Council planning record

Provision of a new 400kV substation including:A GIS hall sited centrally, a lower annex sits along the eastern side of the main hall, two smaller-scale, single-storey amenity buildings, five Super Grid Transformers (SGT) and six gantries; A backup diesel generator with enhanced noise attenuation;Laying out of a parking area for vehicles, with additional space reserved additional overflow parking; Earthworks and fencing

Former Littlebrook Power Station Rennie Drive Dartford Kent DA1 5PT

DecidedReference: 18/01017/FULDartford Borough Council

Last published check: 3 Oct 2026, 15:51. Check the council record for more recent changes.

Application location

Former Littlebrook Power Station Rennie Drive Dartford Kent DA1 5PT

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Application
Received
8 Aug 2018
Validated
8 Aug 2018
Determination deadline
7 Nov 2018
Local authority
Dartford Borough Council

Application overview

Provision of a new 400kV substation including:A GIS hall sited centrally, a lower annex sits along the eastern side of the main hall, two smaller-scale, single-storey amenity buildings, five Super Grid Transformers (SGT) and six gantries; A backup diesel generator with enhanced noise attenuation;Laying out of a parking area for vehicles, with additional space reserved additional overflow parking; Earthworks and fencing

Proposal details

Reference
18/01017/FUL
Alternative references
PP-07016803
Ward
Bridge
Parish
Not Parished

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
REPTILE MITIGATION STRATEGYAdditional Information or Correspondence · PDF22 Apr 2020View
DELEGATED REPORT SHEETReport · PDF21 Nov 2019View
LIZARD ORCHID SURVEY RESULTSDrawings · PDF21 Nov 2019View
APPROVEDDecision Notice · PDF15 Nov 2019View
NEWSPAPER NOTICE ACTUALAdditional Information or Correspondence · PDF30 Jul 2019View
GENERATOR PDD-20696-ELE-001 REV00Drawings · PDF29 Apr 2019View
2 UNIT BLDG PDD-20696-LAY-017 REV01Drawings · PDF29 Apr 2019View
4 UNIT AMENITY PDD-20696-LAY-018 REV 00Drawings · PDF29 Apr 2019View
FENCING PDD-20696-LAY-019 REV00Drawings · PDF29 Apr 2019View
FRA ADDENDUM NOV 2018Report · PDF17 Dec 2018View
REVISED TRANSPORT STATEMENTReport · PDF4 Oct 2018View
E-MAIL FROM AGENTAdditional Information or Correspondence · PDF4 Oct 2018View
ECOLOGY REPORTReport · PDF9 Aug 2018View
TOWNSCAPE AND VISUAL APPRAISALReport · PDF9 Aug 2018View
REPTILE MITIGATION STRATEGYReport · PDF9 Aug 2018View
GEOTECHNICAL INTERPRETIVE REPORTReport · PDF9 Aug 2018View
PART 1 FLOOD RISK ASSESSMENTReport · PDF9 Aug 2018View
PART 2 FLOOD RISK ASSESSMENTReport · PDF9 Aug 2018View
PART 3 FLOOD RISK ASSESSMENTReport · PDF9 Aug 2018View
LITTLEBROOK DORMOUSE HABITAT ASSESSMENTReport · PDF8 Aug 2018View
LITTLEBROOK CETTIS WARBLER TECHNICAL NOTEReport · PDF8 Aug 2018View
LITTLEBROOK DESIGN AND ACCESS STATEMENT INCORPORATING A PLANNING STATEMENT(1)Report · PDF8 Aug 2018View
LITTLEBROOK ARCHAEOLOGICAL DBAReport · PDF8 Aug 2018View
NOISE REPORTReport · PDF8 Aug 2018View
PDD-20696-LAY-006 ELEVATIONSDrawings · PDF8 Aug 2018View
PDD-20696-LAY-009 LAYOUTDrawings · PDF8 Aug 2018View
PDD-20696-LAY-008 SWITCHGEAR LAYOUTDrawings · PDF8 Aug 2018View
LITTLEBROOK SITE LOCATION PLANDrawings · PDF8 Aug 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.