Council planning record

Request for screening opinion of London Power Tunnell II

London Tunnels II

DecidedReference: 18/00763/SCREENDartford Borough Council

Last published check: 3 Oct 2026, 22:25. Check the council record for more recent changes.

Application location

London Tunnels II

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Screening Opinion
Received
11 Jun 2018
Validated
11 Jun 2018
Determination deadline
6 Aug 2018
Local authority
Dartford Borough Council

Application overview

Request for screening opinion of London Power Tunnell II

Proposal details

Reference
18/00763/SCREEN
Ward
Heath OLD
Parish
Un-Parished Area Of Dartford OLD 2019

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 71 of 71

DocumentPublishedAction
APPENDIX B - INDICATIVE PROGRAMMEReport · PDF12 Nov 2019View
APPENDIX C - CIRCUIT 3 CONSULTATION REPORT_PART1Report · PDF12 Nov 2019View
APPENDIX C - CIRCUIT 3 CONSULTATION REPORT_PART2Report · PDF12 Nov 2019View
APPENDIX D - SETTLEMENT REPORTReport · PDF12 Nov 2019View
APPENDIX E - VIBRATION ASSESSMENTReport · PDF12 Nov 2019View
APPENDIX F - LONDON POWER TUNNELS II C3 CEMP_CLEAN COMBINEDReport · PDF12 Nov 2019View
APPENDIX G METHODOLOGYReport · PDF12 Nov 2019View
APPENDIX H - DRAINAGEReport · PDF12 Nov 2019View
APPENDIX I - NOISEReport · PDF12 Nov 2019View
APPENDIX L - C3 HYDROGEOLOGICAL INTERPRETIVE REPORTReport · PDF12 Nov 2019View
LPT II CIRCUIT 3 EAR - MAIN TEXTReport · PDF12 Nov 2019View
APPENDIX J LPT II - HURST VERIFIED VIEWS TVA 2019Report · PDF12 Nov 2019View
APPENDIX J.4 -TEMPORARY HAUL ROAD AND DRIVE SITE CLP COMBINEDReport · PDF12 Nov 2019View
APPENDIX J.3 - HURST LAND CONTAMINATION DESK STUDYReport · PDF12 Nov 2019View
APPENDIX J.2 - HURST TREE SURVEY AND AIAReport · PDF12 Nov 2019View
APPENDIX J.1 - HURST ECOLOGICAL APPRAISALSReport · PDF12 Nov 2019View
K LPT II - CRAYFORD VERIFIED VIEWS TVA_2019Report · PDF12 Nov 2019View
K.6 CRAYFORD COMBINED OUTLINE CLPReport · PDF12 Nov 2019View
K.5 - DESK BASED ASSESSMENT_CRAYFORD_EAR_FINALReport · PDF12 Nov 2019View
K.4 - FLOOD RISK ASSESSMENTReport · PDF12 Nov 2019View
K.3 - DESK STUDY CRAYFORD PLANNINGReport · PDF12 Nov 2019View
K.2 - ARBORICULTURAL IMPACT ASSESSMENTReport · PDF12 Nov 2019View
K.1 - ECOLOGICAL APPRAISAL_PART3Report · PDF12 Nov 2019View
K.1 - ECOLOGICAL APPRAISAL_PART1Report · PDF12 Nov 2019View
K.1 - ECOLOGICAL APPRAISAL_PART1Report · PDF12 Nov 2019View
DRAWING 6.9 CRAYFORD RECEPTION SITE EXISTING LANDSCAPE AND VISUAL ENVIRONMENT_V2Drawings · PDF12 Nov 2019View
DRAWING 6.8 - CRAYFORD RECEPTION SITE HYDROLOGY AND FLOOD RISK ENVIRONMENT AGENCDrawings · PDF12 Nov 2019View
DRAWING 6.7 CRAYFORD RECEPTION SITE AREAS OF POTENTIAL CONTAMINATION AND MININGDrawings · PDF12 Nov 2019View
DRAWING 6.6 - CRAYFORD RECEPTION SITE HISTORIC ENVIRONMENTDrawings · PDF12 Nov 2019View
DRAWING 6.5 - CRAYFORD RECEPTION SITE TREE IMPACT PROTECTION PLANDrawings · PDF12 Nov 2019View
DRAWING 6.4 - CRAYFORD RECEPTION SITE TREE CONSTRAINTS PLANDrawings · PDF12 Nov 2019View
DRAWING 6.3 CRAYFORD RECEPTION SITE PHASE 1 HABITAT MAPDrawings · PDF12 Nov 2019View
DRAWING 6.2 CRAYFORD RECEPTION SITE ECOLOGICAL DESIGNATIONSDrawings · PDF12 Nov 2019View
DRAWING 6.16 CRAYFORD RECEPTION SITE PROPOSED HGV ROUTINGDrawings · PDF12 Nov 2019View
