr 2026View
DFI Roads - Derry City & Strabane Office responseConsultation Responses15 Apr 2026View
Foyle Carlingford & Irish Lights Commission responseConsultation Responses15 Apr 2026View
Historic Environment Division (HED) responseConsultation Responses15 Apr 2026View
Royal Society for the Protection of Birds - Headqu responseConsultation Responses15 Apr 2026View
Northern Ireland Tourist Board responseConsultation Responses15 Apr 2026View
Historic Environment Division (HED) responseConsultation Responses15 Apr 2026View
Royal Society for the Protection of Birds - Headqu responseConsultation Responses15 Apr 2026View
Arqiva Limited responseConsultation Responses10 Jun 2026View
Response To Dfi Consultation To Dcsdc.docxConsultation Responses11 Jun 2026View
Dfi Roads ResponseConsultation Responses18 Aug 2026View
Department’s Request For Further InformationCorrespondence with Applicant/Agent/Solicitor2 Oct 2026View
Cover Letter (2) July 2024Correspondence with Applicant/Agent/Solicitor11 Sept 2024View
Non Technical SummaryImpact Assessments and Statements13 May 2024View
Technical Appendix 3.2 Draft Habitat Management And Enhancement Plan (hmep)Impact Assessments and Statements13 May 2024View
Drawing No. 1 Figure 1.1 Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 2 Figure 1.1a Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 3 Figure 1.1b Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 4 Figure 1.1c Site LocationplanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 5 Figure 1.1d Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 6 Figure 1.1e Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 7 Figure 1.1f Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 8 Figure 1.1g Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 9 Figure 1.1h Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 10 Figure 1.1i Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 11 Figure 1.1j Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 12 Figure 1.1k Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 13 Figure 1.1l Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 14 Figure 1.1m Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 15 Figure 1.1n Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 16 Figure 1.1o Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 17 Figure 1.1p Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 18 Figure 1.1q Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 19 Figure 1.1r Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 20 Figure 1.1s Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 21 Figure 1.1t Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 22 Figure 1.1u Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 23 Figure 1.1v Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 24 Figure 1.1w Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 25 Figure 1.1x Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 26 Figure 1.1y Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 27 Figure 1.1z Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 28 Figure 1.1aa Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 29 Figure 1.1ab Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 30 Figure 1.1ac Site Location PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 31 Figure 2 Site Boundary PlanPlans, Maps and Drawings28 Mar 2024View
Drawing No. 32 Figure 2a Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 33 Figure 2b Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 34 Figure 2c Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 35 Figure 2d Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 41 Figure 2j Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 42 Figure 2k Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 43 Figure 2l Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 44 Figure 2m Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 45 Figure 2n Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 36 Figure 2e Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 37 Figure 2f Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 38 Figure 2g Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 39 Figure 2h Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 40 Figure 2i Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 46 Figure 2o Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 47 Figure 2p Site BoundaryPlans, Maps and Drawings28 Mar 2024View
Drawing No. 48 Figure 3 Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 49 Figure 3a Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 50 Figure 3b Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 51 Figure 3c Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 52 Figure 3d Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 53 Figure 3e Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 54 Figure 3f Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 55 Figure 3g Development LayoutPlans, Maps and Drawings28 Mar 2024View
Drawing No. 56 Figure 3h Development LayoutPlans, Maps and Drawings29 Mar 2024View
Drawing No. 57 Figure 3i Development LayoutPlans, Maps and Drawings29 Mar 2024View
Drawing No. 58 Figure 3j Development LayoutPlans, Maps and Drawings29 Mar 2024View
Drawing No. 59 Figure 3k Development LayoutPlans, Maps and Drawings29 Mar 2024View
