Council planning record

Amendments to planning permission dated 08 November 2019 (RN: 19/02730/FULL) for the Use of part ground and upper floors as a 134-room hotel (Class C1); use of part lower ground as a leisure suite (Class D2); use of ground floor as restaurant/bar (Class A3/A4), external alterations, including demolition to include the removal of the rooftop plant enclosures and replacement with a single-storey extension, remodelling of the Little Sanctuary elevation and introduction of balconies and lightwells. NAMELY, to amend the description of development so that the reference to a 134-room hotel is amended to identify 134 rooms as the maximum number of hotel rooms permitted as part of the development.

8 - 10 Great George Street London SW1P 3AE

DecidedReference: 26/06050/NMACity of Westminster

Last published check: 20 Sept 2026, 22:28. Check the council record for more recent changes.

Application location

8 - 10 Great George Street London SW1P 3AE

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non-material amendments
Received
4 Sept 2026
Validated
4 Sept 2026
Determination deadline
Not published
Local authority
City of Westminster

Application overview

Amendments to planning permission dated 08 November 2019 (RN: 19/02730/FULL) for the Use of part ground and upper floors as a 134-room hotel (Class C1); use of part lower ground as a leisure suite (Class D2); use of ground floor as restaurant/bar (Class A3/A4), external alterations, including demolition to include the removal of the rooftop plant enclosures and replacement with a single-storey extension, remodelling of the Little Sanctuary elevation and introduction of balconies and lightwells. NAMELY, to amend the description of development so that the reference to a 134-room hotel is amended to identify 134 rooms as the maximum number of hotel rooms permitted as part of the development.

Proposal details

Reference
26/06050/NMA
Alternative references
PP-15202815
Ward
St James's
Agent
Newmark

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
GRANT NON MATERIAL AMENDMENTDecision Notice · PDF16 Sept 2026View
DELEGATED REPORTReport · PDF16 Sept 2026View
ACK - NON-MATERIAL AMENDMENTBackground Papers · PDF14 Sept 2026View
RECEIPT OF APPLICATIONOther · PDF11 Sept 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF4 Sept 2026View
FEECALCULATIONBackground Papers · PDF4 Sept 2026View
ATTACHMENTSUMMARYBackground Papers · PDF4 Sept 2026View
SITE LOCATION PLANDrawing · PDF4 Sept 2026View
COVER LETTERBackground Papers · PDF4 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
GRANT NON MATERIAL AMENDMENT

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.