Council planning record

Quarrying operations including the extraction of minerals (sand and gravel) over an area of 19.3ha to a final depth of up to 54mAOD; the loading and transportation of materials from the site; the construction of a new site entrance and wheel wash, internal haul roads and earthen screening bunds; the restoration of the site to biodiversity and agricultural uses; and all ancillary works related to same. Planning permission is sought for a period of up to 20 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR).

Lands to the West of L1045 Killeshandra Road, Clontygrigny and Callaghs, Ballyconnell, Co Cavan.

WithdrawnReference: SPD/2023/0958/TBADepartment for Infrastructure

Application location

Lands to the West of L1045 Killeshandra Road, Clontygrigny and Callaghs, Ballyconnell, Co Cavan.

This record has no verified map location.

Application summary

Status
Withdrawn
Application type
Transboundary Application
Received
17 Apr 2023
Validated
17 Apr 2023
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

Quarrying operations including the extraction of minerals (sand and gravel) over an area of 19.3ha to a final depth of up to 54mAOD; the loading and transportation of materials from the site; the construction of a new site entrance and wheel wash, internal haul roads and earthen screening bunds; the restoration of the site to biodiversity and agricultural uses; and all ancillary works related to same. Planning permission is sought for a period of up to 20 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR).

Proposal details

Reference
SPD/2023/0958/TBA
Ward
Derrylin

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 67 of 67

DocumentPublishedAction
Chief Exec Fermanagh And Omagh responseConsultation Responses25 May 2023View
DfI Rivers responseConsultation Responses25 May 2023View
DfE - Geological Survey (NI) responseConsultation Responses30 Jun 2023View
NI Water - Strategic Applications responseConsultation Responses30 Jun 2023View
Historic Environment Division (HED) responseConsultation Responses30 Jun 2023View
DFI Roads - Omagh Office responseConsultation Responses30 Jun 2023View
NIEA responseConsultation Responses30 Jun 2023View
Environ Health Fermanagh And Omagh responseConsultation Responses30 Jun 2023View
Chief Exec Fermanagh And Omagh responseConsultation Responses27 Aug 2024View
NIEA responseConsultation Responses27 Aug 2024View
NI Water - Strategic Applications responseConsultation Responses27 Aug 2024View
DfI Response to Cavan County Council (29.08.24)Correspondence with council29 Aug 2024View
Letter From Cavan County Council - 13-09-2024Correspondence with council27 Sept 2024View
Appropriate Assessment Screening Report Received 21 03 2023Impact Assessments and Statements19 Apr 2023View
Environmental Impact Assessment Report Non Technical Summary Received 21 03 2023Impact Assessments and Statements19 Apr 2023View
Environmental Impact Assessment Report Volume 1 Received 21 03 2023Impact Assessments and Statements19 Apr 2023View
Plans, Sections, Elevations Received 21 03 2023Impact Assessments and Statements19 Apr 2023View
Eiar Appendices 7.1 Noise Impact Assessment ReportImpact Assessments and Statements15 May 2023View
Eiar Appendices 7.1 Figure 7.5 Predicted Noise Levels Phase 4Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.1 Location & ContextImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.2 Landscape AnalysisImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.3 Visual AnalysisImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.4 Illustrative Intervisability ImagesImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.5 Photo Viewpoint LocationsImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.6 Photo Viewpoint 2Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.7 Photo Viewpoint 3Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.8 Photo Viewpoint 4Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.9 Photo Viewpoint 5Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.10 Photo Viewpoint 6Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Figure 9.11 Photo Viewpoint 7Impact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Landscape And Visual Impact AssessmentImpact Assessments and Statements15 May 2023View
Eiar Appendices 10.1 Dust Impact Assessment ReportImpact Assessments and Statements15 May 2023View
Eiar Appendices 9.1 Landscape Restoration ConceptImpact Assessments and Statements15 May 2023View
Eiar Appendices 4.2 Site Layout Plan (december 2020 Survey)Impact Assessments and Statements15 May 2023View
Eiar Appendices 7.1 Figure 7.4 Predicted Noise Levels Phase 3Impact Assessments and Statements15 May 2023View
Eiar Appendices 7.1 Figure 7.3 Predicted Noise Levels Phase 2Impact Assessments and Statements15 May 2023View
Eiar Appendices 7.1 Figure 7.2 Predicted Noise Levels Phase 1Impact Assessments and Statements15 May 2023View
Eiar Appendices 6.1 Hydrological & Hydrogeological Impact AssessmentImpact Assessments and Statements15 May 2023View
Eiar Appendices 4.3 Ballyheady Restoration ConceptImpact Assessments and Statements15 May 2023View
Eiar Appendices 4.2 Planning Application Cross SectionsImpact Assessments and Statements15 May 2023View
Eiar Appendices 11.1 Transport And Traffic Impact Assessment ReportImpact Assessments and Statements15 May 2023View
Eiar Appendices 8.1 Ecological Impact AssessmentImpact Assessments and Statements15 May 2023View
Eiar Appendices 2.1 Alternatives MapImpact Assessments and Statements15 May 2023View
Eiar Appendices 2.1 All Quarries Within 32kmImpact Assessments and Statements15 May 2023View
Environmental Impact Assessment Report Volume 1 February 2023Impact Assessments and Statements15 May 2023View
Environmental Impact Assessment Report Non Technical Summary February 2023Impact Assessments and Statements15 May 2023View
Eiar Appendices 13.1 Extractive Waste Questionnaire October 2022Impact Assessments and Statements15 May 2023View
Eiar Appendices 12.1 Archaeological Impact AssessmentImpact Assessments and Statements15 May 2023View
Eiar Appendices 4.1 Proposed Site EntranceImpact Assessments and Statements15 May 2023View
Site Layout Plan Received 21 03 2023Plans, Maps and Drawings19 Apr 2023View
Site Layout Plan (1) Received 21 03 2023Plans, Maps and Drawings19 Apr 2023View
Site Layout Plan (2) Received 21 03 2023Plans, Maps and Drawings19 Apr 2023View
Site Location Map Received 21 03 2023Plans, Maps and Drawings19 Apr 2023View
Application Cover Letter Received 21 03 2023Other Supporting Information19 Apr 2023View
Application Form Part A Received 21 03 2023Other Supporting Information19 Apr 2023View
Bcl Hydro Fi ResponseOther Supporting Information3 May 2024View
DrawingsOther Supporting Information3 May 2024View
Further Information Cover LetterOther Supporting Information3 May 2024View
Iso 14001 CertOther Supporting Information3 May 2024View
Mannock Refuelling ProcedureOther Supporting Information3 May 2024View
Vegetatiojn RemovalOther Supporting Information3 May 2024View
Vegetation Removal Method StatementOther Supporting Information3 May 2024View
Visibility Spray DrawingsOther Supporting Information3 May 2024View
Wheel Wash DetailsOther Supporting Information3 May 2024View
Natura Impact AssessmentOther Supporting Information8 May 2024View
Correspondence Between Cavan County Council And Dfi (17.04.2023)Miscellaneous19 Apr 2023View
Dfi Response To Cavan County Council (30.06.2023)Miscellaneous3 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.