Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Roxburghe House 273 - 287 Regent Street London W1B 2HA
Last published check: 14 Sept 2026, 18:04. Check the council record for more recent changes.
Roxburghe House 273 - 287 Regent Street London W1B 2HA
This record has no verified map location.
View council mapRefurbishment and extension of Roxburghe House and (unlisted) 39 and 40 Margaret Street, including new stair and lift core extension, UKPN substation and creation of localised openings in party walls to link the buildings; replacement of windows; internal and external improvements to upgrade the existing building fabric and introduction of core extension and plant enclosures at roof level of the buildings; facade cleaning; and associated ancillary works. At Roxburghe House: creation of rooftop terrace and pavilion; alterations to entrances; and lowering of some roof level windows. At Margaret Street (unlisted): replacement of ground floor slab, upward extension of the building and chimneys to provide an additional floor, plus creation of a roof terrace and pavilion at level 05; a new office entrance with glazed frontage, extension behind rear fa�ade; and associated ancillary works. (Linked with 26/05748/FULL)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| HISTORIC ENGLANDConsultee Comment · PDF | 10 Sept 2026 | View |
| HISTORIC ENGLANDConsultee Comment · PDF | 10 Sept 2026 | View |
| ACK-GENERAL LETTER (G/P/C)Background Papers · PDF | 2 Sept 2026 | View |
| CNSLT-CONSULTEE CLOUD STDBackground Papers · PDF | 2 Sept 2026 | View |
| ECNSLT-STD EXT CONSULTEESBackground Papers · PDF | 2 Sept 2026 | View |
| RECEIPT OF APPLICATIONOther · PDF | 26 Aug 2026 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 21 Aug 2026 | View |
| WHOLE LIFE CARBON ASSESSMENT (1)Other · PDF | 21 Aug 2026 | View |
| CIRCULAR ECONOMY STATEMENT PART 2 OF 2 (2)Other · PDF | 21 Aug 2026 | View |
| CIRCULAR ECONOMY STATEMENT PART 1 OF 2 (2)Other · PDF | 21 Aug 2026 | View |
| ENERGY ASSESSMENTEnergy Assessment · PDF | 21 Aug 2026 | View |
| 273REG SUSTAINABLE DESIGN STATEMENT 05.08.26 (2)Other · PDF | 21 Aug 2026 | View |
| DAYLIGHT AND SUNLIGHT AMENITY REPORT (ROXBURGHE HOUSE) V5.0 (1)Daylight and Sunlight assessment · PDF | 21 Aug 2026 | View |
| NOISE IMPACT ASSESSMENT (1)Background Papers · PDF | 21 Aug 2026 | View |
| 273 REG - AIR QUALITY ASSESSMENT (1)Background Papers · PDF | 21 Aug 2026 | View |
| TRANSPORT STATEMENT (1)Transport Statement · PDF | 21 Aug 2026 | View |
| REGENT STREET OWMS FINAL 1.0Other · PDF | 21 Aug 2026 | View |
| ROXBURGHE HOUSE TRAVEL PLAN (1)Background Papers · PDF | 21 Aug 2026 | View |
| ROXBURGHE HOUSE DELIVERY AND SERVICING PLAN (2)Other · PDF | 21 Aug 2026 | View |
| DRAINAGE STRATEGY REPORT (1)Other · PDF | 21 Aug 2026 | View |
| STRUCTURAL METHODOLOGY STATEMENT PART 1 OF 1Other · PDF | 21 Aug 2026 | View |
| ARCHAEOLOGICAL ASSESSMENT PART 1 OF 1 (2)Background Papers · PDF | 21 Aug 2026 | View |
| HERITAGE STATEMENTHeritage Statement · PDF | 21 Aug 2026 | View |
| APPLICANTS COVER LETTERBackground Papers · PDF | 21 Aug 2026 | View |
| SUSTAINABILITY AND RETROFIT FIRST REQUIREMENTS CHECKLISTOther · PDF | 21 Aug 2026 | View |
| ROXBURGHE HOUSE FIRE STATEMENT THE LONDON PLAN (MARCH 2021) PART 1 OF 1 (1)Background Papers · PDF | 21 Aug 2026 | View |
| 273REG-RAM-SITE WIDE_ROXBURGHE HOUSE_PART_L_2021_GLA_CARBON_EMISSION_REPORTING-POther | 21 Aug 2026 | View |
| PLANNING STATEMENT - FINALPlanning Statement · PDF | 21 Aug 2026 | View |
| ROXBURGHE HOUSE BIODIVERSITY NET GAIN EXEMPTION STATEMENT 07.08.26Other · PDF | 21 Aug 2026 | View |
| DAS PART 09 OF 17 - PAVILIONS AND ROOF TERRACESDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 10 OF 17 - AVR VIEWSDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 11 OF 17 - LANDSCAPING AND BIODIVERSITYDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 12 OF 17 - HERITAGE RETENTIONDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 13 OF 17 - RETROFIT STATEMENTDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 14 OF 17 - SERVICING STRATEGYDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 15 OF 17 - ACCESS STATEMENTDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 16 OF 17 - SECURITYDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 17 OF 17 - CONCLUSIONDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 01 OF 17 - INTRODUCTIONDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 02 OF 17 - SITE AND EXISTING BUILDINGDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 03 OF 17 - VISION AND PROPOSED INTERVENTIONSDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 04 OF 17 - OFFICE ENTRANCEDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 05 OF 17 - RETAIL ENHANCEMENTDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 06 OF 17 - THERMAL UPGRADESDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 07 OF 17 - NEW CORE AND OFFICE FLOORSDesign and Access Statement · PDF | 21 Aug 2026 | View |
| DAS PART 08 OF 17 - MARGARET STREETDesign and Access Statement · PDF | 21 Aug 2026 | View |
| BLOCK PLANDrawing · PDF | 21 Aug 2026 | View |
| SITE PLAN (1)Background Papers · PDF | 21 Aug 2026 | View |
| LEVEL RH04 MSRF - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH05 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH06 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH07 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RHRF - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| NORTH ELEVATION - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SECTION AA - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SECTION BB - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SECTION CC - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SECTION DD - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SECTION EE - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| SOUTH ELEVATION - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| WEST ELEVATION - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| EAST- NORTH EAST- SOUTH EAST ELEVATION - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL B1 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL GF - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL GF MEZZANINE - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL MS03 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH01 MS01 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH02 MS02 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH03 MS04 - EXISTINGDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH02 MS02 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH03 MS04 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH04 MSRF - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH05 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH06 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH07 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| NORTH ELEVATION - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SECTION AA - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SECTION BB - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SECTION CC - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SECTION DD - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SECTION EE - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| SOUTH ELEVATION - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| WEST ELEVATION - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| EAST- NORTH EAST- SOUTH EAST ELEVATION - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL B1 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL GF - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL GF MEZZANINE - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL MS03 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH01 MS01 - DEMOLITIONDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH07 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RHRF - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| NORTH ELEVATION - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SECTION AA - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SECTION BB - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SECTION CC - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SECTION DD - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SECTION EE - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| SOUTH ELEVATION - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| WEST ELEVATION - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| EAST- NORTH EAST- SOUTH EAST ELEVATION - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL B1 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL GF - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL MS03 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH01 MS01 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH02 MS02 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH03 MS04 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH04 MS05 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH05 MSRF - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
| LEVEL RH06 - PROPOSEDDrawing · PDF | 21 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.