Drawing No. 60 Figure 4a Turbines 1 And 2 Access Junction General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 61 Figure 4b Turbines 3, 4 And 5 Access Junction General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 62 Figure 4c Turbines 6 And 7 Access Juntions General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 63 Figure 4d Turbines 8, 9, 10, 11 And 12 Access Junction General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 64 Figure 4e Turbine 13 Access Junction General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 65 Figure 4f Turbine 14 Access Junction General ArrangementPlans, Maps and Drawings29 Mar 2024View
Drawing No. 66 Figure 5a Turbine ElevationPlans, Maps and Drawings29 Mar 2024View
Drawing No. 67 Figure 5b Turbine ElevationPlans, Maps and Drawings29 Mar 2024View
Drawing No. 68 Figure 6 Foundation DesignPlans, Maps and Drawings12 Apr 2024View
Drawing No. 69 Figure 3.7 Crane HardstandingPlans, Maps and Drawings12 Apr 2024View
Drawing No. 70 Figure 8 Cable Trench DetailPlans, Maps and Drawings12 Apr 2024View
Drawing No. 71 Figure 9 Typical Transformer ElevationPlans, Maps and Drawings12 Apr 2024View
Drawing No. 72 Figure 10 Typical Substation CompoundPlans, Maps and Drawings12 Apr 2024View
Drawing No. 73 Figure 11 Typical Substation Compound ElevationsPlans, Maps and Drawings12 Apr 2024View
Drawing No. 74 Figure 12 Typical Substation Floor PlansPlans, Maps and Drawings12 Apr 2024View
Drawing No. 75 Figure 13a Typical Primary Temporary Construction CompoundPlans, Maps and Drawings12 Apr 2024View
Drawing No. 76 Figure 13b Typical Secondary Temporary Construction CompoundPlans, Maps and Drawings12 Apr 2024View
Drawing No. 77 Figure 14a Typical Cut Track DesignPlans, Maps and Drawings12 Apr 2024View
Drawing No. 78 Figure 14b Typical Floating Track DesignPlans, Maps and Drawings12 Apr 2024View
Drawing No. 79 Figure 15 Typical Culvert DetailPlans, Maps and Drawings12 Apr 2024View
Environmental Statement Techincal Appendix A7.3 Assessment Of Indirect Effects For Designated Assets With 5kmOther Supporting Information12 Apr 2024View
Pacc Report August 2023Other Supporting Information12 Apr 2024View
Indicative Secondary Tcc Fig 3.12b (1)Other Supporting Information1 May 2024View
Indicative Secondary Tcc Fig 3.12aOther Supporting Information1 May 2024View
Indicative Substation Compound Floor Plans Fig 3.11Other Supporting Information1 May 2024View
Cut Track Access Track Design Fig 3.14(2)Other Supporting Information1 May 2024View
Floating Track Access Track Design Fig 3.15Other Supporting Information1 May 2024View
Indicative Culvert Detail Fig 3.13Other Supporting Information1 May 2024View
Technical Appendix 3.1 ODCEMPOther Supporting Information1 May 2024View
Technical Appendix 3.3 OPMPOther Supporting Information1 May 2024View
Indicative N133 Turbine Elevation Fig 3.4bOther Supporting Information1 May 2024View
Indicative Secondary Tcc Fig 3.12b (1)(1)Other Supporting Information1 May 2024View
Indicative Secondary Tcc Fig 3.12a(1)Other Supporting Information1 May 2024View
Indicative Substation Compound Fig 3.9Other Supporting Information1 May 2024View
Indicative Substation Compound Floor Plans Fig 3.11(1)Other Supporting Information1 May 2024View
Indicative Substation Elevations Fig 3.10Other Supporting Information1 May 2024View
Indicative Turbine Foundation Fig 3.5Other Supporting Information1 May 2024View
Indicative V136 Turbine Elevation Fig 3.4aOther Supporting Information1 May 2024View
Technical Appendix A 3.1 Outline Decommisioning And Construction Environmental PlanOther Supporting Information1 May 2024View
Technical Appendix A 3.3 Outline Peat Management PlanOther Supporting Information1 May 2024View
Cut Track Access Track Design Fig 3.14(3)Other Supporting Information1 May 2024View
Fig3.1 Development LayoutOther Supporting Information1 May 2024View
Fig3.2 Comparison Of The Development Operational Wind Farms And The Consented WindfarmOther Supporting Information1 May 2024View
Fig3.3 Micrositing AreaOther Supporting Information1 May 2024View
Floating Track Access Track Design Fig 3.15(1)Other Supporting Information1 May 2024View
Indicative Cable Trench Detail Fig 3.8Other Supporting Information1 May 2024View
Indicative Crane Hardstanding Fig 3.6Other Supporting Information1 May 2024View
Technical Appendix A2.4 Cumulative DevelopmentsOther Supporting Information1 May 2024View
Technical Appendix A2.1 Scoping Request Part 1Other Supporting Information1 May 2024View
Technical Appendix A2.1 Scoping Request Part 2Other Supporting Information1 May 2024View
Technical Appendix A2.1 Scoping Request Part 3Other Supporting Information1 May 2024View
Fig6 18 Cztv Churchhill Seegronan Gronan AltgolanOther Supporting Information1 May 2024View
Fig6 19 Cztv Pollnalaght PigeontopOther Supporting Information1 May 2024View
Fig6 20 Cztv CrockdunOther Supporting Information1 May 2024View
Fig6 21 Comparative Ztv CraignagappleOther Supporting Information1 May 2024View
Fig6 22 Cztv Barrcregg BallyhanedinOther Supporting Information1 May 2024View
Fig6 23 Lightpollution A1Other Supporting Information1 May 2024View
Indicative Culvert Detail Fig 3.13(1)Other Supporting Information1 May 2024View
Indicative External Transformer Fig 3.7Other Supporting Information1 May 2024View
Fig 4.1 Layout Evolutions And Comparison FinalOther Supporting Information1 May 2024View
