Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Ablington Manor Ablington Bibury Cirencester Gloucestershire GL7 5NY
Last published check: 4 Oct 2026, 12:48. Check the council record for more recent changes.
Ablington Manor Ablington Bibury Cirencester Gloucestershire GL7 5NY
This record has no verified map location.
View council mapCompliance with condition 10 (Repairs to Timber Roof) of consent 23/03850/LBC - Internal and external alterations to Ablington Manor including the replacement of existing extensions with an orangery, extension to the existing lower ground floor, and re-rendering the external elevations of the house. Internal and external alterations to Orchard Cottage, including the removal of modern extensions and the creation of a new access and alterations to boundary wall. The demolition and alteration of outbuildings and tennis court and internal and external alterations to the stables and gazebo. The creation of a basement parking area and a studio and swimming pool. Replacement of existing m�nage with workshops and machinery stores as well as the erection of a bat house and sub-station, installation of ground source heat pumps, new gates at the northern entrance and associated landscaping.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| DECISION NOTICEDecision Notice · PDF | 29 Apr 2026 | View |
| NEW DETAILS: FIRST FLOOR REFLECTIVE CEILING PLANDrawing · PDF | 21 Apr 2026 | View |
| NEW DETAILS: SECOND FLOOR REFLECTIVE CEILING PLANDrawing · PDF | 20 Apr 2026 | View |
| NEW DETAILS: GROUND FLOOR REFLECTIVE CEILING PLANDrawing · PDF | 20 Apr 2026 | View |
| Applicant/Agent CorrespondenceApplicant/Agent Correspondence | 27 Mar 2026 | View |
| NEW DETAILS: STRUCTURAL ENGINEER?S RECOMMENDATIONS FOR FURTHER INVESTIGATION OFReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: GROUND FLOOR REFLECTED CEILING PLANSuperseded Document · PDF | 9 Mar 2026 | View |
| NEW DETAILS: FLOOR JOISTS TO THE SIDE OF BEAM END REPAIRSReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: BEAM END REPAIR - SUPPORTED FROM SAME FLOOR LEVELReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: BEAM END REPAIR - SUPPORTED FROM BELOWReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: CEILING REMOVAL PRESENTATIONDrawing · PDF | 9 Mar 2026 | View |
| NEW DETAILS: ABLINGTON RECOMMENDATIONS FOR FURTHER INVESTIGATIONSReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: FLOOR JOISTS TO THE SIDE OF BEAM END REPAIRSReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS: BEAM END REPAIR - SUPPORTED FROM SAME FLOOR LEVEL REV 1Report · PDF | 9 Mar 2026 | View |
| NEW DETAILS: BEAM END REPAIR - SUPPORTED FROM BELOWReport · PDF | 9 Mar 2026 | View |
| NEW DETAILS - EXISTING RCP GROUND FLOOR PLANDrawing · PDF | 25 Sept 2025 | View |
| NEW DETAILS - EXISTING RCP FIRST FLOOR PLANDrawing · PDF | 25 Sept 2025 | View |
| NEW DETAILS - EXISTING RCP SECOND FLOOR PLANDrawing · PDF | 25 Sept 2025 | View |
| NEW DETAILS -ENABLING GROUND FLOOR REFLECTED CEILING PLANSuperseded Document · PDF | 25 Sept 2025 | View |
| NEW DETAILS -ENABLING FIRST FLOOR REFLECTED CEILING PLANSuperseded Document · PDF | 25 Sept 2025 | View |
| NEW DETAILS -ENABLING SECOND FLOOR REFLECTED CEILING PLANSuperseded Document · PDF | 25 Sept 2025 | View |
| NEW DETAILS -R20A ? DISCHARGE OF CONDITION NO.10 TIMBER STRUCTURE REPAIRSReport · PDF | 25 Sept 2025 | View |
| SCREENING OPINIONScreening Opinion · PDF | 28 Aug 2025 | View |
| Application FormApplication Form · PDF | 22 Aug 2025 | View |
| COVERING LETTERApplicant/Agent Correspondence · PDF | 22 Aug 2025 | View |
| DISCHARGE OF CONDITION NO.10 TIMBER STRUCTURE REPAIRSSuperseded Document · PDF | 22 Aug 2025 | View |
| PRINCIPAL ROOF TRUSSES, PURLINS AND FLOOR BEAMS CONDITION INVESTIGATIONReport · PDF | 22 Aug 2025 | View |
| TYPICAL TIMBER TRUSS REPAIR DETAILDrawing · PDF | 22 Aug 2025 | View |
| TYPICAL TIMBER TRUSS REPAIR DETAILDrawing · PDF | 22 Aug 2025 | View |
| TYPICAL PRINCIPAL TIMBER BEAM END REPAIR DETAILDrawing · PDF | 22 Aug 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.