Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
21 - 23 New Bond Street London W1S 2RE
Last published check: 21 Sept 2026, 10:02. Check the council record for more recent changes.
21 - 23 New Bond Street London W1S 2RE
This record has no verified map location.
View council mapDisplay of illuminated festive decorations for a temporary period.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| GRANT OF ADVERT CONSENT [PE]Decision Notice · PDF | 20 Aug 2026 | View |
| DELEGATED REPORTReport · PDF | 20 Aug 2026 | View |
| ACK-GENERAL LETTER (G/P/C)Background Papers · PDF | 19 Aug 2026 | View |
| RECEIPT OF APPLICATIONOther · PDF | 12 Aug 2026 | View |
| 1ST INVALID LETTERBackground Papers · PDF | 12 Aug 2026 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 6 Aug 2026 | View |
| PROPOSED FRONT ELEVATION - NEW BOND STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED FRONT ELEVATION - CONDUIT STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED HORIZONTAL RIBBON STRUCTUREDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED HORIZONTAL RIBBONDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED RIBBON STRUCTURAL DETAILSDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED VERTICAL RIBBON STRUCTUREDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED VERTICAL RIBBONDrawing · PDF | 6 Aug 2026 | View |
| 1-353-01PL-002-EXISTING ELEVATION - NEW BOND STREETDrawing · PDF | 6 Aug 2026 | View |
| 1-353-01PL-003-EXISTING ELEVATION - CONDUIT STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED BOW AXONOMETRICDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED BOW LIGHTINGDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED BOWDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED ELECTRICAL DETAILSDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED FACADE ANCHOR POINTS - CONDUIT STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED FACADE ANCHOR POINTS - NEW BOND STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED FACADE LIGHTING - CONDUIT STREETDrawing · PDF | 6 Aug 2026 | View |
| PROPOSED FACADE LIGHTING - NEW BOND STREETDrawing · PDF | 6 Aug 2026 | View |
| 1-353-01PL-005-SITE PLANDrawing · PDF | 6 Aug 2026 | View |
| SITE LOCATION PLAN (OS MAP)Location Plan · PDF | 6 Aug 2026 | View |
| DAS AND HERITAGE STATEMENTDesign and Access Statement · PDF | 6 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.