DRAWING 6.15 CRAYFORD RECEPTION SITE NOISE CONTOUR PLAN OF SHAFT CONSTRUCTION WODrawings · PDF12 Nov 2019View
DRAWING 6.14 CRAYFORD RECEPTION SITE NOISE CONTOUR PLAN OF SHAFT CONSTRUCTION WODrawings · PDF12 Nov 2019View
DRAWING 6.13 CRAYFORD RECEPTION SITE NOISE ASSESSMENT LOCATIONSDrawings · PDF12 Nov 2019View
DRAWING 6.12 CRAYFORD RECEPTION SITE NOISE MONITORING LOCATIONSDrawings · PDF12 Nov 2019View
DRAWING 6.11 CRAYFORD RECEPTION SITE LANDSCAPE STATEGY AND ECOLOGICAL ENHANCEMENDrawings · PDF12 Nov 2019View
DRAWING 6.10 CRAYFORD RECEPTION SITE RETENTION AND LOSS PLANDrawings · PDF12 Nov 2019View
DRAWING 6.1 AQ HEALTH AND SE CRAYFORD DRIVE SITE_V2Drawings · PDF12 Nov 2019View
DRAWING 5.9 BEDROCK AQUIFERSDrawings · PDF12 Nov 2019View
DRAWING 5.8 SOURCE PROTECTION ZONESDrawings · PDF12 Nov 2019View
DRAWING 5.7 HURST DRIVE SITE AREAS OF POTENTIAL CONTAMINATION AND MINING INSTABIDrawings · PDF12 Nov 2019View
DRAWING 5.6 - HURST DRIVE SITE HISTORIC ENVIRONMENTDrawings · PDF12 Nov 2019View
DRAWING 5.5 - HURST DRIVE SITE TREE IMPACT PROTECTION PLANDrawings · PDF12 Nov 2019View
DRAWING 5.4 - HURST DRIVE SITE TREE CONSTRAINTS PLANDrawings · PDF12 Nov 2019View
DRAWING 5.3 HURST DRIVE SITE PHASE 1 HABITAT MAPDrawings · PDF12 Nov 2019View
DRAWING 5.21 HURST DRIVE SITE PROPOSED CONSTRUCTION HAUL ROUTES AND SURVEY SITESDrawings · PDF12 Nov 2019View
DRAWING 5.20 HURST DRIVE SITE NOISE CONTOUR PLAN OF WORST CASE NIGHT TIME TUNNELDrawings · PDF12 Nov 2019View
DRAWING 5.2 HURST DRIVE SITE DESIGNATED ECOLOGICAL SITESDrawings · PDF12 Nov 2019View
DRAWING 5.19 HURST DRIVE SITE NOISE CONTOUR PLAN OF WORST CASE DAY TIME TUNNEL CDrawings · PDF12 Nov 2019View
DRAWING 5.18 NOISE CONTOUR PLAN OF ?WORST-CASE? EARTHWORKS FOR HURST TEMPORARY ADrawings · PDF12 Nov 2019View
DRAWING 5.17 NOISE CONTOUR PLAN OF ?WORST-CASE? EARTHWORKS FOR HURST TEMPORARY ADrawings · PDF12 Nov 2019View
DRAWING 5.16 HURST DRIVE SITE NOISE ASSESSMENT LOCATIONSDrawings · PDF12 Nov 2019View
DRAWING 5.15 HURST DRIVE SITE NOISE MONITORING LOCATIONSDrawings · PDF12 Nov 2019View
DRAWING 5.14 HURST DRIVE SITE LANDSCAPE STATEGY AND ECOLOGICAL ENHANCEMENTDrawings · PDF12 Nov 2019View
DRAWING 5.13 HURST DRIVE SITE RETENTION AND LOSS PLANDrawings · PDF12 Nov 2019View
DRAWING 5.12 HURST DRIVE SITE EXISTING LANDSCAPE AND VISUAL ENVIRONMENT_V2Drawings · PDF12 Nov 2019View
DRAWING 5.11 - HURST DRIVE SITE HYDROLOGY AND FLOOD RISK ENVIRONMENT AGENCY FLOODrawings · PDF12 Nov 2019View
DRAWING 5.10 SUPERFICIAL AQUIFERSDrawings · PDF12 Nov 2019View
DRAWING 5.1 HURST DRIVE SITE AIR QUALITY, HEALTH AND SOCIOECONOMICSDrawings · PDF12 Nov 2019View
DRAWING 2.6 CRAYFORD RECEPTION SITE ARCHITECTUAL PLANSDrawings · PDF12 Nov 2019View
DRAWING 2.5 CRAYFORD RECEPTION SITE OVERVIEWDrawings · PDF12 Nov 2019View
DRAWING 2.4 HURST TEMPORARY HAUL ROAD LAYOUTDrawings · PDF12 Nov 2019View
DRAWING 2.3 HURST DRIVE SITE ARCHITECTUAL PLANSDrawings · PDF12 Nov 2019View
DRAWING 2.2 HURST DRIVE SITE OVERVIEWDrawings · PDF12 Nov 2019View
DRAWING 2.1 LPT II CIRCUIT 3 ALIGNMENTDrawings · PDF12 Nov 2019View
DRAWING 1.1 LPT II OVERVIEWDrawings · PDF12 Nov 2019View
SCREENING OPINIONDecision Notice · PDF5 Jul 2018View
APPX A DRAWINGSDrawings · PDF11 Jun 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

EIA Not Required
SCREENING OPINION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.