Status on council recordCouncil status: Decided

NGED are required to upgrade the existing low voltage overhead line at Herodsfoot, Cornwall as per the attached plan 5905474S37. As part of the low voltage upgrade works NGED are required to stand one new low voltage electricity pole as shown on the plan highlighted 'new pole'. The new pole is required to provide 4 new supplies and will be situated on private land agreed with the landowner. The overhead line shall be replaced with 4c 95mm aerial bundled conductor. The existing poles 451562-5, 451562-6, 451562-7, 451562-8, 451562-9 and 451562-11 shall all be replaced on a like for like basis as part of the upgrade works to ensure that the network is reliable and resilient. The tallest pole shall be 10.5 metres

Millcombe Farm Herodsfoot Liskeard Cornwall PL14 4QX

Cornwall CouncilReference PA26/00490Overhead Electricity Lines

Last published check: 5 Nov 2026, 00:02. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 5 Nov 2026, 00:02 (UK)

  1. Not publishedReceivedNo date on council record
  2. DoneValidated26 Jan 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date9 Mar 2026
  5. DecidedNo objections (OHL/OHE/HG apps)5 Mar 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
  3. Decision Made Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Overhead Electricity Lines
Ward
Liskeard South And Dobwalls
Parish
Duloe
Documents
4 published

Proposal

NGED are required to upgrade the existing low voltage overhead line at Herodsfoot, Cornwall as per the attached plan 5905474S37. As part of the low voltage upgrade works NGED are required to stand one new low voltage electricity pole as shown on the plan highlighted 'new pole'. The new pole is required to provide 4 new supplies and will be situated on private land agreed with the landowner. The overhead line shall be replaced with 4c 95mm aerial bundled conductor. The existing poles 451562-5, 451562-6, 451562-7, 451562-8, 451562-9 and 451562-11 shall all be replaced on a like for like basis as part of the upgrade works to ensure that the network is reliable and resilient. The tallest pole shall be 10.5 metres

Reference
PA26/00490
Ward
Liskeard South And Dobwalls
Parish
Duloe

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • NOOHLZ - OHL NO OBJ (LETTER AND 2 FORMS)Correspondence Out5 Mar 2026View
  • PROPOSED WORKS PLANPlan - Other26 Jan 2026View
  • FORM BApplication Form26 Jan 2026View
  • STRRETVIEW PLANPlan - Site Location26 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No objections (OHL/OHE/HG apps)
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.