Council planning record

Residential Development Of 51 Houses With Associated Infrastructure Including Roads, Footpaths, Landscaping, Drainage And Associated Works (Phase 1b)

Land At Branshill Branshill Road Sauchie Clackmannanshire

DecidedReference: 24/00031/MSCClackmannanshire

Last published check: 21 Sept 2026, 15:32. Check the council record for more recent changes.

Application location

Land At Branshill Branshill Road Sauchie Clackmannanshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Matters Specified in Condition
Received
5 Feb 2024
Validated
14 Mar 2024
Determination deadline
14 May 2024
Local authority
Clackmannanshire

Application overview

Residential Development Of 51 Houses With Associated Infrastructure Including Roads, Footpaths, Landscaping, Drainage And Associated Works (Phase 1b)

Proposal details

Reference
24/00031/MSC
Ward
Clackmannanshire Central
Agent
Gavin Lloyd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 146 of 146

DocumentPublishedAction
APPROVED - CONDITION 7Discharge of Condition · PDF22 Apr 2026View
REMEDIATION STRATEGY - PHASE 2AReport · PDF24 Feb 2026View
DISCHARGE OF CONDITION 6 - REMEDIATION OF CONTAMINATED SOILSDischarge of Condition · PDF17 Dec 2025View
DISCHARGE OF CONDITION 6 - REMEDIATION STRATEGYDischarge of Condition · PDF17 Dec 2025View
DISCHARGE OF CONDITION 7- SAUCHIE 1B - CONSTRUCTION PHASING AND MANAGEMENT PLANDischarge of Condition · PDF17 Dec 2025View
APPROVED - CONDITION 2 - INITIAL TRAVEL PLANDischarge of Condition · PDF18 Nov 2025View
APPROVED - CONDITION 2 - MITIGATION PHASING STRATEGY REV CDischarge of Condition · PDF18 Nov 2025View
APPROVED - CONDITION 2Discharge of Condition · PDF18 Nov 2025View
APPROVED - CONDITION 3 - DRAINAGE LAYOUTDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - DRAINAGE PROFILESDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - GROUNDWATER AND OVERLAND FLOWDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - MANHOLE SCHEDULEDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - OVERLAND FLOWDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - PLOT LEVELSDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - SF1 TECHNICAL AUDITDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - STORM NETWORKDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - SUDS POND CONSTRUCTION DETAILSDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - SUDS POND LAYOUTDischarge of Condition · PDF7 Nov 2025View
APPROVED - CONDITION 3 - SUDS RISK ASSESSMENTDischarge of Condition · PDF7 Nov 2025View
ACTIVE TRAVEL ROUTEDischarge of Condition · PDF11 Jun 2025View
ADOPTIONS PLANDischarge of Condition · PDF11 Jun 2025View
CONDITION 3 TRACKER - DRAWING NUMBERS AND RESPONSEDischarge of Condition · PDF11 Jun 2025View
APPROVED 2023 ALFORD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 ALFORD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 ALFORD HOUSE TYPE ELEVATIONS STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 ALFORD HOUSE TYPE ELEVATIONS STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 ASTERWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 ASTERWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 ASTERWOODDA BLACKWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 ASTERWOODDA BLACKWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 BELLWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 BELLWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 BELLWOODDA HAZELWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 BELLWOODDA HAZELWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 