Council planning record

Alterations and extensions to 24 Hanover Square including the change of use from office to hotel, a new mansard roof, five storey redevelopment of the 1980s extension to the rear of 24 Hanover Square, a connection at ground and lower ground floor level to the adjacent hotel at 22 Hanover Square, and all works including demolition, enabling, highways and other ancillary works. (Linked with 26/06368/LBC)

24 Hanover Square London

PendingReference: 26/06367/FULLCity of Westminster

Last published check: 27 Sept 2026, 12:55. Check the council record for more recent changes.

Application location

24 Hanover Square London

This record has no verified map location.

View council map

Application summary

Status
Pending
Application type
Full Planning Permission Application
Received
17 Sept 2026
Validated
17 Sept 2026
Determination deadline
Not published
Local authority
City of Westminster

Application overview

Alterations and extensions to 24 Hanover Square including the change of use from office to hotel, a new mansard roof, five storey redevelopment of the 1980s extension to the rear of 24 Hanover Square, a connection at ground and lower ground floor level to the adjacent hotel at 22 Hanover Square, and all works including demolition, enabling, highways and other ancillary works. (Linked with 26/06368/LBC)

Proposal details

Reference
26/06367/FULL
Alternative references
PP-15137614
Ward
West End
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 116 of 116

DocumentPublishedAction
RECEIPT OF APPLICATIONOther · PDF24 Sept 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 4Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 1Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 2Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 3Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 5Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 9Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 6Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 7Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 10Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 8Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 11Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 14Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 12Design and Access Statement · PDF17 Sept 2026View
DESIGN AND ACCESS STATEMENT: PART 13Design and Access Statement · PDF17 Sept 2026View
TRAVEL PLANTravel Plan · PDF17 Sept 2026View
TRANSPORT STATEMENTTransport Statement · PDF17 Sept 2026View
SUSTAINABLE DESIGN STATEMENT AND BREEAM PRE-ASSESSMENTBackground Papers · PDF17 Sept 2026View
STRUCTURAL METHODOLOGY STATEMENTStructural survey · PDF17 Sept 2026View
RIBA STAGE 2 REPORT REV D TRIPS, SERVICING AND WASTEReport · PDF17 Sept 2026View
STATEMENT OF COMMUNITY INVOLVEMENTStatement of Community Involvement · PDF17 Sept 2026View
PLANNING STATEMENTPlanning Statement · PDF17 Sept 2026View
PRELIMINARY ECOLOGICAL APPRAISAL AND BREEAM REPORTReport · PDF17 Sept 2026View
NOISE IMPACT ASSESSMENTNoise impact assessment · PDF17 Sept 2026View
MARKETING REPORTReport · PDF17 Sept 2026View
LIGHTING STRATEGY DESIGN & ACCESS STATEMENTDesign and Access Statement · PDF17 Sept 2026View
HERITAGE AND TOWNSCAPE IMPACT ASSESSMENT: PART 1Heritage Statement · PDF17 Sept 2026View
HERITAGE AND TOWNSCAPE IMPACT ASSESSMENT: PART 2Heritage Statement · PDF17 Sept 2026View
FLOOD RISK ASSESSMENTFlood risk assessment · PDF17 Sept 2026View
FIRE STATEMENTBackground Papers · PDF17 Sept 2026View
ENERGY STATEMENTEnergy Assessment · PDF17 Sept 2026View
COVER LETTERBackground Papers · PDF17 Sept 2026View
OUTLINE CONSTRUCTION LOGISTICS PLANConstruction Management Plan · PDF17 Sept 2026View
CIRCULAR ECONOMY STATEMENTEconomic statement · PDF17 Sept 2026View
STRUCTURAL METHODOLOGY STATEMENTStructural survey · PDF17 Sept 2026View
SUSTAINABLE DRAINAGE STRATEGYBackground Papers · PDF17 Sept 2026View
RIGHTS OF LIGHT IMPACT: APPENDICES 112-150Daylight and Sunlight assessment · PDF17 Sept 2026View
RIGHTS OF LIGHT IMPACT: APPENDICES 76-111Daylight and Sunlight assessment · PDF17 Sept 2026View
RIGHTS OF LIGHT IMPACT ON NEIGHBOURING PROPERTIES REPORTDaylight and Sunlight assessment · PDF17 Sept 2026View
RIGHTS OF LIGHT IMPACT: APPENDICES 1-75Daylight and Sunlight assessment · PDF17 Sept 2026View
DRAWING ISSUE SCHEDULE SHEETBackground Papers · PDF17 Sept 2026View
EXISTING SOUTH ELEVATIONDrawing · PDF17 Sept 2026View
EXISTING NORTH ELEVATIONDrawing · PDF17 Sept 2026View
EXISTING WEST ELEVATIONDrawing · PDF17 Sept 2026View
