T1. London plane: Reduce the lateral crown by up to 4m on the N (for the longest branches) and about 2m on the NE, with about 2m reduction elsewhere to balance the crown so far as feasible while reducing the new impact of wind on the tree, tapering into the upper crown. No overall height reduction to be carried out. T2. London plane: Fell and grind out the roots to about 300mm below existing ground level. T3. London plane: Selectively reduce and lift branches oversailing the highway, especially ESE, to their last reduction points over the road to provide about 4m vertical clearance underneath. T35. Malus: Fell and grind out the roots to about 300mm below existing ground level.
Open Space Manchester Square London W1U 3HQ
City of WestminsterReference 26/06607/TPOApplic. for wks to trees subject to TPO
Last published check: 23 Nov 2026, 16:21. Check the council record for more recent changes.
T1. London plane: Reduce the lateral crown by up to 4m on the N (for the longest branches) and about 2m on the NE, with about 2m reduction elsewhere to balance the crown so far as feasible while reducing the new impact of wind on the tree, tapering into the upper crown. No overall height reduction to be carried out. T2. London plane: Fell and grind out the roots to about 300mm below existing ground level. T3. London plane: Selectively reduce and lift branches oversailing the highway, especially ESE, to their last reduction points over the road to provide about 4m vertical clearance underneath. T35. Malus: Fell and grind out the roots to about 300mm below existing ground level.
Reference
26/06607/TPO
Alternative references
PP-15253354
Ward
Marylebone
Agent
The Tree Bureau
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.