Front garden: 1 x lime (T2): remove epicormic growth from ground level to main crown break at about 7m. Crown thin by up to 20% (pruning wounds no greater than 3cm in diameter). Reduce height by about 3.5m and reduce lateral branches by approximately 2m, pruning to suitable secondary growth points, forming a naturally balanced canopy outline. 1 x lime (T4): remove epicormic growth from ground level to main crown break at about 7m. Crown thin by up to 20% (pruning wounds no greater than 3cm in diameter). Selective reduce lateral branches (not reducing the height of the tree) by about 2m, pruning to suitable secondary growth points, forming a naturally balanced canopy outline. 1 x cherry (T5): fell
21 Cavendish Close London NW8 9JB
City of WestminsterReference 26/02752/TPOApplic. for wks to trees subject to TPO
Last published check: 23 Oct 2026, 14:38. Check the council record for more recent changes.
Front garden: 1 x lime (T2): remove epicormic growth from ground level to main crown break at about 7m. Crown thin by up to 20% (pruning wounds no greater than 3cm in diameter). Reduce height by about 3.5m and reduce lateral branches by approximately 2m, pruning to suitable secondary growth points, forming a naturally balanced canopy outline. 1 x lime (T4): remove epicormic growth from ground level to main crown break at about 7m. Crown thin by up to 20% (pruning wounds no greater than 3cm in diameter). Selective reduce lateral branches (not reducing the height of the tree) by about 2m, pruning to suitable secondary growth points, forming a naturally balanced canopy outline. 1 x cherry (T5): fell
Reference
26/02752/TPO
Ward
Abbey Road
Agent
Trevor Heaps Arboricultural Consultancy Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.