ApprovedCouncil status: Decided

Replace the 5no. timber windows to the first floor window bay to the front elevation with uPVC units; Replace the 3No. timber windows to the first floor to the rear elevation with uPVC units; Timber boards below the windows to be replaced with 18mm thick marine plywood with white gloss enamel finish; Cap over the timber soffits and fascia boards with white uPVC trims and Replace the existing cast iron rainwater downpipes to the right hand side elevation with uPVC.

16 Fore Street Newquay Cornwall TR7 1LN

Cornwall CouncilReference PA26/02563Full application

Last published check: 10 Oct 2026, 21:28. Check the council record for more recent changes.

Status and dates

Last published check: 10 Oct 2026, 21:28 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated16 Apr 2026
  3. ClosedConsultationEnded 19 May 2026
  4. Date set by councilTarget decision date11 Jun 2026
  5. DecidedApproved with conditions9 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. Application Validated

    Published milestoneCouncil source
  2. Last Site Notice Posted Date

    Published milestoneCouncil source
  3. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
Application type
Full application
Ward
Newquay Central And Pentire
Parish
Newquay
Documents
12 published

Proposal

Replace the 5no. timber windows to the first floor window bay to the front elevation with uPVC units; Replace the 3No. timber windows to the first floor to the rear elevation with uPVC units; Timber boards below the windows to be replaced with 18mm thick marine plywood with white gloss enamel finish; Cap over the timber soffits and fascia boards with white uPVC trims and Replace the existing cast iron rainwater downpipes to the right hand side elevation with uPVC.

Reference
PA26/02563
Alternative references
PP-14706340
Ward
Newquay Central And Pentire
Parish
Newquay
Agent
TFT Consultants

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ACFULZ - CONDITIONAL APPROVALDecision Notice9 Sept 2026View
  • DREPORT DELEGATED OFFICER REPORTOfficer Report9 Sept 2026View
  • HERITAGE FLUSH SASHSupporting Information31 Jul 2026View
  • PROPOSED FRONT ELEVATIONPlan - Proposed Elevations15 Jul 2026View
  • APPLICATION FORMApplication Form16 Apr 2026View
  • EXISTING FRONT ELEVATIONPlan - Existing Elevations16 Apr 2026View
  • EXISTING SIDE ELEVATIONPlan - Existing Elevations16 Apr 2026View
  • EXISTING REAR ELEVATIONPlan - Existing Elevations16 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved with conditions
ACFULZ - CONDITIONAL APPROVAL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.