6 no. wind turbines with an overall blade tip height of up to 135 metres and all associated foundations and hard standing areas, 1 no. borrow pit, 1 no. permanent anemometry mast up to a height of 100 metres, upgrade of existing and provision of new site access roads and associated drainage , 1 no. electrical substation compound, which will have 1 no. control building, associated electrical plant and equipment, and a waste water holding tank. 1 no. temporary construction compound and all associated underground electrical and communications cabling connecting the turbine to the proposed on site substation, as well as on site underground cabling to facilitate electrical connection to the national grid, and all associated site development works, including amenity trails on wind farm roads, car parking, seating benches and signage.

Momeen and Lettergull Lifford PO Co Donegal

Consultation OpenReference: LA11/2018/0937/TBADepartment for Infrastructure

Last published check: 8 Oct 2026, 02:48. Check the council record for more recent changes.

Application location

Momeen and Lettergull Lifford PO Co Donegal

This record has no verified map location.

Application summary

Status
Consultation Open
Application type
Transboundary Application
Received
2 Oct 2018
Validated
2 Oct 2018
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

6 no. wind turbines with an overall blade tip height of up to 135 metres and all associated foundations and hard standing areas, 1 no. borrow pit, 1 no. permanent anemometry mast up to a height of 100 metres, upgrade of existing and provision of new site access roads and associated drainage , 1 no. electrical substation compound, which will have 1 no. control building, associated electrical plant and equipment, and a waste water holding tank. 1 no. temporary construction compound and all associated underground electrical and communications cabling connecting the turbine to the proposed on site substation, as well as on site underground cabling to facilitate electrical connection to the national grid, and all associated site development works, including amenity trails on wind farm roads, car parking, seating benches and signage.

