Provision of additional hotel bedrooms at ground and first floor within the envelope of existing hotel building (Use Class C1), following internal re-location of existing hotel facilities including the conversion of existing internal guest car parking area, guest coach parking area, bowling lane, meeting rooms and1 conversion of linen stores at levels 2-12. Provision of cycle facilities and works to pedestrian link route. Reinstatement of footway to closed vehicle access in Thorney Street. Change of Use of self-contained Class E caf/e use at ground floor entrance lobby for use as either, Class E caf/e use and/ or additional hotel lobby / ancillary hotel space
30 John Islip Street London SW1P 4DD
City of WestminsterReference 26/06157/FULLFull Planning Permission Application
Last published check: 20 Sept 2026, 13:00. Check the council record for more recent changes.
Provision of additional hotel bedrooms at ground and first floor within the envelope of existing hotel building (Use Class C1), following internal re-location of existing hotel facilities including the conversion of existing internal guest car parking area, guest coach parking area, bowling lane, meeting rooms and1 conversion of linen stores at levels 2-12. Provision of cycle facilities and works to pedestrian link route. Reinstatement of footway to closed vehicle access in Thorney Street. Change of Use of self-contained Class E caf/e use at ground floor entrance lobby for use as either, Class E caf/e use and/ or additional hotel lobby / ancillary hotel space
Reference
26/06157/FULL
Alternative references
PP-15199062
Ward
Vincent Square
Agent
Savills
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.