Council planning record

Replacement of the existing rear single-storey conservatory with a two-storey glazed infill extension and roof terrace above; Removal of terrace and extension of the existing closet wing; Enlargement of the bin store beneath the front approach path and steps; Installation of lightweight lean-to structure; installation of heritage conservation roof windows; Replacement of all windows with double glazed timber units and installation of an air conditioning unit in the front lightwell within acoustic enclosure; and associated external alterations.

19 Randolph Avenue London W9 1BH

DecidedReference: 26/03036/FULLCity of Westminster

Last published check: 28 Sept 2026, 01:25. Check the council record for more recent changes.

Application location

19 Randolph Avenue London W9 1BH

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission Application
Received
8 May 2026
Validated
12 Jun 2026
Determination deadline
Not published
Local authority
City of Westminster

Application overview

Replacement of the existing rear single-storey conservatory with a two-storey glazed infill extension and roof terrace above; Removal of terrace and extension of the existing closet wing; Enlargement of the bin store beneath the front approach path and steps; Installation of lightweight lean-to structure; installation of heritage conservation roof windows; Replacement of all windows with double glazed timber units and installation of an air conditioning unit in the front lightwell within acoustic enclosure; and associated external alterations.

Proposal details

Reference
26/03036/FULL
Alternative references
PP-14899790
Ward
Little Venice
Agent
Forward Planning and Development

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 40 of 40

DocumentPublishedAction
GRANT OF FULL PP [PE]Decision Notice · PDF6 Aug 2026View
DELEGATED REPORTReport · PDF6 Aug 2026View
ACK-GENERAL LETTER (G/P/C)Background Papers · PDF15 Jun 2026View
ECNSLT-INTERNAL CONSULTSBackground Papers · PDF15 Jun 2026View
CNSLT-LA SOCIETYBackground Papers · PDF15 Jun 2026View
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.Background Papers · PDF15 Jun 2026View
NEIGHBOUR NOTIFICATION LETTER (21D)Background Papers · PDF15 Jun 2026View
FLOOD RISK ASSESSMENTFlood risk assessment · PDF12 Jun 2026View
1ST INVALID LETTERBackground Papers · PDF21 May 2026View
RECEIPT OF APPLICATIONOther · PDF13 May 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF8 May 2026View
DESIGN AND ACCESS STATEMENTDesign and Access Statement · PDF8 May 2026View
EXISTING LOCATION PLANLocation Plan · PDF8 May 2026View
PROPOSED LOCATION PLANLocation Plan · PDF8 May 2026View
EXISTING SITE PLANDrawing · PDF8 May 2026View
PROPOSED SITE PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION GROUND FLOOR PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION FIRST FLOOR PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION SECOND FLOOR PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION THIRD FLOOR PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION ROOF PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION LOWER GROUND FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED LOWER GROUND FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED GROUND FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED FIRST FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED SECOND FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED THIRD FLOOR PLANDrawing · PDF8 May 2026View
PROPOSED ROOF PLANDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION FRONT ELEVATION NORTH EASTDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION - REAR ELEVATION SOUTH WESTDrawing · PDF8 May 2026View
EXISTING AND DEMOLITION - SECTION ADrawing · PDF8 May 2026View
EXISTING AND DEMOLITION - SECTION BDrawing · PDF8 May 2026View
PROPOSED FRONT ELEVATION NORTH EASTDrawing · PDF8 May 2026View
PROPOSED REAR ELEVATION SOUTH WESTDrawing · PDF8 May 2026View
PROPOSED SECTION ADrawing · PDF8 May 2026View
PROPOSED SECTION BDrawing · PDF8 May 2026View
NOISE IMPACT ASSESSMENTNoise impact assessment · PDF8 May 2026View
ARBORICULTURAL IMPACT ASSESSMENT METHOD STATEMENT AND TREE PROTECTION PLANTree Survey · PDF8 May 2026View
SUSTAINABLE DESIGN STATEMENTBackground Papers8 May 2026View
COVER LETTER/PLANNING STATEMENTBackground Papers · PDF8 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Target Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Permitted
GRANT OF FULL PP [PE]
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.