Refurbishment and repair of Room 9 including replacement of the existing fabric wall covering; removal and replacement of the existing timber flooring; cleaning, repair and conservation of existing Verde di Prato marble skirtings and door surrounds; repair and redecoration of the decorative plaster ceiling and cornice, including revisions to the existing gilding scheme; refurbishment of the existing rooflight and associated roof repairs; temporary removal and reinstatement of external louvre assemblies; and associated mechanical and electrical upgrades including concealed cornice uplighting, replacement lighting equipment and replacement/additional power outlets.
The National Gallery Trafalgar Square London WC2N 5DN
City of WestminsterReference 26/06597/LBCListed Building Consent Application
Last published check: 23 Nov 2026, 16:32. Check the council record for more recent changes.
Refurbishment and repair of Room 9 including replacement of the existing fabric wall covering; removal and replacement of the existing timber flooring; cleaning, repair and conservation of existing Verde di Prato marble skirtings and door surrounds; repair and redecoration of the decorative plaster ceiling and cornice, including revisions to the existing gilding scheme; refurbishment of the existing rooflight and associated roof repairs; temporary removal and reinstatement of external louvre assemblies; and associated mechanical and electrical upgrades including concealed cornice uplighting, replacement lighting equipment and replacement/additional power outlets.
Reference
26/06597/LBC
Alternative references
PP-15246824
Ward
St James's
Agent
Feilden+Mawson Group Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.