BURLWOODDA MAPLEWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOOD HOUSE TYPE ELEVATION STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOOD HOUSE TYPE ELEVATION STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOODDA GREENWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOODDA GREENWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOODDA GREENWOOD HOUSE TYPE ELEVATION STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 CHERRYWOODDA GREENWOOD HOUSE TYPE ELEVATION STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOOD HOUSE TYPE ELEVATION STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOOD HOUSE TYPE ELEVATION STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOODDA FERNWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOODDA FERNWOOD HOUSE TYPE ELEVATION ASDrawing · PDF31 Oct 2024View
APPROVED 2023 EASTWOODDA FERNWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 HAZELFORD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 HAZELFORD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 HAZELFORDDA HARFORD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 HAZELFORDDA HARFORD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 LYNWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 LYNWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 LYNWOODDA ELMWOOD HOUSE TYPE STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 LYNWOODDA ELMWOOD HOUSE TYPE STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOOD HOUSE TYPE ELEVATION STONE ASDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOOD HOUSE TYPE ELEVATION STONE OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOODDA CEDARWOOD HOUSE TYPE FLOOR PLANS ASDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOODDA CEDARWOOD HOUSE TYPE FLOOR PLANS OPPDrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOODDA CEDARWOOD HOUSE TYPE ELEVATION STONE ADrawing · PDF31 Oct 2024View
APPROVED 2023 SANDALWOODDA CEDARWOOD HOUSE TYPE ELEVATION STONE ODrawing · PDF31 Oct 2024View
APPROVED ARCHAEOLOGICAL EVALUATION WRITTEN SCHEME OF EVALUATION 210423Report · PDF31 Oct 2024View
APPROVED TREE SURVEY REPORT JANUARY 2024Report · PDF31 Oct 2024View
APPROVED ROUTE OF BUILD SITE LAYOUT PHASE 1A AND 1BDrawing · PDF31 Oct 2024View
APPROVED CONSOLIDATION LAYOUT OVERVIEWDrawing · PDF31 Oct 2024View
APPROVED LOCATION PLANDrawing · PDF31 Oct 2024View
APPROVED ILLUSTRATIVE MASTERPLANRevised Drawing · PDF31 Oct 2024View
APPROVED ILLUSTRATIVE MASTERPLAN 2Drawing · PDF31 Oct 2024View
APPROVED SECTION A-A AND B-BDrawing · PDF31 Oct 2024View
APPROVED SECTION C-C AND D-DDrawing · PDF31 Oct 2024View
APPROVED URBAN CORRIDOR - PRIMARYDrawing · PDF31 Oct 2024View
APPROVED URBAN CORRIDOR - SECONDARYDrawing · PDF31 Oct 2024View
APPROVED URBAN CORRIDOR - TERTIARYDrawing · PDF31 Oct 2024View
APPROVED URBAN CORRIDOR - FOOTPATHS THROUGH OPEN SPACEDrawing · PDF31 Oct 2024View
APPROVED URBAN CORRIDOR - FOOTPATH TO EXISTING WOODLANDDrawing · PDF31 Oct 2024View
APPROVED LANDSCAPE STRATEGY - REV BDrawing · PDF31 Oct 2024View
APPROVED LANDSCAPE PROPOSALS - SHEET 1 OF 3Drawing · PDF31 Oct 2024View
APPROVED LANDSCAPE PROPOSALS - SHEET 2 OF 3Drawing · PDF31 Oct 2024View
APPROVED LANDSCAPE PROPOSALS - SHEET 3 OF 3Drawing · PDF31 Oct 2024View
APPROVED COMPOSITE SITE PLANDrawing · PDF31 Oct 2024View
APPROVED INDICATIVE MINERAL INSTABILITY ZONESDrawing · PDF31 Oct 2024View
APPROVED COMPOSITE SITE PLAN - CONSOLIDATION OF MINE WORKINGSDrawing · PDF31 Oct 2024View
APPROVED REVISED FINISHES AND BOUNDARIESRevised Drawing · PDF31 Oct 2024View
