ApprovedCouncil status: Decided

Amendments to planning permission dated 24th May 2022 (RN:19/08460/FULL) for Demolition and erection of above ground structures in conjunction with the use of an underground car park (Sui Generis) as a flexible mixed use commercial development comprising uses within the following use classes A1-A5, B1,B2, B8, C1, C2, D1, and D2 along with the excavation of a 4th basement level, new entrances and associated landscaping and highways works to provide up to 25,953 sqm (GIA) of floorspace. Namely, a series of updated drawings relating to the southern entrance, gardeners pavilion, northeast pavilion, and the extent of pavement lights and grilles.

Underground Car Park Cavendish Square London W1G 0PG

City of WestminsterReference 26/05469/NMANon-material amendments

Last published check: 14 Sept 2026, 20:36. Check the council record for more recent changes.

Status and dates

Last published check: 14 Sept 2026, 20:36 (UK)

  1. DoneReceived12 Aug 2026
  2. DoneValidated18 Aug 2026
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApplication Permitted11 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Non-material amendments
Ward
West End
Documents
28 published

Proposal

Amendments to planning permission dated 24th May 2022 (RN:19/08460/FULL) for Demolition and erection of above ground structures in conjunction with the use of an underground car park (Sui Generis) as a flexible mixed use commercial development comprising uses within the following use classes A1-A5, B1,B2, B8, C1, C2, D1, and D2 along with the excavation of a 4th basement level, new entrances and associated landscaping and highways works to provide up to 25,953 sqm (GIA) of floorspace. Namely, a series of updated drawings relating to the southern entrance, gardeners pavilion, northeast pavilion, and the extent of pavement lights and grilles.

Reference
26/05469/NMA
Alternative references
PP-15148213
Ward
West End
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • GRANT NON MATERIAL AMENDMENTDecision Notice11 Sept 2026View
  • DELEGATED REPORTReport11 Sept 2026View
  • ACK - NON-MATERIAL AMENDMENTBackground Papers20 Aug 2026View
  • PROPOSED NORTH ELEVATIONDrawing18 Aug 2026View
  • PROPOSED EAST ELEVATIONDrawing18 Aug 2026View
  • PROPOSED SOUTH ELEVATIONDrawing18 Aug 2026View
  • PROPOSED WEST ELEVATIONDrawing18 Aug 2026View
  • PROPOSED SOUTH ENTRANCEDrawing18 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Permitted
GRANT NON MATERIAL AMENDMENT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.