Council planning record

Like-for-like reconstruction of the front elevation and chimney, including reinstatement of the balcony, architectural detailing, pebble-dash finish, timber sash windows and front door.

13 Abercorn Place NW8 9EA

PendingReference: 26/05199/FULLCity of Westminster

Last published check: 28 Sept 2026, 13:10. Check the council record for more recent changes.

Application location

13 Abercorn Place NW8 9EA

This record has no verified map location.

View council map

Application summary

Status
Pending
Application type
Full Planning Permission Application
Received
31 Jul 2026
Validated
31 Jul 2026
Determination deadline
Not published
Local authority
City of Westminster

Application overview

Like-for-like reconstruction of the front elevation and chimney, including reinstatement of the balcony, architectural detailing, pebble-dash finish, timber sash windows and front door.

Proposal details

Reference
26/05199/FULL
Alternative references
PP-15124769
Ward
Abbey Road
Agent
Joe Wright Architects Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 33 of 33

DocumentPublishedAction
FACADE STRUCTURE TWMPORARY WORKSReport · PDF24 Aug 2026View
BUILDING CONTROL COMMENTConsultee Comment · PDF13 Aug 2026View
ACK-GENERAL LETTER (G/P/C)Background Papers · PDF11 Aug 2026View
ECNSLT-INTERNAL CONSULTSBackground Papers · PDF11 Aug 2026View
CNSLT-LA SOCIETYBackground Papers · PDF11 Aug 2026View
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.Background Papers · PDF11 Aug 2026View
NEIGHBOUR NOTIFICATION LETTER (21D)Background Papers · PDF11 Aug 2026View
RECEIPT OF APPLICATIONOther · PDF6 Aug 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF31 Jul 2026View
ATTACHMENTSUMMARYBackground Papers · PDF31 Jul 2026View
COMBINED DRAWINGSDrawing · PDF31 Jul 2026View
BLOCK PLAN OF THE SITE_INCLUDED_IN_ADDITIONAL PLANSDrawing · PDF31 Jul 2026View
DETAIL DRAWING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ELEVATION (FRONT) - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ELEVATION (FRONT) - PROPOSED_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
FLOOR PLAN_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
FLOOR PLAN - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ROOF PLAN - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
ROOF PLAN - PROPOSED_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
SECTION - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
SECTION - PROPOSED_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
SITE LEVELS PLAN - PROPOSED_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
SITEBLOCK PLAN - EXISTING_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
THE LOCATION PLAN_INCLUDED_IN_ADDITIONAL PLANSBackground Papers · PDF31 Jul 2026View
DESIGN AND PLANNING STATEMENTDesign and Access Statement · PDF31 Jul 2026View
PLANNING STATEMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENTBackground Papers · PDF31 Jul 2026View
FRONT FACADE DEFECT RECORDBackground Papers · PDF31 Jul 2026View
TEMPORARY WORKS - FACADE OPTION 1 - REBUILDINGDrawing · PDF31 Jul 2026View
TEMPORARY WORKS - FACADE OPTION 1 - REBUILDINGDrawing · PDF31 Jul 2026View
FRONT WALL LETTERBackground Papers · PDF31 Jul 2026View
HERITAGE AND SUSTAINIBILITY STATEMENTHeritage Statement · PDF31 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.