Awaiting decisionCouncil status: Pending

Internal refurbishment and reconfiguration comprising the selective removal and alteration of internal walls to facilitate the revised hotel layout; removal of later twentieth-century alterations; rationalisation of floor levels; replacement and reconfiguration of lift and secondary stair arrangements; retention, repair and restoration of surviving historic fabric, including original staircases, chimney breast features and basement vaults; reinstatement of front lightwells; associated structural works; and all other ancillary works in connection with the continued use of the property as a hotel (Class C1). (Linked with 26/05523/FULL)

Holiday Villa Hotel 35 - 39 Leinster Gardens London W2 3AN

City of WestminsterReference 26/05524/LBCListed Building Consent Application

Last published check: 15 Sept 2026, 01:08. Check the council record for more recent changes.

Status and dates

Last published check: 15 Sept 2026, 01:08 (UK)

  1. DoneReceived13 Aug 2026
  2. DoneValidated13 Aug 2026
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent Application
Ward
Lancaster Gate
Documents
95 published

Proposal

Internal refurbishment and reconfiguration comprising the selective removal and alteration of internal walls to facilitate the revised hotel layout; removal of later twentieth-century alterations; rationalisation of floor levels; replacement and reconfiguration of lift and secondary stair arrangements; retention, repair and restoration of surviving historic fabric, including original staircases, chimney breast features and basement vaults; reinstatement of front lightwells; associated structural works; and all other ancillary works in connection with the continued use of the property as a hotel (Class C1). (Linked with 26/05523/FULL)

Reference
26/05524/LBC
Alternative references
PP-15148293
Ward
Lancaster Gate
Agent
DP9 Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OBJECTIONPublic Comment10 Sept 2026View
  • HISTORIC ENGLANDConsultee Comment26 Aug 2026View
  • ACK-GENERAL LETTER (G/P/C)Background Papers20 Aug 2026View
  • CNSLT-CONSULTEE CLOUD STDBackground Papers20 Aug 2026View
  • HISTORIC ENGLANDConsultee Comment20 Aug 2026View
  • HISTORIC ENGLANDConsultee Comment20 Aug 2026View
  • RECEIPT OF APPLICATIONOther18 Aug 2026View
  • APPLICATIONFORMREDACTEDApplication Form13 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.