Application for a ten year planning permission for a wind farm with a 30 year operational life (from date of commissioning) and all associated works consisting of (a) up to 7 no. wind turbines with a tip height of up to 150m all associated foundations and hardstanding areas, (b) 1 no. on-site electrical substation, (c) 1 no. temporary construction compound, (d) 1 no. anemometry mast with a height of up to 100m, (e) recreational amenety trial and associated signage, parking, and recreational facilities, (f) all associated underground electrical and communications cabling connecting the turbines to the proposed on-site substation, (g) upgrading of existing access tracks and provision of any new site access roads required including new site access onto the local road network in the townland of Tullyhorky and associated drainage, (h) excavation of 1 no. borrow pit and (i) all associated site development works (including tree felling) at Behy, Cashelard, Tullyhorkey, Dobally, Co Donegal.

Behy Cashelard Tullyhorkey and Doobally approx. 2.74km. north of Beleek.

Consultation OpenReference: LA10/2019/0077/TBADepartment for Infrastructure

Application location

Behy Cashelard Tullyhorkey and Doobally approx. 2.74km. north of Beleek.

This record has no verified map location.

Application summary

Status
Consultation Open
Application type
Transboundary Application
Received
14 Jan 2019
Validated
14 Jan 2019
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

Application for a ten year planning permission for a wind farm with a 30 year operational life (from date of commissioning) and all associated works consisting of (a) up to 7 no. wind turbines with a tip height of up to 150m all associated foundations and hardstanding areas, (b) 1 no. on-site electrical substation, (c) 1 no. temporary construction compound, (d) 1 no. anemometry mast with a height of up to 100m, (e) recreational amenety trial and associated signage, parking, and recreational facilities, (f) all associated underground electrical and communications cabling connecting the turbines to the proposed on-site substation, (g) upgrading of existing access tracks and provision of any new site access roads required including new site access onto the local road network in the townland of Tullyhorky and associated drainage, (h) excavation of 1 no. borrow pit and (i) all associated site development works (including tree felling) at Behy, Cashelard, Tullyhorkey, Dobally, Co Donegal.

