T1 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT2 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT3 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT4 - LimeReduction of no more than 2mThis tree has been missed as part of the pollarding cycle.The lime tree sits alongside three other limes T1,2 &3 (and a pear) that are managed as an establishedpollard line or group. Leaving one unmanaged tree disrupts the uniform appearance, balance, and visualsymmetry of the feature.To establish visual continuity and structural uniformity within an existing group of historically managed trees.Bringing this final lime into harmony with the adjacent three pollarded limes will enhance the overall amenityand cohesive appearance of the garden boundary/feature.Initiating a managed pollard regime at this stage in the tree's development ensures future containment,preventing the tree from outgrowing its spatial constraints and reducing the likelihood of heavy, unmanagedinterventions later in its maturity. This work can then take place gradually over the next 2-3 yearsT5 - PearReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basis
Washington Cottage Finchfield Gardens Wolverhampton West Midlands WV3 9LT
T1 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT2 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT3 - LimeReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basisT4 - LimeReduction of no more than 2mThis tree has been missed as part of the pollarding cycle.The lime tree sits alongside three other limes T1,2 &3 (and a pear) that are managed as an establishedpollard line or group. Leaving one unmanaged tree disrupts the uniform appearance, balance, and visualsymmetry of the feature.To establish visual continuity and structural uniformity within an existing group of historically managed trees.Bringing this final lime into harmony with the adjacent three pollarded limes will enhance the overall amenityand cohesive appearance of the garden boundary/feature.Initiating a managed pollard regime at this stage in the tree's development ensures future containment,preventing the tree from outgrowing its spatial constraints and reducing the likelihood of heavy, unmanagedinterventions later in its maturity. This work can then take place gradually over the next 2-3 yearsT5 - PearReduce back to previous pruning points/knuckles.This tree has been managed historically on a cyclical basis
Reference
26/01141/TR
Alternative references
PP-15320127
Ward
Park
Agent
Wolverhampton Tree Service Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.