Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Flat 1 109 Eaton Square London SW1W 9AA
Last published check: 27 Sept 2026, 11:26. Check the council record for more recent changes.
Flat 1 109 Eaton Square London SW1W 9AA
This record has no verified map location.
View council mapExternal and internal works, including replacement of existing vault doors with acoustic louvred doors associated with plant, replacement of existing security grilles to LGF front windows, demolition and rebuilding of existing closet wing infill extension at GF rear, replacement of external doors and windows and blocking up window opening to side of closet wing at GF level, opening up works for the purposes of investigation, demolition of and installation of partitions and suspended ceilings, replacement of internal doors, replacement of existing staircase, reinstatement and replacement of internal architectural features, installation of lighting, installation of new service routes associated with the plant and MEP and structural works. (Linked with 26/05890/FULL)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| ACK-GENERAL LETTER (G/P/C)Background Papers · PDF | 25 Sept 2026 | View |
| CNSLT-CONSULTEE CLOUD STDBackground Papers · PDF | 25 Sept 2026 | View |
| SITE NOTICE 21 OR 28 DAYS IF T&C APPL.Background Papers · PDF | 25 Sept 2026 | View |
| PROPOSED LOWER GROUND FLOOR GA PLANDrawing · PDF | 24 Sept 2026 | View |
| PROPOSED FRONT AND REAR BUILDING ELEVATIONSDrawing · PDF | 24 Sept 2026 | View |
| 2ND INVALID LETTERBackground Papers · PDF | 23 Sept 2026 | View |
| LOWER GROUND FLOOR COMFORT COOLING LAYOUTDrawing · PDF | 9 Sept 2026 | View |
| PROPOSED LOWER GROUND FLOOR GA PLANDrawing · PDF | 9 Sept 2026 | View |
| 1ST INVALID LETTERBackground Papers · PDF | 7 Sept 2026 | View |
| RECEIPT OF APPLICATIONOther · PDF | 2 Sept 2026 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 27 Aug 2026 | View |
| FIRE STRATEGYBackground Papers · PDF | 27 Aug 2026 | View |
| NOISE IMPACT ASSESSMENTAcoustic report · PDF | 27 Aug 2026 | View |
| STRUCTURAL STATEMENTStructural survey · PDF | 27 Aug 2026 | View |
| EXISTING GF GA PLANDrawing · PDF | 27 Aug 2026 | View |
| EXISTING LGF GA PLANDrawing · PDF | 27 Aug 2026 | View |
| EXISTING GF RCP PLANDrawing · PDF | 27 Aug 2026 | View |
| EXISTING LGF RCP PLANDrawing · PDF | 27 Aug 2026 | View |
| EXISTING FRONT AND REAR BUILDING ELEVATIONSDrawing · PDF | 27 Aug 2026 | View |
| EXISTING 1-1 BUILDING SECTIONDrawing · PDF | 27 Aug 2026 | View |
| EXISTING 2-2 BUILDING SECTIONDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION LOWER GROUND FLOOR PLANDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION GROUND FLOOR PLANDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION LOWER GROUND FLOOR RCP PLANDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION FRONT AND REAR BUILDING ELEVATIONSDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION GROUND FLOOR RCP PLANDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION 1-1 BUILDING SECTIONDrawing · PDF | 27 Aug 2026 | View |
| DEMOLITION 2-2 BUILDING SECTIONDrawing · PDF | 27 Aug 2026 | View |
| PROPOSED 1-1 BUILDING SECTIONDrawing · PDF | 27 Aug 2026 | View |
| PROPOSED GROUND FLOOR GA PLANDrawing · PDF | 27 Aug 2026 | View |
| PROPOSED GROUND FLOOR RCPDrawing · PDF | 27 Aug 2026 | View |
| TYPICAL FCU JOINERY DETAILSDrawing · PDF | 27 Aug 2026 | View |
| PROPOSED LOWER GROUND FLOOR RCPDrawing · PDF | 27 Aug 2026 | View |
| PROPOSED STAIRCASEDrawing · PDF | 27 Aug 2026 | View |
| T1 F1 GND POWERDrawing · PDF | 27 Aug 2026 | View |
| T1 F1 LWR GND POWERDrawing · PDF | 27 Aug 2026 | View |
| T1 F1 GND CCDrawing · PDF | 27 Aug 2026 | View |
| T1 F1 LWR GND CCDrawing · PDF | 27 Aug 2026 | View |
| OPENING UP WORKDrawing · PDF | 27 Aug 2026 | View |
| EXISTING SITE LOCATION PLANDrawing · PDF | 27 Aug 2026 | View |
| EXISTING SITE PLANDrawing · PDF | 27 Aug 2026 | View |
| DESIGN & ACCESS STATEMENTDesign and Access Statement · PDF | 27 Aug 2026 | View |
| ESQ109 HIA 109 EATON SQUARE FLAT 1 AUGUST 2026Heritage Statement · PDF | 27 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.