Technical Appendix A2.2 Scoping OpinionOther Supporting Information1 May 2024View
Technical Appendix A2.3 Abnormal Load Route WorksOther Supporting Information1 May 2024View
Fig6 24 Ztv Hublighting A1 ReducedOther Supporting Information1 May 2024View
Fig6 25 Lightintensity 20km A1 ReducedOther Supporting Information1 May 2024View
Technical Appendix A6.1 Landscape And Visual Impact Assessment MethodologyOther Supporting Information1 May 2024View
Technical Appendix A6.2 Rvaa WirelinesOther Supporting Information1 May 2024View
Technical Appendix A6.2 Rvva FinalOther Supporting Information1 May 2024View
Technical Appendix A6.3 AviationOther Supporting Information1 May 2024View
Fig6 6 Hh Ztv VpOther Supporting Information1 May 2024View
Fig6 7 HztvOther Supporting Information1 May 2024View
Fig6 8 Ztv LcaOther Supporting Information1 May 2024View
Fig6 9 Ztv DesignationsOther Supporting Information1 May 2024View
Fig6 10 Ztv VrOther Supporting Information1 May 2024View
Fig6 11 Composite 20km A0 ReducedOther Supporting Information1 May 2024View
Fig6 12 CwfOther Supporting Information1 May 2024View
Fig6 13 Comparative Ztv Owenreagh I ExtnOther Supporting Information1 May 2024View
Fig6 14 Cztv Carrickatane Curryfree Slievekirk Extn EglishmountainOther Supporting Information1 May 2024View
Technical Appendix A7.5 Cultural Heritage WirelinesOther Supporting Information1 May 2024View
Technical Appendix A7.1 Archaeological Desk Based AssessmentOther Supporting Information1 May 2024View
Technical Appendix A7.2 Setting Sieving Exercise For Designated Assets Between 5 And 15 KmOther Supporting Information1 May 2024View
Technical Assessment A8.1 Hydrological Unit AsssessmentOther Supporting Information1 May 2024View
Technical Assessment A8.2 Private Water Supply RiskOther Supporting Information1 May 2024View
Technical Assessment A8.3 Indirect Effects GroundwaterOther Supporting Information1 May 2024View
Technical Assessment A8.4 Water Crossing InventoryOther Supporting Information1 May 2024View
Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 1Other Supporting Information1 May 2024View
Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 2Other Supporting Information1 May 2024View
Techincal Assessment A8.5 Owenreagh Outline Surface Water Drainage Strategy Part 3Other Supporting Information1 May 2024View
Fig 8.2 Hydrological CatchmentsOther Supporting Information8 May 2024View
Fig 8.3 Hydrological FeaturesOther Supporting Information8 May 2024View
Fig 8.4 Watercourse CrossingsOther Supporting Information8 May 2024View
Fig 8.5 Wetland HabitatsOther Supporting Information8 May 2024View
Fig 8.1 Hydrological Study AreasOther Supporting Information8 May 2024View
Technical Appendix A9.1 Peat Slide Risk Part 1Other Supporting Information8 May 2024View
Technical Appendix A9.1 Peat Slide Risk Part 2Other Supporting Information8 May 2024View
Technical Appendix A9.1 Peat Slide Risk Part 3Other Supporting Information8 May 2024View
Fig 9.1 Superficial GeologyOther Supporting Information8 May 2024View
Fig 9.2 Bedrock GeologyOther Supporting Information8 May 2024View
Technical Appendix A12.2 Details Of Construction PlantOther Supporting Information8 May 2024View
Technical Appendix A12.3 Metrological And Acoustic DataOther Supporting Information8 May 2024View
Fig 12.1 Construction Noise AssessmentOther Supporting Information8 May 2024View
Fig 12.2 Operational Noise AssessmentOther Supporting Information8 May 2024View
Technical Appendix A15.2 Carbon Balance AssessmentOther Supporting Information8 May 2024View
Technical Appendix A 14.1 Economic Impact Assessment Of Owenreagh Craignagapple Wind FarmOther Supporting Information8 May 2024View
Technical Appendix A15.1 Shadow Flicker AssessmentOther Supporting Information8 May 2024View
Technical Appendix A 13.3 Construction Development ProgrammeOther Supporting Information8 May 2024View
Technical Appendix A 13.4 Access Junction Design And Visibility Splay AssessmentOther Supporting Information8 May 2024View
Technical Appendix A 13.5 Passing Bay Design Part 1Other Supporting Information8 May 2024View
Technical Appendix A 13.5 Passing Bay Design Part 2Other Supporting Information13 May 2024View
Technical Appendix A 13.5 Passing Bay Design Part 3Other Supporting Information13 May 2024View
Fig 13.1 Route To SiteOther Supporting Information13 May 2024View
Fig 13.2 Road Traffic Collision (rtc) AssessmentOther Supporting Information13 May 2024View
Technical Appendix A 13.1 Abnormal Load Route Assessment Part 1Other Supporting Information13 May 2024View
Technical Appendix A 13.1 Abnormal Load Route Assessment Part 2Other Supporting Information13 May 2024View
Technical Appendix A 13.2 Traffic Count DataOther Supporting Information13 May 2024View
