Variation of conditions 1,3 and 8 of planning permission dated 19th July 2017(RN 17/04068/FULL) for the erection of two storey side extension at lower ground and ground floor levels, erection of rear extension at lower ground floor level with roof terrace, platform and steps and installation of bin store in front garden. NAMELY, Reinstatement of front boundary treatment comprising the erection of brick boundary walls, gates and associated soft landscaping to the front curtilage. Condition 3, York stone is used to the side entrance steps; Surrounding hardstanding is formed in Indian limestone, with reclaimed London stocks to boundary walls. Condition 8 report idenfying hard and soft landscaping, greening and flood risk.
98 Clifton Hill London NW8 0JT
City of WestminsterReference 26/06841/FULLFull Planning Permission Application
Variation of conditions 1,3 and 8 of planning permission dated 19th July 2017(RN 17/04068/FULL) for the erection of two storey side extension at lower ground and ground floor levels, erection of rear extension at lower ground floor level with roof terrace, platform and steps and installation of bin store in front garden. NAMELY, Reinstatement of front boundary treatment comprising the erection of brick boundary walls, gates and associated soft landscaping to the front curtilage. Condition 3, York stone is used to the side entrance steps; Surrounding hardstanding is formed in Indian limestone, with reclaimed London stocks to boundary walls. Condition 8 report idenfying hard and soft landscaping, greening and flood risk.
Reference
26/06841/FULL
Alternative references
PP-15269188
Ward
Abbey Road
Agent
HOMZ UK
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.