Awaiting decisionCouncil status: Pending

The construction of front and rear extensions at lower ground floor level; installation of air source heat pump within an acoustic enclosure to the rear; together with associated internal alterations; localised lowering and insulation of the basement floor; formation of new openings; repairs to the existing historic fabric; and landscaping works. (Linked with 26/06117/LBC)

25 Abbey Road London NW8 9AU

City of WestminsterReference 26/06116/FULLFull Planning Permission Application

Last published check: 18 Oct 2026, 16:04. Check the council record for more recent changes.

Status and dates

Last published check: 18 Oct 2026, 16:04 (UK)

  1. DoneReceived8 Sept 2026
  2. DoneValidated12 Oct 2026
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Target Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Permission Application
Ward
Abbey Road
Documents
17 published

Proposal

The construction of front and rear extensions at lower ground floor level; installation of air source heat pump within an acoustic enclosure to the rear; together with associated internal alterations; localised lowering and insulation of the basement floor; formation of new openings; repairs to the existing historic fabric; and landscaping works. (Linked with 26/06117/LBC)

Reference
26/06116/FULL
Alternative references
PP-15210823
Ward
Abbey Road
Agent
Unagru Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • NEIGHBOUR NOTIFICATION LETTER (21D)Background Papers15 Oct 2026View
  • SITE NOTICE 21 OR 28 DAYS IF T&C APPL.Background Papers15 Oct 2026View
  • CNSLT-LA SOCIETYBackground Papers15 Oct 2026View
  • ECNSLT-INTERNAL CONSULTSBackground Papers15 Oct 2026View
  • ECNSLT-INTERNAL CONSULTSBackground Papers15 Oct 2026View
  • ACK-GENERAL LETTER (G/P/C)Background Papers15 Oct 2026View
  • REVISED EXISTING AND PROPOSED DRAWINGSDrawing12 Oct 2026View
  • NOISE IMPACT ASSESSMENT.Noise impact assessment9 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.