Front Garden: T1: Mature Birch: Approximately 12.00m: Raise crown over the road, pavement and garden by approximately 1.20m-1.50m. Reduce overlong branches which protrude from the trees main crown structure back to their previous points of reduction, ensuring ample furnishing growth is retained, which should be shortened where necessary to shape and preserve a natural crown profile. Thin crown density evenly throughout by approximately 15-20%. Remove dead wood.T2: Mature Cherry: Approximately 5.00m: Reduce lateral and sub lateral spread towards and over the boundary by approximately 1.30m to help control encroachment and shape crown. Thin density 10-15%. Remove major dead wood.
51 Clifton Hill London NW8 0QE
City of WestminsterReference 26/07616/TPOApplic. for wks to trees subject to TPO
Last published check: 14 Nov 2026, 09:02. Check the council record for more recent changes.
Front Garden: T1: Mature Birch: Approximately 12.00m: Raise crown over the road, pavement and garden by approximately 1.20m-1.50m. Reduce overlong branches which protrude from the trees main crown structure back to their previous points of reduction, ensuring ample furnishing growth is retained, which should be shortened where necessary to shape and preserve a natural crown profile. Thin crown density evenly throughout by approximately 15-20%. Remove dead wood.T2: Mature Cherry: Approximately 5.00m: Reduce lateral and sub lateral spread towards and over the boundary by approximately 1.30m to help control encroachment and shape crown. Thin density 10-15%. Remove major dead wood.
Reference
26/07616/TPO
Alternative references
PP-15357714
Ward
Abbey Road
Agent
Harrison's Tree Service Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.