Variation/removal of Conditions 1, 5, 6, 19, 22, and 23 of planning permission 2nd October 2025 (RN: 25/04904/FULL), which itself varied Condition 1 of planning permission dated 4th June 2025 (RN: 25/01184/FULL), which itself varied Conditions 1 and 6 of planning permission dated 11th September 2020 (RN:19/06794/FULL) for demolition behind the retained New Bond Street facade and erection of a new building comprising sub-basement, basement, ground and six upper storeys for use as retail (Class E( a)) at basement, part ground and mezzanine floors; offices (Class E(g)(i)) at part ground, third to sixth floors; and dual/alternative use of the first and second floor as either offices (Class E(g)(i)) and/or retail (Class E(a)). Office access to be via Haunch of Venison Yard. Installation of plant at sub-basement and roof levels, terraces at upper floors and cycle storage and waste stores within basement level; NAMELY, to make the following amendments to the approved development - to enable Level 06 roof to be used as a roof terrace, reconfigure the basement layout, inclusion of structural panel to glazing at Level 04, and to increase lift overrun. (Application under Section 73).
Development Site At 105-106 New Bond Street And 18 Haunch Of Venison Yard London
City of WestminsterReference 26/02902/FULLFull Planning Permission Application
Last published check: 20 Oct 2026, 17:35. Check the council record for more recent changes.
Variation/removal of Conditions 1, 5, 6, 19, 22, and 23 of planning permission 2nd October 2025 (RN: 25/04904/FULL), which itself varied Condition 1 of planning permission dated 4th June 2025 (RN: 25/01184/FULL), which itself varied Conditions 1 and 6 of planning permission dated 11th September 2020 (RN:19/06794/FULL) for demolition behind the retained New Bond Street facade and erection of a new building comprising sub-basement, basement, ground and six upper storeys for use as retail (Class E( a)) at basement, part ground and mezzanine floors; offices (Class E(g)(i)) at part ground, third to sixth floors; and dual/alternative use of the first and second floor as either offices (Class E(g)(i)) and/or retail (Class E(a)). Office access to be via Haunch of Venison Yard. Installation of plant at sub-basement and roof levels, terraces at upper floors and cycle storage and waste stores within basement level; NAMELY, to make the following amendments to the approved development - to enable Level 06 roof to be used as a roof terrace, reconfigure the basement layout, inclusion of structural panel to glazing at Level 04, and to increase lift overrun. (Application under Section 73).
Reference
26/02902/FULL
Alternative references
PP-14897671
Ward
West End
Agent
CBRE Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.