ApprovedCouncil status: Decided

Detailed written and photographic specification of the facing materials you propose to use, including glazing, along with annotated versions of the approved elevations and roof plans demonstrating the usage of each of the proposed materials and details of further information about the new windows and doors (detailed elevation and sections at 1:10), detailed bay studies of each section of new outward-facing fa�ade (detailed elevations and sections at 1:20), new entrance canopy (detailed elevations and sections at 1:20), new photovoltaic (PV) units at upper roof level (detailed elevations and sections at 1:20) pursuant to condition 11 and 12 of planning permission dated 7th January 2025 (RN:24/02202/FULL)

68 - 71 Newman Street London W1T 3EQ

City of WestminsterReference 26/05451/ADFULLApproval of Details (Full PP)

Last published check: 21 Sept 2026, 07:26. Check the council record for more recent changes.

Status and dates

Last published check: 21 Sept 2026, 07:26 (UK)

  1. DoneReceived11 Aug 2026
  2. DoneValidated13 Aug 2026
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedApplication Permitted21 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Approval of Details (Full PP)
Ward
West End
Documents
13 published

Proposal

Detailed written and photographic specification of the facing materials you propose to use, including glazing, along with annotated versions of the approved elevations and roof plans demonstrating the usage of each of the proposed materials and details of further information about the new windows and doors (detailed elevation and sections at 1:10), detailed bay studies of each section of new outward-facing fa�ade (detailed elevations and sections at 1:20), new entrance canopy (detailed elevations and sections at 1:20), new photovoltaic (PV) units at upper roof level (detailed elevations and sections at 1:20) pursuant to condition 11 and 12 of planning permission dated 7th January 2025 (RN:24/02202/FULL)

Reference
26/05451/ADFULL
Alternative references
PP-15146838
Ward
West End
Agent
DP9

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • APPR. OF DETAILS-FULL RESMAT [PE]Decision Notice21 Aug 2026View
  • DELEGATED REPORTReport21 Aug 2026View
  • ACK-APPROVAL OF DETAILS APPL.Background Papers20 Aug 2026View
  • RECEIPT OF APPLICATIONOther13 Aug 2026View
  • 1ST INVALID LETTERBackground Papers13 Aug 2026View
  • NEWMAN STREET - PLANNING CONDITION 11Other13 Aug 2026View
  • NEWMAN STREET - PLANNING CONDITION 12Other13 Aug 2026View
  • APPLICATIONFORMREDACTEDApplication Form11 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Application Permitted
APPR. OF DETAILS-FULL RESMAT [PE]

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.