Volume 3c Figure 6.26eOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.26fOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27aOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27bOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27cOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27dOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27eOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.27fOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.26aOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.26bOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.26cOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.26dOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.28aOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.28bOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.28cOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.28dOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.28eOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.29aOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.29bOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.29cOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.29dOther Supporting Information29 Mar 2024View
Volume 3c Figure 6.29eOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.29f(1)Other Supporting Information10 Apr 2024View
Volume 3c Figure 6.29f(2)Other Supporting Information10 Apr 2024View
Volume 3c Figure 6.29gOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.29hOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.29iOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30eOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30fOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.30gOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.31aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.31bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.31cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.31dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.32aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.32bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.32cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.32dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.33aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.33bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.33cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.33dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.33eOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34eOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34fOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.34gOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.35aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.35bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.35cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.35dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.36aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.36bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.36cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.36dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.37aOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.37bOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.37cOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.37dOther Supporting Information10 Apr 2024View
Volume 3c Figure 6.37eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.37fOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.38aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.38bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.38cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.38dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39fOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.39gOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.40aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.40bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.40cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.40dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.40eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.41aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.41bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.41cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.41dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.42cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.42dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.42eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43fOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.43gOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.44aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.44bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.44cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.44dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45cOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45fOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.45gOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.42aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.42bOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.48dOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.48eOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.48fOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.48gOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.49aOther Supporting Information11 Apr 2024View
Volume 3c Figure 6.49bOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.49cOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.49dOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.49eOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.50aOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.47cOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.47dOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.47eOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.47fOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.47gOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.48aOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.48bOther Supporting Information12 Apr 2024View
