Variation of conditions 1, 7, 9, 12 and 15 of permitted application 23/01506/REM for the removal of access ramp from the north-west embankment; redesign and visual improvement of the north-west embankment following removal of access ramp; reconfiguration of the Network Rail Laydown area; connection to vehicular and pedestrian access from Landings Lane under Water End and Severus Road and foot bridges; provision for unhindered pedestrian access, for authorised personnel, from Millennium Green under the ECML Bridge; a 3m strip of land abutting the base of the north-west embankment for maintenance of the embankment, Severus Footbridge, Severus Road Bridge and the ECML Bridge; and provision for additional trees on the top of the embankment
Variation of conditions 1, 7, 9, 12 and 15 of permitted application 23/01506/REM for the removal of access ramp from the north-west embankment; redesign and visual improvement of the north-west embankment following removal of access ramp; reconfiguration of the Network Rail Laydown area; connection to vehicular and pedestrian access from Landings Lane under Water End and Severus Road and foot bridges; provision for unhindered pedestrian access, for authorised personnel, from Millennium Green under the ECML Bridge; a 3m strip of land abutting the base of the north-west embankment for maintenance of the embankment, Severus Footbridge, Severus Road Bridge and the ECML Bridge; and provision for additional trees on the top of the embankment
Reference
26/00308/REM
Alternative references
PP-14670381
Ward
Holgate
Parish
Holgate Planning Panel
Agent
Avison Young
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.