Status on council recordCouncil status: Decided

-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination-Install new HV underground cable from 43LC4 to new H-Pole at 43LC5.-Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan-Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination-Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

Shelton Farm Delabole Cornwall PL33 9DA

Cornwall CouncilReference PA26/04833Overhead Electricity Lines

Last published check: 1 Nov 2026, 11:44. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 1 Nov 2026, 11:44 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated10 Jul 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date21 Aug 2026
  5. DecidedNo objections (OHL/OHE/HG apps)18 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
  3. Decision Made Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Overhead Electricity Lines
Ward
St Teath And Tintagel
Parish
Tintagel
Documents
6 published

Proposal

-Erect new terminal pole at 43LC4 add a back stay to support OHL and install new underground cable pole termination-Install new HV underground cable from 43LC4 to new H-Pole at 43LC5.-Install new H-pole at 43LC5 new position as per plan and installed new HV and LV earth wires as required. Reconnect existing low voltage network via new underground cables as shown on attached plan-Install new HV cable from new poles at 43LC5 to 43LC9 with associated earth wires as necessary. -Install new terminal pole at 43LC9 and backstay to support OHL and install new underground cable pole termination-Dismantle all redundant equipment between 43LC4 and 43LC9 as shown highlighted blue on plan. Existing underground cable to be disconnected from network, made safe and abandoned in situ

Reference
PA26/04833
Ward
St Teath And Tintagel
Parish
Tintagel

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DEPT FOR ENERGY - SCREENING DECISION LETTER 17/09/2026Correspondence17 Sept 2026View
  • DEPT FOR ENERGY - CONSENT LETTER 17/09/2026Correspondence17 Sept 2026View
  • NOOHLZ - OHL NO OBJ (LETTER AND 2 FORMS)Correspondence Out18 Aug 2026View
  • LOCATION PLANPlan - Site Location10 Jul 2026View
  • STREETVIEW PLANPlan - Site Location10 Jul 2026View
  • FORM BApplication Form10 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No objections (OHL/OHE/HG apps)
DEPT FOR ENERGY - SCREENING DECISION LETTER 17/09/2026
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.