Proposal details

Reference
LA10/2019/0077/TBA
Ward
Belleek and Boa

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 142 of 142

DocumentPublishedAction
PAO780187_Original Application Form_001Application Form26 Nov 2022View
PAO780187_NIEA_Consultation Response_352019111230.pdfConsultation Responses26 Nov 2022View
PAO780187_Historic Environment Division (HED)_Consultation Response_164201981258.PDFConsultation Responses26 Nov 2022View
PAO780187_Historic Environment Division (HED)_Consultation Response_30102019142313.PDFConsultation Responses26 Nov 2022View
PAO780187_Historic Environment Division (HED)_Consultation Response_2611201916012.pdfConsultation Responses26 Nov 2022View
PAO780187_Chief Exec Fermanagh and Omagh_Consultation Response_31220191294.pdfConsultation Responses26 Nov 2022View
PAO780187_RA-Rivers Agency Headquarters_Consultation Response_511201912554.pdfConsultation Responses26 Nov 2022View
PAO780187_BW-Royal Society for the Protection of B_Consultation Response_12112019123420.pdfConsultation Responses26 Nov 2022View
PAO780187_Foyle Carlingford Irish Lights Commiss_Consultation Response_19112019142054.pdfConsultation Responses26 Nov 2022View
PAO780187_BW-Royal Society for the Protection of B_Consultation Response_245201913112.pdfConsultation Responses26 Nov 2022View
Fermanagh and Omagh District Council Consultation Response - Dated 12-03-19Consultation Responses26 Nov 2022View
PAO780187_Foyle Carlingford Irish Lights Commiss_Consultation Response_63201991348.pdfConsultation Responses26 Nov 2022View
PAO780187_NIEA_Consultation Response_26112019152937.pdfConsultation Responses26 Nov 2022View
PAO780187_RA-Rivers Agency Headquarters_Consultation Response_1332019153820.pdfConsultation Responses26 Nov 2022View
PAO780187_Environ Health Fermanagh and Omagh_Consultation Response_1511201914553.docxConsultation Responses26 Nov 2022View
PAO780187_Environ Health Fermanagh and Omagh_Consultation Response_143201915433.docxConsultation Responses26 Nov 2022View
PAO780187_Chief Exec Fermanagh and Omagh_Consultation Response_84201917434.docxConsultation Responses26 Nov 2022View
Environmental Statement - Appendix 6-9 - Bird Monitoring ProgrammeImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 5-2 Turbine Base AssessmentImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 5-1 Kick Sample ReportsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 12-2 - Monument Descriptions - FImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part7Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 8-1 - Laboratory ResultsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-6 - ESB Standard Specification 38kVImpact Assessments and Statements26 Nov 2022View
Env. Statement - Vol. 2 - Derrykillew Wind Farm Extension Photomontages - Received 21-10-19_Part1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part5Impact Assessments and Statements26 Nov 2022View
Env. Statement - Vol. 2 - Derrykillew Wind Farm Extension Photomontages - Received 21-10-19_Part2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch4 Population and Human HealthImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-2 - Replanting Assessment with AppendicesImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-6 - Directional Noise Prediction Model DataImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch2 BackgroundImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 12-1 - Site Description 2018.10.30 - FImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch5 Biodiversity, Flora and Fauna - Part 2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 4-1 - Wind Farms and Health Literature Review - Chapman 2015Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-4 - Proposed Grid Connection Route DrawingsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part7Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Non-Technical SummaryImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-4 - Model Calculation Parameters and SettingsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 13-2 - Aviation Technical NoteImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch7 Land Soils GeologyImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part6Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch11 Landscape Visual - Part 2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 2-2 - Scoping Responses - NIImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch11 Landscape Visual - Part 1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-1 - Sensitive Receptor LocationsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Derrykillew Wind Farm Extension Photomontages - Part 5Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 4-3 - House Prices Study - CXC Scotland 2016Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-6 - Collision Risk AssessmentImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-4 - Survey DataImpact Assessments and Statements26 Nov 2022View
Environmental Statement - NIS - Derrykillew Wind Farm ExtensionImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 2-3 - Community Consultation InformationImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 8-2 - Watercourse Crossing Hydraulic AssessmentImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part6Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch10 Noise VibrationImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-5 - CEMPImpact Assessments and Statements26 Nov 2022View
Natura Impact Statement - Derrykillew Wind Farm Extension - Received 21-10-19Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch14 InteractionImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 13-1 - RTE Signed Protocol AgreementImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch12 Cultural HeritageImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch6 BirdsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch11 Landscape Visual - Part 3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-3 - Calibration CertificatesImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-1 - Species ListImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-3 - ELS Route SurveyImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-2 - Survey EffortImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Derrykillew Wind Farm Extension Photomontages - Part 1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch9 Air and ClimateImpact Assessments and Statements26 Nov 2022View
Environmental Statement - ReferencesImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 4-4 - Cumulative Daily and Annual Shadow FlickerImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Derrykillew Wind Farm Extension Photomontages - Part 2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 3-1 - Site Layout DrawingsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 11-1 - ZTV A0 V3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 11-2 - LVIA MethodologyImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part4Impact Assessments and Statements26 Nov 2022View
Env. Statement - Vol. 2 - Derrykillew Wind Farm Extension Photomontages - Received 21-10-19_Part4Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 12-3 - Wireframe References_2018.10.16 - FImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part5Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 7-1 - Peat Stability Assessment Report (Rev 2)Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 2-1 - Scoping Responses - ROIImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-5 - 2014-15 Baseline Surveys_V2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-8 - HH Enhancement PlanImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-2 - GlossaryImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch13 Material AssetsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 4-2 - EMF Booklet - Eirgrid 2014Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part9Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part2Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Derrykillew Wind Farm Extension Photomontages - Part 3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch1 IntroductionImpact Assessments and Statements26 Nov 2022View
Env. Statement - Vol. 2 - Derrykillew Wind Farm Extension Photomontages - Received 21-10-19_Part5Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part8Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 1 - Non-Technical Summary and Main Report - Received 21-10-19_Part1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 2 - Derrykillew Wind Farm Extension Photomontages - Part 4Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 10-5 - Noise Contour for Standard Operation at 7 m_sImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 5-3 Rhododendron MPImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch3 DescriptionImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Volume 3 - Appendices - Received 21-10-19_Part4Impact Assessments and Statements26 Nov 2022View
Env. Statement - Vol. 2 - Derrykillew Wind Farm Extension Photomontages - Received 21-10-19_Part3Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Cover and Table of ContentsImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch5 Biodiversity, Flora and Fauna - Part 1Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 7-2 - Peat and Spoil Management Plan (Rev 2)Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Ch8 WaterImpact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 9-1 - Carbon Calculations 2018.10.11Impact Assessments and Statements26 Nov 2022View
Environmental Statement - Appendix 6-3 - Summary TablesImpact Assessments and Statements26 Nov 2022View
Decision letter by An Bord Pleanála - 30-11-2020Appeal Decisions & Reports26 Nov 2022View
PAO780187_Site Location Plan_001Plans, Maps and Drawings26 Nov 2022View
Cover Letter from An Bord Pleanala - Received 21-10-19Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_001Other Supporting Information26 Nov 2022View
Derrykillew WF Extension - Planning Drawings - Received 21-10-19Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_004Other Supporting Information26 Nov 2022View
Decision letter by An Bord Pleanála - 30-11-2020Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_006Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_002Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_003Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_007Other Supporting Information26 Nov 2022View
Response to Donegal County Council - Dated 7-05-2019Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_005Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_008Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_010Other Supporting Information26 Nov 2022View
PAO780187_Technical Specification_009Other Supporting Information26 Nov 2022View
Departmental Letter to An Bord Pleanala - 3.12.2019Miscellaneous26 Nov 2022View
Letter from An Bord Pleanala - received 20.12.2019Miscellaneous26 Nov 2022View
EIA Consultation Letter - Q0G0V0SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ09SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ08SV2R002Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ07SV2R003Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ07SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ06SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ05SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ04SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PZTQ03SV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHXSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHWSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHVSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHUSV2R002Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHTSV2R003Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHTSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHSSV2R000Consultation Requests26 Nov 2022View
EIA Consultation Letter - PNHAHRSV2R000Consultation Requests26 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source

Decision & conditions

Not Available
Decision letter by An Bord Pleanála - 30-11-2020
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.