Variation of condition 1 of planning permission dated 19 February 2024 (RN: 23/06458/FULL) for the: Removal of facades at Ground & First; New Entrance, with stone features, glazed facade, new entrance doors, and new planters; Replacement of windows; New louvred shutters to South-facing windows; Replacement MEP services and associated plant; New cycle storage in basement; Upgrade to internal offices; New roof covering & insulation and associated works. NAMELY, to allow the installation of photovoltaic (PV) panels on the roof and associated adjustment to the position and extent of the handrails. (Application under Section 73 of the Act).
33 Robert Adam Street London W1U 3HP
City of WestminsterReference 26/02559/FULLFull Planning Permission Application
Last published check: 2 Nov 2026, 07:47. Check the council record for more recent changes.
Variation of condition 1 of planning permission dated 19 February 2024 (RN: 23/06458/FULL) for the: Removal of facades at Ground & First; New Entrance, with stone features, glazed facade, new entrance doors, and new planters; Replacement of windows; New louvred shutters to South-facing windows; Replacement MEP services and associated plant; New cycle storage in basement; Upgrade to internal offices; New roof covering & insulation and associated works. NAMELY, to allow the installation of photovoltaic (PV) panels on the roof and associated adjustment to the position and extent of the handrails. (Application under Section 73 of the Act).
Reference
26/02559/FULL
Alternative references
PP-14847784
Ward
Marylebone
Agent
Garnett Architecture LLP
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.