Details of the maintenance and management of the sustainable drainage scheme including a full CCTV survey prior to above ground work (excluding demolition), details to show that the proposed development will achieve full 'Secured by Design' Accreditation, details of an updated version of the Whole Life Carbon Assessment prior to commencement of any work on site including all works of deconstruction and demolition, details of a Circular Economy Statement, details of a site investigation and remediation strategy and details of the depth and area and overall volume of the of the new soils which you propose to use to create an adequate rooting environment for new tree planting and landscaping at ground level, including details of the drainage layer and other components, the soil specification and profile, the way that the proposed areas of soil will be connected to existing soil, and how the trees will be irrigated and maintained pursuant to condition 3(IV), 14(A), 23(A), 24(A), 26(Phase 2 and Phase 3), 37 of planning permission dated 31st July 2026 (RN:25/08914/FULL)
Details of the maintenance and management of the sustainable drainage scheme including a full CCTV survey prior to above ground work (excluding demolition), details to show that the proposed development will achieve full 'Secured by Design' Accreditation, details of an updated version of the Whole Life Carbon Assessment prior to commencement of any work on site including all works of deconstruction and demolition, details of a Circular Economy Statement, details of a site investigation and remediation strategy and details of the depth and area and overall volume of the of the new soils which you propose to use to create an adequate rooting environment for new tree planting and landscaping at ground level, including details of the drainage layer and other components, the soil specification and profile, the way that the proposed areas of soil will be connected to existing soil, and how the trees will be irrigated and maintained pursuant to condition 3(IV), 14(A), 23(A), 24(A), 26(Phase 2 and Phase 3), 37 of planning permission dated 31st July 2026 (RN:25/08914/FULL)
Reference
26/05723/ADFULL
Alternative references
PP-15155286
Ward
Hyde Park
Agent
Montagu Evans
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.