EXISTING EAST ELEVATIONDrawing · PDF17 Sept 2026View
PROPOSED SOUTH ELEVATIONDrawing · PDF17 Sept 2026View
PROPOSED NORTH ELEVATIONDrawing · PDF17 Sept 2026View
EXISTING INTERNAL ELEVATIONS - LEVEL GROUND FLOORDrawing · PDF17 Sept 2026View
EXISTING INTERNAL ELEVATIONS - LEVEL 01Drawing · PDF17 Sept 2026View
FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL GROUNDDrawing · PDF17 Sept 2026View
PROPOSED WEST ELEVATIONDrawing · PDF17 Sept 2026View
PROPOSED EAST ELEVATIONDrawing · PDF17 Sept 2026View
FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 01Drawing · PDF17 Sept 2026View
EXISTING INTERNAL ELEVATIONS - LEVEL 02Drawing · PDF17 Sept 2026View
EXISTING INTERNAL ELEVATIONS - LEVEL 03Drawing · PDF17 Sept 2026View
FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 02Drawing · PDF17 Sept 2026View
PROPOSED INTERNAL ELEVATIONS - LEVEL GROUND FLOORDrawing · PDF17 Sept 2026View
FABRIC ALTERATION INTERNAL ELEVATIONS - LEVEL 03Drawing · PDF17 Sept 2026View
PROPOSED INTERNAL ELEVATIONS - LEVEL 01Drawing · PDF17 Sept 2026View
PROPOSED INTERNAL ELEVATIONS - LEVEL 02Drawing · PDF17 Sept 2026View
HISTORIC STAIRWELL INTERNAL ELEVATIONS - EXISTINGDrawing · PDF17 Sept 2026View
FABRIC ALTERATION NORTH AND SOUTH ELEVATIONSDrawing · PDF17 Sept 2026View
PROPOSED INTERNAL ELEVATIONS - LEVEL 03Drawing · PDF17 Sept 2026View
HISTORIC STAIRWELL INTERNAL ELEVATIONS - FABRIC ALTERATIONDrawing · PDF17 Sept 2026View
HISTORIC STAIRWELL INTERNAL ELEVATIONS PROPOSEDDrawing · PDF17 Sept 2026View
FRONT RAILING & INTERNAL LOBBY DOOR ELEVATIONSDrawing · PDF17 Sept 2026View
EXISTING THIRD FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING SECOND FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING FIRST FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING FOURTH FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING ROOF PLANDrawing · PDF17 Sept 2026View
EXISTING FIFTH FLOOR PLANDrawing · PDF17 Sept 2026View
EXISTING LOWER GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS SECOND FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS FOURTH FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS FIRST FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS THIRD FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS FIFTH FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS LOWER GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
FABRIC ALTERATIONS ROOF PLANDrawing · PDF17 Sept 2026View
EXISTING GROUND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED GROUND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING FIRST FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED FIRST FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
BOUNDARY SITE PLANDrawing · PDF17 Sept 2026View
EXISTING THIRD FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED THIRD FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING SECOND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED SECOND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING FOURTH FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING FIFTH FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED FOURTH FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING ROOF PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED FIFTH FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED ROOF PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
PROPOSED LOWER GROUND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING LOWER GROUND FLOOR PLANNING BOUNDARYDrawing · PDF17 Sept 2026View
EXISTING BOUNDARY SECTIONDrawing · PDF17 Sept 2026View
PROPOSED BOUNDARY SECTIONDrawing · PDF17 Sept 2026View
PROPOSED SECOND FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED THIRD FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED FIRST FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED FOURTH FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED FIFTH FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED ROOF PLANDrawing · PDF17 Sept 2026View
PROPOSED LOWER GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED GROUND FLOOR PLANDrawing · PDF17 Sept 2026View
PROPOSED GA SECTION 04Drawing · PDF17 Sept 2026View
PROPOSED GA SECTION 03Drawing · PDF17 Sept 2026View
EXISTING GA SECTION 01Drawing · PDF17 Sept 2026View
PROPOSED GA SECTION 01Drawing · PDF17 Sept 2026View
PROPOSED GA SECTION 02Drawing · PDF17 Sept 2026View
FABRIC ALTERATION GA SECTION 01Drawing · PDF17 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Target Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.