1 x Mimosa (T467): crown reduce to previous, most recent reduction points (between 3-5m), retaining furnishing growth at the reduction points to create a natural rounded canopy outline.1 x Box Elder (T464): reduce lower west canopy by 1-1.5m and cut back off neighbouring building to provide 1m clearance.1 x London plane (T465): crown reduce to previous, most recent reduction points.1 x London plane (T466): crown reduce to previous, most recent reduction points.1 x False acacia (T469): crown reduce back to previous, most recent reduction points, retaining shortened furnishing growth. Raise lower canopy to 3m. Shorten upper dead stem to 7m to old pruning points.1 x London plane (T471): Crown lift to 5.5m over road.1 x London plane (Tnn4): Cut back from building to provide 2m clearance.
1 x Mimosa (T467): crown reduce to previous, most recent reduction points (between 3-5m), retaining furnishing growth at the reduction points to create a natural rounded canopy outline.1 x Box Elder (T464): reduce lower west canopy by 1-1.5m and cut back off neighbouring building to provide 1m clearance.1 x London plane (T465): crown reduce to previous, most recent reduction points.1 x London plane (T466): crown reduce to previous, most recent reduction points.1 x False acacia (T469): crown reduce back to previous, most recent reduction points, retaining shortened furnishing growth. Raise lower canopy to 3m. Shorten upper dead stem to 7m to old pruning points.1 x London plane (T471): Crown lift to 5.5m over road.1 x London plane (Tnn4): Cut back from building to provide 2m clearance.
Reference
26/05851/TCA
Alternative references
PP-15185566
Ward
Knightsbridge & Belgravia
Agent
The Green Team Arboricultural Division Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.