Volume 3c Figure 6.48cOther Supporting Information12 Apr 2024View
Environmental Statement Chapters 1 16Other Supporting Information12 Apr 2024View
Fig 3.10 Indicative Substation ElevationsOther Supporting Information12 Apr 2024View
Collision Risk Modelling (crm) ReportOther Supporting Information12 Apr 2024View
Cut Track Access Track Design Fig 3.14Other Supporting Information12 Apr 2024View
Design And Access Statement Aug 2023Other Supporting Information12 Apr 2024View
Draft Habitat Management And Enhancement Plan (hmep)Other Supporting Information12 Apr 2024View
Economic Impact Assessment Of Owenreagh Craignagapple Wind FarmOther Supporting Information12 Apr 2024View
Fig 3.7 Indicative External TransformerOther Supporting Information12 Apr 2024View
Fig 3.8 Indicative Cable Trench DetailOther Supporting Information12 Apr 2024View
Fig 3.9 Indicative Substation CompoundOther Supporting Information12 Apr 2024View
Abnormal Load Route Assessment (alra)Other Supporting Information12 Apr 2024View
Active Peat AssessementOther Supporting Information12 Apr 2024View
Fig 3.1 Development LayoutOther Supporting Information12 Apr 2024View
Fig 3.4a Indicative V136 Turbine ElevationOther Supporting Information12 Apr 2024View
Fig 3.4b Indicative N133 Turbine ElevationOther Supporting Information12 Apr 2024View
Fig 3.5 Indicative Turbine FoundationOther Supporting Information12 Apr 2024View
Fig 3.6 Indicative Crane HardstandingOther Supporting Information12 Apr 2024View
ES Volume 4 Technical Appendix 7.4 RedactedOther Supporting Information12 Jun 2024View
ES Volume 4 Technical Appendix 10.3 Nvc QuadratsOther Supporting Information12 Jun 2024View
ES Volume 4 Technical Appendix 12.1 Baseline Data Analysis RedactedOther Supporting Information12 Jun 2024View
Information To Inform a Habitats Regulation Assessment Including HraOther Supporting Information12 Jun 2024View
Cover letterOther Supporting Information12 Jun 2024View
Planning StatementOther Supporting Information12 Jun 2024View
ES Volume 3 Figure 15.1 Links & Proposed NIE Overhead PowerlineOther Supporting Information12 Jun 2024View
ES Volume 4 Technical Appendix 7.3Other Supporting Information12 Jun 2024View
Fei July 2024Other Supporting Information11 Sept 2024View
Fei Submission Excluding FiguresOther Supporting Information11 Sept 2024View
Fei Submission FiguresOther Supporting Information11 Sept 2024View
Planning Drawings Figure 1 1o Znd 1 1pOther Supporting Information11 Sept 2024View
Planning FormOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.29a Vp4 Moor Lough Picnic AreaOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.30a Vp5 Holyhill Road, HolyhillOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.32a Vp7 Strathmourne Road, StrathbaneOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.35a Vp10 Slievbeg Road, SlievbegOther Supporting Information11 Sept 2024View
Viewpoin Plan Figure Fei.6.41a A5 Strule River ValleyOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.40a Vp15 Foreglen Road, KillalooOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.36a Vp11 BallynamallaghtOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.37a Vp12 B48 DunnamanaghOther Supporting Information11 Sept 2024View
Viewpoint Plan Figure Fei.6.38a Vp13 Lenamore Picnic Area, GortinOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.39a Vp14 Ulster Way At Bolaght MountainOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.44a Vp19 BallindraitOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.45a Vp20 Meendamph Road, CrockrourOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.46a Vp21 GlenmoranOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.47a Vp22 Aghafad RoadOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.42a Vp17 Bells Park, GlebeOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.48a Vp23 Bessy BellOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6.50a Vp25 RaphoeOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.626a Vp1 Koram Road, LigfordrumOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.631a Vp6 President Wilson's HouseOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei.6287a Vp2 Koram Road, Ligfordrum 2Other Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei6. 4a Vp9 Harry Averys CastleOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei6.28a Vp3 Napple Road, Ballykeery BridgeOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei6.33a Vp8 Victoria BridgeOther Supporting Information12 Sept 2024View
Viewpoint Plan Figure Fei6.49a Vp24 Silverhill RoadOther Supporting Information12 Sept 2024View
Viwpoint Plan Figure Fei.6.43a Vp18 Mullaghclogha, Sperrin MountainsOther Supporting Information12 Sept 2024View
RPP&C LETTER TO ENVIRONEMNET HEALTHMiscellaneous21 Nov 2025View
RPP&C LETTER TO NIEAMiscellaneous21 Nov 2025View
Letter To Niea Re Outstanding ConsultationsMiscellaneous2 Dec 2025View
Consultations Issued ReportConsultation Requests19 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Consultation Open
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.