Proposal details

Reference
LA11/2018/0937/TBA
Ward
Slievekirk

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 147 of 147

DocumentPublishedAction
PAO764999_Original Application Form_001Application Form26 Nov 2022View
PAO764999_Shared Environmental Services_Consultation Response_712021153051.pdfConsultation Responses26 Nov 2022View
PAO764999_RA-Rivers Agency Headquarters_Consultation Response_1192019165715.pdfConsultation Responses26 Nov 2022View
PAO764999_NIEA_Consultation Response_2210201915444.pdfConsultation Responses26 Nov 2022View
PAO764999_IN-Roads Service Londonderry_Consultation Response_269201920394.DOCXConsultation Responses26 Nov 2022View
PAO764999_IN-Roads Service Londonderry_Consultation Response_17112018194027.DOCXConsultation Responses26 Nov 2022View
PAO764999_Historic Environment Division (HED)_Consultation Response_1822020141641.PDFConsultation Responses26 Nov 2022View
PAO764999_Foyle Carlingford Irish Lights Commiss_Consultation Response_22102019111543.pdfConsultation Responses26 Nov 2022View
PAO764999_Environmental Health Derry City and Stra_Consultation Response_2782019153446.docxConsultation Responses26 Nov 2022View
PAO764999_Environmental Health Derry City and Stra_Consultation Response_22102018165745.docxConsultation Responses26 Nov 2022View
PAO764999_Chief Exec Derry City and Strabane_Consultation Response_1992019951.pdfConsultation Responses26 Nov 2022View
PAO764999_BW-Royal Society for the Protection of B_Consultation Response_292019161010.pdfConsultation Responses26 Nov 2022View
PAO764999_RA-Rivers Agency Headquarters_Consultation Response_1411201815916.pdfConsultation Responses26 Nov 2022View
PAO764999_Chief Exec Derry City and Strabane_Consultation Response_27112018113625.pdfConsultation Responses26 Nov 2022View
PAO764999_Foyle Carlingford Irish Lights Commiss_Consultation Response_2211201812535.pdfConsultation Responses26 Nov 2022View
PAO764999_NIEA_Consultation Response_1311201813400.pdfConsultation Responses26 Nov 2022View
PAO764999_BW-Royal Society for the Protection of B_Consultation Response_1112201815243.pdfConsultation Responses26 Nov 2022View
PAO764999_Historic Environment Division (HED)_Consultation Response_8112018153136.PDFConsultation Responses26 Nov 2022View
PAO764999_Shared Environmental Services_Consultation Response_16112018142222.pdfConsultation Responses26 Nov 2022View
Appendix 11-1 - A0 map (Fig 11.8)Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 11Impact Assessments and Statements26 Nov 2022View
Appendix 4-1 - Wind Farms and Health Literature Review - Chapman 2015Impact Assessments and Statements26 Nov 2022View
Appendix 6-3 - Birds Summary TablesImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Lettergull Photomontages - Received 10-10-18_Part2Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 13Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 12Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement - Received 14-08-19 - Part 2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch7 - Soils and Geology - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 5Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 16Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch1 - Introduction - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 4Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 8Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch10 - Noise and Vibration - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch11 - Landscape Visual - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 3-4 - Outline Traffic Management PlanImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 2 - Lettergull Photomontages - Received 14-08-19 - Part 2Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement - Received 14-08-19 - Part 1Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part1Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part5Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part7Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch14 - Interactions - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 10-4 - Noise Contour for Standard Mode Operation (9 ms)Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 2 - Lettergull Photomontages - Received 14-08-19 - Part 3Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 3Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 5Impact Assessments and Statements26 Nov 2022View
Appendix 7-1 - Trial Pit and Borehole LogsImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 14Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch5 - Flora and Fauna - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part6Impact Assessments and Statements26 Nov 2022View
Appendix 6-6 - Birds Monitoring AppendixImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch13 - Material Assets - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 10-3 - Calibration CertificatesImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Lettergull Photomontages - Received 10-10-18_Part3Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part9Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch6 - Ornithology - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 10-2 - Glossary of termsImpact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part3Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement_Part1Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 2Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 10Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part4Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement_Part3Impact Assessments and Statements26 Nov 2022View
Appendix 3-1 - Site Layout Planning Drawings A4Impact Assessments and Statements26 Nov 2022View
Appendix 2-2 - Community Consultation LeafletImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 17Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement - Received 14-08-19 - Part 3Impact Assessments and Statements26 Nov 2022View
Appendix 6-2 - Birds Survey EffortImpact Assessments and Statements26 Nov 2022View
Appendix 2-1 - Scoping RepliesImpact Assessments and Statements26 Nov 2022View
Appendix 3-3 - CEMPImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 6Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch12 - Cultural Heritage - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 6-5 - Collision Risk ModelImpact Assessments and Statements26 Nov 2022View
Appendix 5-1 - EIS 2005 ExcerptsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch2 - Background - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 2Impact Assessments and Statements26 Nov 2022View
Appendix 4-2 - EMF Booklet - Eirgrid 2014 (pdf version)Impact Assessments and Statements26 Nov 2022View
Environmental Statement - References - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 2 - Lettergull Photomontages - Received 14-08-19 - Part 1Impact Assessments and Statements26 Nov 2022View
Appendix 10-5 - Directional Noise Prediction Model DataImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch8 - Water - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 15Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 7Impact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part8Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch3 - Description F - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Environmental Statement - 0 - Cover TOC and NTS - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Natura Impact Statement_Part2Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 6Impact Assessments and Statements26 Nov 2022View
Appendix 6-4 - Birds Technical Survey Data_Part3Impact Assessments and Statements26 Nov 2022View
Appendix 6-4 - Birds Technical Survey Data_Part2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch9 - Air and Climate - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
Appendix 8-1 - Laboratory ReportsImpact Assessments and Statements26 Nov 2022View
Appendix 5-2 - Bat Report_Part2Impact Assessments and Statements26 Nov 2022View
Appendix 13-1 - Traffic Assessment of Underground CablingImpact Assessments and Statements26 Nov 2022View
Appendix 6-1 - Birds Species ListImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 1Impact Assessments and Statements26 Nov 2022View
Appendix 4-3 - House Prices Study - CXC Scotland 2016Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Lettergull Photomontages - Received 10-10-18_Part1Impact Assessments and Statements26 Nov 2022View
EIA Report - Volume 3 - Appendices - Received 14-08-19 - Part 9Impact Assessments and Statements26 Nov 2022View
Appendix 6-4 - Birds Technical Survey Data_Part1Impact Assessments and Statements26 Nov 2022View
Appendix 10-1 - Calculation Parameters and SettingsImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 7Impact Assessments and Statements26 Nov 2022View
Appendix 9-1 Carbon Loss Calculuation SpreadsheetImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 4Impact Assessments and Statements26 Nov 2022View
Appendix 12-1 - Photographic RecordImpact Assessments and Statements26 Nov 2022View
EIA Report - Volume 1 - NTS and EIA - Received 14-08-19 - Part 1Impact Assessments and Statements26 Nov 2022View
Appendix 3-2 - Proposed Underground Grid Connection Route Drawings A3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch4 - Human Beings - Received 10-10-18Impact Assessments and Statements26 Nov 2022View
PAO764999_Site Location Plan_001Plans, Maps and Drawings26 Nov 2022View
Site Layout - Received 14-08-19Plans, Maps and Drawings26 Nov 2022View
Consent David Wilson - 160242 - 2017.12.05 - Received 14-08-19Other Supporting Information26 Nov 2022View
Newspaper Ad - Received 14-08-19Other Supporting Information26 Nov 2022View
Response to Donegal County Council - Dated 05-12-18Other Supporting Information26 Nov 2022View
Planning Application Form Final - Received 14-08-19Other Supporting Information26 Nov 2022View
Consent Kenneth Vance - 160242 - 2017.12.05 - Received 14-08-19Other Supporting Information26 Nov 2022View
Site Notice- Final - Received 14-08-19Other Supporting Information26 Nov 2022View
EFT Confirmation - Received 14-08-19Other Supporting Information26 Nov 2022View
Letter from An Bord Pleanala - Received 14-08-19Other Supporting Information26 Nov 2022View
160242 - Cover Ltr to DCC - Received 14-08-19Other Supporting Information26 Nov 2022View
Decision Letter from An Bord Pleanála - 24-07-2020Other Supporting Information26 Nov 2022View
Letter to An Bord Pleanala - Dated 23-10-19Other Supporting Information26 Nov 2022View
Letter from An Bord PlenalaMiscellaneous26 Nov 2022View
PAO764999_Miscellaneous_001Miscellaneous26 Nov 2022View
PAO764999_Miscellaneous_003Miscellaneous26 Nov 2022View
PAO764999_Miscellaneous_002Miscellaneous26 Nov 2022View
PAO764999_Miscellaneous_006Miscellaneous26 Nov 2022View
PAO764999_Miscellaneous_004Miscellaneous26 Nov 2022View
PAO764999_Miscellaneous_005Miscellaneous26 Nov 2022View
EIA Consultation Letter - PWADXUSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXTSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXSSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXRSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXQSV2R002Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXPSV2R003Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXPSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXOSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PWADXNSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGUQHFSVZU000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDOSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDNSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDMSV2R002Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDLSV2R003Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDLSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDKSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDJSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PGSYDISV2R000Consultation Requests26 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source

Decision & conditions

Not Available
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.