APPROVED REVISED REMEDIATION STRATEGY JULY 2024Report · PDF31 Oct 2024View
REPORT TO PLANNING COMMITTEECommittee Report · PDF31 Oct 2024View
APPROVED SITE LAYOUTRevised Drawing · PDF31 Oct 2024View
DECISION NOTICEDecision · PDF31 Oct 2024View
REVISED PHASE 1B SITE LAYOUTRevised Drawing · PDF28 Jun 2024View
CONSOLIDATION LAYOUT OVERVIEWDrawing · PDF21 Jun 2024View
COMPOSITE SITE PLANDrawing · PDF23 Apr 2024View
INDICATIVE MINERAL INSTABILITY ZONEDrawing · PDF23 Apr 2024View
COMPOSITE SITE PLANDrawing · PDF23 Apr 2024View
TRANSPORTATION ASSESSMENT - PART 1Report · PDF23 Apr 2024View
TRANSPORTATION ASSESSMENT - PART 2Report · PDF23 Apr 2024View
ACTIVE TRAVEL CONNECTIONS AND INTERNAL FOORWAYSDrawing · PDF23 Apr 2024View
DESIGN AND ACCESS STATEMENT - PART 1Report · PDF23 Apr 2024View
DESIGN AND ACCESS STATEMENT - PART 2Report · PDF23 Apr 2024View
DESIGN AND ACCESS STATEMENT - PART 3Report · PDF23 Apr 2024View
DESIGN AND ACCESS STATEMENT - PART 4Report · PDF23 Apr 2024View
SITE LAYOUTDrawing · PDF23 Apr 2024View
2023 BURLWOOD HOUSE TYPE STONE ASDrawing · PDF5 Feb 2024View
2023 BURLWOOD HOUSE TYPE STONE OPPDrawing · PDF5 Feb 2024View
2023 BURLWOODDA MAPLEWOOD HOUSE TYPE STONE ASDrawing · PDF5 Feb 2024View
2023 EASTWOODDA FERNWOOD HOUSE TYPE ELEVATION OPPDrawing · PDF5 Feb 2024View
FLOOD RISK ASSESSMENTReport · PDF5 Feb 2024View
INDICATIVE DRAINAGEDrawing · PDF5 Feb 2024View
INDICATIVE SITE WIDE CROSS SECTIONSDrawing · PDF5 Feb 2024View
TRANSPORTATION ASSESSMENT SAUCHIE WEST PART 1 JULY 2023Report · PDF5 Feb 2024View
TRANSPORTATION ASSESSMENT SAUCHIE WEST PART 2 JULY 2023Report · PDF5 Feb 2024View
INITIAL TRAVEL PLAN SAUCHIE WEST AND PACK JULY 2023Report · PDF5 Feb 2024View
PLOT LEVELSDrawing · PDF5 Feb 2024View
VISIBILITY SPLAYSDrawing · PDF5 Feb 2024View
DRAINAGE LAYOUTDrawing · PDF5 Feb 2024View
EARTHWORKS CUT AND FILLDrawing · PDF5 Feb 2024View
SPA REFUSE VEHICLEDrawing · PDF5 Feb 2024View
SWEPT PATH ANAYLSIS FIRE TENDERDrawing · PDF5 Feb 2024View
LOCATION PLANDrawing · PDF5 Feb 2024View
SCHOOL SITE SUPPORTING STATEMENTReport · PDF5 Feb 2024View
DESIGN AND ACCESS STATEMENT - PHASE 1B_PART1Report · PDF5 Feb 2024View
DESIGN AND ACCESS STATEMENT - PHASE 1B_PART2Report · PDF5 Feb 2024View
DESIGN AND ACCESS STATEMENT - PHASE 1B_PART3Report · PDF5 Feb 2024View
DESIGN AND ACCESS STATEMENT - PHASE 1B_PART4Report · PDF5 Feb 2024View
PHASING PLANDrawing · PDF5 Feb 2024View
ILLUSTRATIVE MASTERPLAN 2Drawing · PDF5 Feb 2024View
PHASE 1B SITE LAYOUTDrawing · PDF5 Feb 2024View
LANDSCAPE AND VISUAL IMPACT ASSESSMENT 22-06-2023Report · PDF5 Feb 2024View
ARTWORK SAUCHIE 1Drawing · PDF5 Feb 2024View
ARTWORK SAUCHIE 2Drawing · PDF5 Feb 2024View
ARTWORK SAUCHIE 3Drawing · PDF5 Feb 2024View
AS 0999 AIR QUALITY IMPACT ASSESSMENT REV 03Report · PDF5 Feb 2024View
MINING STABILISATION APPRAISALReport · PDF5 Feb 2024View
EXTERNAL MATERIALS SCHEDULEDrawing · PDF5 Feb 2024View
GROUNDWATER CONCLUSIONReport · PDF5 Feb 2024View
SPEN DIVERSIONSDrawing · PDF5 Feb 2024View
APPLICATION FORMApplication Form · PDF5 Feb 2024View
PRELIMINARY ECOLOGICAL APPRAISAL SAUCHIE APRIL 2023Report · PDF5 Feb 2024View
ACOUSTIC STATEMENTReport · PDF5 Feb 2024View
PRE-CONSTRUCTION INFORMATION DECEMBER 2023Report · PDF5 Feb 2024View
PHASE 1B ENERGY STATEMENT DECEMBER 2023Report · PDF5 Feb 2024View
SWMPDrawing · PDF5 Feb 2024View
ARBORICULTURAL CONSTRAINTS REPORTReport · PDF5 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Actual Committee Date

    Published milestoneCouncil source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

APPROVED
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.